flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Top BIM Engineering Firms [2013 Giants 300 Report]

Top BIM Engineering Firms [2013 Giants 300 Report]

Jacobs, URS, SAIC top Building Design+Construction's 2013 ranking of the engineering and engineering/architecture firms with the most revenue from BIM-driven projects.


By BD+C Staff | July 19, 2013
Courtesy SmithGroup
Courtesy SmithGroup
Rank Company 2012 BIM Revenue ($)
1 Jacobs Engineering Group $4,465,746,000
2 URS Corp. $292,864,749
3 Science Applications International Corp. $131,066,235
4 Arup $123,364,028
5 Merrick & Co. $106,000,000
6 SSOE Group $99,560,561
7 Thornton Tomasetti $93,431,545
8 Buro Happold Consulting Engineers $78,006,000
9 Middough $60,000,000
9 KPFF Consulting Engineers $60,000,000
11 KJWW Engineering Consultants $51,092,154
12 Clark Nexsen $37,364,300
13 Vanderweil Engineers $32,858,900
14 Bard, Rao + Athanas Consulting Engineers $32,000,000
15 Magnusson Klemencic Associates $31,843,000
16 Henderson Engineers $31,742,887
17 Glumac $30,116,000
18 Walter P Moore $29,092,693
19 Affiliated Engineers $28,907,000
20 M-E Engineers $28,500,000
21 H&A Architects & Engineers $27,734,657
22 Michael Baker Jr. $25,900,000
23 Degenkolb Engineers $23,647,736
24 TLC Engineering for Architecture $22,700,613
25 Heapy Engineering $21,674,602
26 STV $21,051,000
27 Haynes Whaley Associates $19,740,185
28 CCRD Partners $19,000,000
29 TTG $18,395,200
30 Syska Hennessy Group $18,015,883
31 Smith Seckman Reid $18,000,000
32 Paulus, Sokolowski and Sartor $15,200,000
33 Environmental Systems Design $14,338,994
34 GRAEF $12,600,000
35 Interface Engineering $10,772,782
36 BRPH $10,136,212
37 Rist-Frost-Shumway Engineering $8,000,000
37 Barge, Waggoner, Sumner and Cannon $8,000,000
39 M/E Engineering $7,500,000
40 Newcomb & Boyd $6,331,085
41 Dunham Associates $6,000,000
42 Bridgers & Paxton Consulting Engineers $5,735,421
43 Bergmann Associates $5,500,000
43 Simpson Gumpertz & Heger $5,500,000
45 Dewberry $5,412,709
46 CJL Engineering $5,197,143
47 Peter Basso Associates $5,000,000
48 Zak Companies $4,543,488
49 H.F. Lenz $4,050,000
50 Wallace Engineering $4,000,000
50 Hixson Architecture, Engineering, Interiors $4,000,000
52 KLH Engineers $3,518,208
53 Coffman Engineers $3,000,000
54 Ross & Baruzzini $2,407,000
55 Sparling $2,156,592
56 Wick Fisher White $2,113,000
57 AKF Group $2,000,000
58 RDK Engineers $1,985,000
59 GHT Limited $1,600,000
60 P2S Engineering $1,452,000
61 RMF Engineering Design $1,250,000
62 Brinjac Engineering $1,224,543
63 Aon Fire Protection Engineering $1,000,000
64 Mazzetti $714,544
65 ThermalTech Engineering $500,000
66 FBA Engineering $500,000
67 GRW $462,300
68 Bala Consulting Engineers $400,000
69 Primera Engineers $393,000
70 Walker Parking Consultants $380,361
71 Apogee Consulting Group $309,000
72 KCI Technologies $255,000
73 Kamm Consulting $113,494
74 Allen & Shariff $112,000
75 G&W Engineering $60,000

 

Back to BIM Giants article

 

Read the full 2013 Giants 300 Report

Related Stories

| Apr 12, 2011

American Institute of Architects announces Guide for Sustainable Projects

AIA Guide for Sustainable Projects to provide design and construction industries with roadmap for working on sustainable projects.

| Apr 11, 2011

Wind turbines to generate power for new UNT football stadium

The University of North Texas has received a $2 million grant from the State Energy Conservation Office to install three wind turbines that will feed the electrical grid and provide power to UNT’s new football stadium. 

| Apr 8, 2011

SHW Group appoints Marjorie K. Simmons as CEO

Chairman of the Board Marjorie K. Simmons assumes CEO position, making SHW Group the only firm in the AIA Large Firm Roundtable to appoint a woman to this leadership position

| Apr 5, 2011

Zaha Hadid’s civic center design divides California city

Architect Zaha Hadid  is in high demand these days, designing projects in Hong Kong, Milan, and Seoul, not to mention the London Aquatics Center, the swimming arena for the 2012 Olympics. But one of the firm’s smaller clients, the city of Elk Grove, Calif., recently conjured far different kinds of aquatic life when members of the City Council and the public chose words like “squid,” “octopus,” and “starfish” to describe the latest renderings for a proposed civic center.

| Apr 5, 2011

Are architects falling behind on BIM?

A study by the National Building Specification arm of RIBA Enterprises showed that 43% of architects and others in the industry had still not heard of BIM, let alone started using it. It also found that of the 13% of respondents who were using BIM only a third thought they would be using it for most of their projects in a year’s time.

boombox1
boombox2
native1

More In Category




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021