flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Top BIM Engineering Firms [2013 Giants 300 Report]

Top BIM Engineering Firms [2013 Giants 300 Report]

Jacobs, URS, SAIC top Building Design+Construction's 2013 ranking of the engineering and engineering/architecture firms with the most revenue from BIM-driven projects.


By BD+C Staff | July 19, 2013
Courtesy SmithGroup
Courtesy SmithGroup
Rank Company 2012 BIM Revenue ($)
1 Jacobs Engineering Group $4,465,746,000
2 URS Corp. $292,864,749
3 Science Applications International Corp. $131,066,235
4 Arup $123,364,028
5 Merrick & Co. $106,000,000
6 SSOE Group $99,560,561
7 Thornton Tomasetti $93,431,545
8 Buro Happold Consulting Engineers $78,006,000
9 Middough $60,000,000
9 KPFF Consulting Engineers $60,000,000
11 KJWW Engineering Consultants $51,092,154
12 Clark Nexsen $37,364,300
13 Vanderweil Engineers $32,858,900
14 Bard, Rao + Athanas Consulting Engineers $32,000,000
15 Magnusson Klemencic Associates $31,843,000
16 Henderson Engineers $31,742,887
17 Glumac $30,116,000
18 Walter P Moore $29,092,693
19 Affiliated Engineers $28,907,000
20 M-E Engineers $28,500,000
21 H&A Architects & Engineers $27,734,657
22 Michael Baker Jr. $25,900,000
23 Degenkolb Engineers $23,647,736
24 TLC Engineering for Architecture $22,700,613
25 Heapy Engineering $21,674,602
26 STV $21,051,000
27 Haynes Whaley Associates $19,740,185
28 CCRD Partners $19,000,000
29 TTG $18,395,200
30 Syska Hennessy Group $18,015,883
31 Smith Seckman Reid $18,000,000
32 Paulus, Sokolowski and Sartor $15,200,000
33 Environmental Systems Design $14,338,994
34 GRAEF $12,600,000
35 Interface Engineering $10,772,782
36 BRPH $10,136,212
37 Rist-Frost-Shumway Engineering $8,000,000
37 Barge, Waggoner, Sumner and Cannon $8,000,000
39 M/E Engineering $7,500,000
40 Newcomb & Boyd $6,331,085
41 Dunham Associates $6,000,000
42 Bridgers & Paxton Consulting Engineers $5,735,421
43 Bergmann Associates $5,500,000
43 Simpson Gumpertz & Heger $5,500,000
45 Dewberry $5,412,709
46 CJL Engineering $5,197,143
47 Peter Basso Associates $5,000,000
48 Zak Companies $4,543,488
49 H.F. Lenz $4,050,000
50 Wallace Engineering $4,000,000
50 Hixson Architecture, Engineering, Interiors $4,000,000
52 KLH Engineers $3,518,208
53 Coffman Engineers $3,000,000
54 Ross & Baruzzini $2,407,000
55 Sparling $2,156,592
56 Wick Fisher White $2,113,000
57 AKF Group $2,000,000
58 RDK Engineers $1,985,000
59 GHT Limited $1,600,000
60 P2S Engineering $1,452,000
61 RMF Engineering Design $1,250,000
62 Brinjac Engineering $1,224,543
63 Aon Fire Protection Engineering $1,000,000
64 Mazzetti $714,544
65 ThermalTech Engineering $500,000
66 FBA Engineering $500,000
67 GRW $462,300
68 Bala Consulting Engineers $400,000
69 Primera Engineers $393,000
70 Walker Parking Consultants $380,361
71 Apogee Consulting Group $309,000
72 KCI Technologies $255,000
73 Kamm Consulting $113,494
74 Allen & Shariff $112,000
75 G&W Engineering $60,000

 

Back to BIM Giants article

 

Read the full 2013 Giants 300 Report

Related Stories

| Sep 24, 2014

5 business lessons from a 43-year Star veteran

Mary Ed Cain was supposed to be born a boy. That was the first time she surprised everyone. The second time came on a daily basis during her 43-year career at Star Building Systems. SPONSORED CONTENT

| Sep 24, 2014

Architecture billings see continued strength, led by institutional sector

On the heels of recording its strongest pace of growth since 2007, there continues to be an increasing level of demand for design services signaled in the latest Architecture Billings Index.

| Sep 24, 2014

Frank Gehry's first building in Latin America will host grand opening on Oct. 2

Gehry's design for the Biomuseo, or Museum of Biodiversity, draws inspiration from the site's natural and cultural surroundings, including local Panamaian tin roofs.

| Sep 23, 2014

Cedars-Sinai looks to streamline trauma care with first-of-its-kind OR360 simulation space

The breakthrough simulation center features moveable walls and a modular ceiling grid that allow doctors and military personnel to easily reconfigure the shape and size of the space.

| Sep 23, 2014

Third phase of New York’s High Line redevelopment opens

The $35 million Phase 3, known as High Line at the Rail Yards, broke ground September 20, 2012, and officially opened to the public on September 21.

| Sep 23, 2014

Cloud-shaped skyscraper complex wins Shenzhen Bay Super City design competition

Forget the cubist, clinical, glass and concrete jungle of today's financial districts. Shenzhen's new plan features a complex of cloud-shaped skyscrapers connected to one another with sloping bridges.

| Sep 23, 2014

Designing with Water: Report analyzes ways coastal cities can cope with flooding

The report contains 12 case studies of cities around the world that have applied advanced flood management techniques. 

| Sep 22, 2014

4 keys to effective post-occupancy evaluations

Perkins+Will's Janice Barnes covers the four steps that designers should take to create POEs that provide design direction and measure design effectiveness.

| Sep 22, 2014

NCARB overhauls Intern Development Program, cuts years off licensure process

The newly adopted changes will be implemented in two phases. The first will streamline the program by focusing on the IDP’s core requirements and removing its elective requirements. The second phase will condense the 17 current experience areas into six practice-based categories.

| Sep 22, 2014

Biloxi’s new Maritime and Seafood Industry Museum is like a ship in a bottle

Nine years after the Museum of Maritime and Seafood Industry in Biloxi, Miss., was damaged by Hurricane Katrina’s 30-foot tidal surge, the museum reopened its doors in a brand new, H3-designed building. 

boombox1
boombox2
native1

More In Category




Government Buildings

One of the country’s first all-electric fire stations will use no outside energy sources

Charlotte, N.C.’s new Fire Station #30 will be one of the country’s first all-electric fire stations, using no outside energy sources other than diesel fuel for one or two of the fire trucks. Multiple energy sources will power the station, including solar roof panels and geothermal wells. The two-story building features three truck bays, two fire poles, dispatch area, contamination room, and gear storage.

halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021