flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Top 80 Healthcare Engineering Firms

Top 80 Healthcare Engineering Firms

AECOM, Jacobs, and WSP | Parsons Brinckerhoff top Building Design+Construction’s annual ranking of the nation’s largest healthcare building sector engineering and E/A firms, as reported in the 2016 Giants 300 Report.


By BD+C Staff | August 8, 2016

UNC Women’s and Children’s Hospital, University of North Carolina at Chapel Hill. Photo: William Yeung, flickr Creative Commons.

TOP 80 HEALTHCARE ENGINEERING FIRMS
Rank Firm 2015 Revenue
1 AECOM $90,000,000
2 Jacobs $78,010,000
3 WSP | Parsons Brinckerhoff $55,480,000
4 BR+A Consulting Engineers $46,000,000
5 KJWW / TTG $39,820,000
6 Smith Seckman Reid $38,668,017
7 Affiliated Engineers $36,208,000
8 BSA LifeStructures $31,488,415
9 Mazzetti $25,966,258
10 TLC Engineering for Architecture $21,012,432
11 Dewberry $18,208,638
12 Syska Hennessy Group $15,471,354
13 I. C. Thomasson Associates $13,995,000
14 Sherlock, Smith & Adams $13,358,000
15 Arup $12,904,050
16 Thornton Tomasetti $11,837,829
17 Walter P Moore $11,439,122
18 STV $10,189,664
19 Shive-Hattery $9,959,412
20 Heapy Engineering $9,822,814
21 Jensen Hughes $9,796,428
22 Dunham Associates $8,500,000
23 ME Engineers $8,450,000
24 Environmental Systems Design $8,383,147
25 Vanderweil Engineers $8,377,000
26 RMF Engineering $6,704,000
27 SSOE Group $6,440,000
28 Glumac $6,339,303
29 Karpinski Engineering $5,865,667
30 Henderson Engineers $5,491,789
31 Zak Companies $5,259,660
32 Interface Engineering $5,092,848
33 Wiss, Janney, Elstner Associates $5,090,000
34 RDK Engineers $5,028,815
35 Simpson Gumpertz & Heger $4,927,000
36 M/E Engineering $4,688,355
37 CJL Engineering, Inc. $4,407,523
38 Ross & Baruzzini $4,132,292
39 Apogee Consulting Group $3,987,400
40 Coffman Engineers $3,734,604
41 Global Engineering Solutions $3,275,000
42 Spectrum Engineers $3,134,694
43 KLH Engineers $3,069,611
44 Cardno Haynes Whaley $3,016,576
45 Graef $2,967,659
46 Newcomb & Boyd $2,933,965
47 Highland Associates $2,900,000
48 Bridgers & Paxton Consulting Engineers $2,882,838
49 H.F. Lenz Company $2,832,583
50 P2S Engineering $2,596,735
51 William Tao & Associates $2,523,115
52 DeSimone Consulting Engineers $2,205,646
53 Magnusson Klemencic Associates $2,031,457
54 KCI Technologies $2,000,000
55 Peter Basso Associates $1,712,060
56 Fishbeck, Thompson, Carr & Huber $1,600,000
57 Burns & McDonnell $1,537,182
58 OLA Consulting Engineers $1,194,200
59 Ghafari Associates $1,150,000
60 Loring Consulting Engineers $1,000,000
61 Luckett & Farley $851,219
62 Wick Fisher White $804,000
63 Bala Consulting Engineers $705,000
64 Stanley Consultants $646,564
65 JQ Engineering $629,300
66 G & W Engineering Corp. $600,154
67 Pedco E & A Services $578,000
68 JBA Consulting Engineers $565,560
69 Baird, Hampton & Brown $564,032
70 Primera Engineers $557,865
71 ThermalTech Engineering $500,000
72 Wallace Engineering $500,000
73 Davis, Bowen & Friedel $474,250
74 CTLGroup $400,000
75 dbHMS $384,000
76 Rist-Frost-Shumway Engineering $300,000
77 Yates Companies, The $300,000
78 Architectural Engineers $297,491
79 Kamm Consulting $233,620
80 Wendel $218,557
81 Woolpert $218,243
82 GHT Limited $100,000

 

RETURN TO THE GIANTS 300 LANDING PAGE

Related Stories

| Apr 2, 2014

The new model of healthcare facility management

A growing number of healthcare organizations are moving to an integrated real estate model in an effort to better manage costs, respond to regulatory requirements, and support changes in patient care delivery.

| Apr 2, 2014

8 tips for avoiding thermal bridges in window applications

Aligning thermal breaks and applying air barriers are among the top design and installation tricks recommended by building enclosure experts.

| Mar 26, 2014

Callison launches sustainable design tool with 84 proven strategies

Hybrid ventilation, nighttime cooling, and fuel cell technology are among the dozens of sustainable design techniques profiled by Callison on its new website, Matrix.Callison.com. 

Sponsored | | Mar 25, 2014

Johns Hopkins chooses SLENDERWALL for a critical medical facility reconstruction

After decades of wear, the hand-laid brick envelope of the Johns Hopkins nine-story Nelson/Harvey inpatient facility began failing. SLENDERWALL met the requirements for renovation.

| Mar 20, 2014

Common EIFS failures, and how to prevent them

Poor workmanship, impact damage, building movement, and incompatible or unsound substrate are among the major culprits of EIFS problems. 

| Mar 19, 2014

How to develop a healthcare capital project using a 'true north charter'

Because healthcare projects take years to implement, developing a true north charter is essential for keeping the entire team on track and moving in the right direction. 

| Mar 18, 2014

6 keys to better healthcare design

Healthcare facility planning and design experts cite six factors that Building Teams need to keep in mind on their next healthcare project.

| Mar 18, 2014

How your AEC firm can win more healthcare projects

Cutthroat competition and the vagaries of the Affordable Healthcare Act are making capital planning a more daunting task than ever. Our experts provide inside advice on how AEC firms can secure more work from hospital systems.

| Mar 13, 2014

Do you really 'always turn right'?

The first visitor center we designed was the Ernest F. Coe Visitor Center for the Everglades National Park in 1993. I remember it well for a variety of reasons, not the least of which was the ongoing dialogue we had with our retail consultant. He insisted that the gift shop be located on the right as one exited the visitor center because people “always turn right.” 

| Mar 12, 2014

14 new ideas for doors and door hardware

From a high-tech classroom lockdown system to an impact-resistant wide-stile door line, BD+C editors present a collection of door and door hardware innovations. 

boombox1
boombox2
native1

More In Category

Healthcare Facilities

Watch on-demand: Key Trends in the Healthcare Facilities Market for 2024-2025

Join the Building Design+Construction editorial team for this on-demand webinar on key trends, innovations, and opportunities in the $65 billion U.S. healthcare buildings market. A panel of healthcare design and construction experts present their latest projects, trends, innovations, opportunities, and data/research on key healthcare facilities sub-sectors. A 2024-2025 U.S. healthcare facilities market outlook is also presented.




Mass Timber

British Columbia hospital features mass timber community hall

The Cowichan District Hospital Replacement Project in Duncan, British Columbia, features an expansive community hall featuring mass timber construction. The hall, designed to promote social interaction and connection to give patients, families, and staff a warm and welcoming environment, connects a Diagnostic and Treatment (“D&T”) Block and Inpatient Tower.

halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021