flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Top 90 Retail Architecture Firms

Top 90 Retail Architecture Firms

Gensler, GreenbergFarrow, and MG2 top Building Design+Construction’s annual ranking of the nation’s largest retail sector architecture and A/E firms, as reported in the 2016 Giants 300 Report.


By BD+C Staff | August 10, 2016

Audimas Concept Store. Photo: Valdas Ruzgys, Wikimedia Commons

TOP 90 RETAIL ARCHITECTURE FIRMS
Rank Firm 2015 Revenue
1 CallisonRTKL $205,964,000
2 Gensler $129,680,000
3 GreenbergFarrow $49,719,540
4 MG2 $45,652,293
5 Stantec $39,933,013
6 FRCH Design Worldwide $38,017,500
7 WD Partners $38,000,000
8 MBH Architects $28,126,062
9 NORR $20,326,054
10 P+R Architects $20,000,000
11 Little $19,762,300
12 RSP Architects $16,563,000
13 Bergmann Associates $15,730,440
14 Sargenti Architects $15,450,000
15 CTA Architects Engineers $14,967,299
16 CASCO $13,000,000
17 Herschman Architects $12,392,392
18 GFF $11,919,387
19 DLR Group $11,600,000
20 Ware Malcomb $11,315,063
21 TPG Architecture $11,098,000
22 LK Architecture $7,620,000
23 Cooper Carry $7,525,644
24 Beck Group, The $7,428,909
25 Nelson Worldwide Holdings $7,061,545
26 LS3P $6,912,851
27 Howell Belanger Castelli Architects $6,463,346
28 Nadel $6,376,015
29 Perkins+Will $6,080,000
30 Larson Design Group $5,999,155
31 api(+) $5,200,000
32 HOK $4,812,000
33 Lawrence Group $4,766,000
34 Jencen Architecture $3,900,000
35 Cuningham Group Architecture $3,888,522
36 Beyer Blinder Belle Architects & Planners $3,629,318
37 NewStudio Architecture $3,600,000
38 Zyscovich Architects $3,597,383
39 ai Design Group $3,574,874
40 MV+A Architects $3,330,738
41 Architects Hawaii Ltd. $3,325,000
42 Gresham, Smith and Partners $2,940,000
43 RS&H $2,700,000
44 Vocon $2,484,140
45 Oculus $2,418,832
46 Alliiance $2,363,000
47 LPA $2,267,451
48 Perkins Eastman $1,950,000
49 BRPH $1,851,069
50 Rossetti $1,828,975
51 Goodwyn, Mills and Cawood $1,791,052
52 Skidmore, Owings & Merrill $1,739,569
53 Architecture Design Collaborative $1,700,000
54 Studios Architecture $1,439,136
55 GSB $1,426,000
56 Goettsch Partners $1,400,000
57 GBBN Architects $1,280,000
58 Smallwood, Reynolds, Stewart, Stewart & Associates $1,123,009
59 Robert A.M. Stern Architects $1,050,000
60 tvsdesign $1,030,000
61 Moody Nolan $1,000,000
62 Ted Moudis Associates $1,000,000
63 Environetics $908,099
64 TK Architects International $892,597
65 Clark Nexsen $779,198
66 TEG Architects $767,617
67 BKSK Architects $744,852
68 HDR $629,600
69 Becker Morgan Group $622,250
70 VOA Associates $611,188
71 Cambridge Seven Associates $610,000
72 FXFOWLE $557,963
73 Montroy Andersen DeMarco $480,000
74 DLA+ Architecture & Interior Design $424,268
75 Eppstein Uhen Architects $359,296
76 Solomon Cordwell Buenz $337,426
77 Heery International $331,414
78 Emersion Design $329,066
79 KSQ Design $326,195
80 Morris Architects $318,000
81 GGLO $300,000
82 Hnedak Bobo Group $263,713
83 Corgan $253,242
84 DAG Architects $250,000
85 Leo A Daly $249,796
86 KGP Design Studio $227,500
87 Schenkel & Shultz $224,384
88 FitzGerald Associates Architects $219,000
89 Paulus, Sokolowski and Sartor $213,600
90 ZGF Architects $212,268
91 Margulies Perruzzi Architects $204,517
92 Mithun $190,000
93 FKP Architects $170,147
94 Large Architecture $169,125
95 Diamond Schmitt Architects $127,000
96 JRS Architect $110,000
97 Niles Bolton Associates $100,000 

 

RETURN TO THE GIANTS 300 LANDING PAGE

Related Stories

| Nov 1, 2010

Vancouver’s former Olympic Village shoots for Gold

The first tenants of the Millennium Water development in Vancouver, B.C., were Olympic athletes competing in the 2010 Winter Games. Now the former Olympic Village, located on a 17-acre brownfield site, is being transformed into a residential neighborhood targeting LEED ND Gold. The buildings are expected to consume 30-70% less energy than comparable structures.

| Oct 27, 2010

Grid-neutral education complex to serve students, community

MVE Institutional designed the Downtown Educational Complex in Oakland, Calif., to serve as an educational facility, community center, and grid-neutral green building. The 123,000-sf complex, now under construction on a 5.5-acre site in the city’s Lake Merritt neighborhood, will be built in two phases, the first expected to be completed in spring 2012 and the second in fall 2014.

| Oct 21, 2010

GSA confirms new LEED Gold requirement

The General Services Administration has increased its sustainability requirements and now mandates LEED Gold for its projects.

| Oct 18, 2010

World’s first zero-carbon city on track in Abu Dhabi

Masdar City, the world’s only zero-carbon city, is on track to be built in Abu Dhabi, with completion expected as early as 2020. Foster + Partners developed the $22 billion city’s master plan, with Adrian Smith + Gordon Gill Architecture, Aedas, and Lava Architects designing buildings for the project’s first phase, which is on track to be ready for occupancy by 2015.

| Oct 13, 2010

Editorial

The AEC industry shares a widespread obsession with the new. New is fresh. New is youthful. New is cool. But “old” or “slightly used” can be financially profitable and professionally rewarding, too.

| Oct 13, 2010

Test run on the HP Z200 SFF Good Value in a Small Package

Contributing Editor Jeff Yoders tests a new small-form factor, workstation-class desktop in Hewlett-Packard’s line that combines performance of its minitower machine with a smaller chassis and a lower price.

| Oct 13, 2010

Prefab Trailblazer

The $137 million, 12-story, 500,000-sf Miami Valley Hospital cardiac center, Dayton, Ohio, is the first major hospital project in the U.S. to have made extensive use of prefabricated components in its design and construction.

| Oct 13, 2010

Thought Leader

Sundra L. Ryce, President and CEO of SLR Contracting & Service Company, Buffalo, N.Y., talks about her firm’s success in new construction, renovation, CM, and design-build projects for the Navy, Air Force, and Buffalo Public Schools.

| Oct 13, 2010

Hospital tower gets modern makeover

The Wellmont Holston Valley Medical Center in Kingsport, Tenn., expanded its D unit, a project that includes a 243,443-sf addition with a 12-room operating suite, a 36-bed intensive care unit, and an enlarged emergency department.

boombox1
boombox2
native1

More In Category

Healthcare Facilities

Watch on-demand: Key Trends in the Healthcare Facilities Market for 2024-2025

Join the Building Design+Construction editorial team for this on-demand webinar on key trends, innovations, and opportunities in the $65 billion U.S. healthcare buildings market. A panel of healthcare design and construction experts present their latest projects, trends, innovations, opportunities, and data/research on key healthcare facilities sub-sectors. A 2024-2025 U.S. healthcare facilities market outlook is also presented.




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021