“BIM not just for new buildings”
January 2012
How the Ohio State University Medical Center converted 55 existing buildings from AutoCAD to BIM to improve quality and speed of decision making for facility management, maintenance, and future renovations.
“Two new BIM tools that make your project easier to manage”
December 2011
Two innovations demonstrate how fabricators and owner’s reps are stepping in to fill the gaps between construction and design that can be exposed by working with a 3D model.
/two-new-bim-tools-make-your-project-easier-manage
“Handy apps for AEC professionals”
April 2012
Helpful mobile apps for everyday design and construction tasks, Including BIM/VDC. Our fave: MagicPlan, which uses GPS to help you quickly measure and draw a floor plan of any room.
/18-handy-tablet-apps-aec-professionals
“Top 25 BIM AEC Firms: BIM finally starting to pay off for AEC firms, but there’s a long way to go”
July 2012
Survey of top 25 Giants 300 firms on their use of BIM. BD+C editors asked: Is BIM paying off—through cost savings, higher quality, or client satisfaction? See what leaders at Barton Malow, NELSON, Magnusson Klemencic Associates, KJWW Engineering, Syska Hennessy Group, EwingCole, Graef, and BRPH say about their firms’ use of BIM.
/bim-finally-starting-pay-aec-firms
“BIM in the academy: Lessons for the AEC industry”
May 2012
John Tocci, Jr., Manager of Virtual Design and Construction at Gilbane Building Company, reviews BIM in Academia, a new book that looks to reevaluate BIM’s place in the world of architectural education.
“BIM becomes VDC:A case study in disruption”
December 2012
The growth of BIM is heralding a true disruption in the construction industry, says John Tobin, LEED AP, Director of Architecture at EYP Architecture & Engineering. It is transforming markets and revolutionizing expectations.
Related Stories
BIM and Information Technology | Mar 23, 2015
Skanska hosts three-week 'hackathon' to find architect for Seattle tower development
Searching for a nimble, collaborative design firm for its 2&U tower project in Seattle, the construction giant ditches the traditional RFQ/RFP process for a hackathon-inspired competition.
Healthcare Facilities | Mar 23, 2015
Can advanced elevator technology take vertical hospitals to the next level?
VOA's Douglas King recalls the Odyssey project and ponders vertical transportation in high-rise healthcare design.
Healthcare Facilities | Mar 22, 2015
New Joplin, Mo., hospital built to tornado-resistant standards
The new hospital features a window and frame system that can protect patients from winds of up to 250 mph.
Sports and Recreational Facilities | Mar 19, 2015
Populous design wins competition for UK's most sustainable arena
The live-concert venue will seat an audience of 12,000, which the firm says will be masked by “the atmosphere and intimacy of a 4,000-seat amphitheatre.”
Architects | Mar 18, 2015
Architecture Billings Index rises in February
The ABI score was 50.4 last month, up slightly from a mark of 49.9 in January. This score reflects a minor increase in design services, according to AIA.
Multifamily Housing | Mar 18, 2015
Prefabricated skycubes proposed with 'elastic' living apartments inside
The interiors for each unit are designed using an elastic living concept, where different spaces are created by sliding on tracks.
Architects | Mar 18, 2015
Boston selects finalists in resilient design competition
The competition asks for creative approaches for planning for a not-so-distant future Boston where higher sea levels and more frequent flooding will be real and critical issues to contend with.
Cultural Facilities | Mar 17, 2015
The High Line’s co-designer wins contract for The Underline in Miami
James Corner Field Operations will design the master plan for this 10-mile restoration project.
Sponsored | | Mar 17, 2015
Are face-to-face meetings still important?
One CEO looks pass convenience and advocates for old school, in-person meetings.
High-rise Construction | Mar 16, 2015
NBBJ creates 'shadowless' skyscraper concept for proposed UK development
A team of architects from the London branch of NBBJ used computer algorithms to generate a dual-tower design that maximizes sunlight reflections to eliminate the buildings' shadows.