flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Top 80 Architecture/Engineering firms

Top 80 Architecture/Engineering firms

Stantec, HOK, and Callison RTKL once again top Building Design+Construction's 2016 ranking of the largest architecture/engineering firms in the United States. 


By BD+C Editors | July 26, 2016

CallisonRTKL served as architect for this Warren Clinic in Tulsa, Okla. Image: CallisonRTKL.

TOP 80 ARCHITECTURE/ENGINEERING FIRMS
Rank Firm 2015 Revenue
1 Stantec $579,413,704
2 HOK $450,824,000
3 CallisonRTKL $405,559,000
4 Skidmore, Owings & Merrill $352,332,272
5 HDR $314,800,000
6 SmithGroupJJR $222,085,339
7 CannonDesign $218,000,000
8 DLR Group $158,000,000
9 EYP $149,595,604
10 HGA $142,750,000
11 Page $139,000,000
12 NORR $137,488,821
13 Gresham, Smith and Partners $101,024,000
14 Leo A Daly $96,548,666
15 Nelson Worldwide Holdings $79,872,131
16 Flad Architects $74,100,000
17 EwingCole $65,754,000
18 LPA $64,063,658
19 Clark Nexsen $63,701,392
20 BRPH $63,095,404
21 Harley Ellis Devereaux $63,000,000
22 Ware Malcomb $62,861,465
23 PBK $62,400,000
24 Huckabee $60,544,770
25 CTA Architects Engineers $56,540,243
26 RSP Architects $54,613,000
27 RS&H $54,000,000
28 GreenbergFarrow $53,134,312
29 Little $49,406,000
30 Ballinger $47,381,276
31 Moseley Architects $43,618,103
32 S/L/A/M Collaborative, The $40,950,000
33 Morris Architects $40,700,000
34 Westlake Reed Leskosky $40,210,398
35 Heery International $36,368,516
36 WD Partners $36,123,000
37 Wold Architects and Engineers $35,800,000
38 Parkhill, Smith & Cooper $35,733,070
39 Lawrence Group $33,275,000
40 HNTB Corporation $31,894,668
41 Goodwyn, Mills and Cawood $30,704,308
42 Bergmann Associates $28,865,335
43 Environetics $27,973,007
44 Paulus, Sokolowski and Sartor $27,380,000
45 FXFOWLE $26,881,440
46 SMMA | Symmes Maini & McKee Associates $26,523,596
47 FreemanWhite $25,681,732
48 Integrus Architecture $24,284,055
49 Guernsey $23,062,942
50 Alliiance $22,507,000
51 KSQ Design $21,148,806
52 Epstein $19,600,000
53 Fanning/Howey Associates $19,167,566
54 Schenkel & Shultz $18,774,000
55 LK Architecture $17,640,000
56 Baskervill $15,538,552
57 Albert Kahn Associates $15,500,000
58 Sargenti Architects $15,450,000
59 Nadel $15,016,519
60 Becker Morgan Group $14,500,530
61 CASCO $14,450,000
62 Herschman Architects $14,077,722
63 Rosser International $13,067,871
64 Anderson Mikos Architects $12,866,000
65 Wright Heerema Architects $11,500,000
66 Barge Waggoner Sumner & Cannon $11,425,000
67 DLA Architects $9,603,058
68 Hoffmann Architects $8,988,750
69 DLA+ Architecture & Interior Design $8,842,000
70 GSB $7,801,562
71 Jonathan Nehmer + Associates $7,592,298
72 Larson Design Group $7,534,381
73 BBS Architects and Engineers $7,010,000
74 ACAI Associates $6,780,000
75 John Ciardullo Associates $6,682,132
76 ai Design Group $6,407,028
77 Emersion Design $6,355,288
78 TK Architects International $5,314,888
79 DAG Architects $4,500,000
80 Jencen Architecture $4,000,000
81 NewStudio Architecture $3,950,000
82 Convergence Design $1,234,000
83 GRW $1,233,162

 

 

RETURN TO THE GIANTS 300 LANDING PAGE

Related Stories

| Feb 15, 2011

AIA on President Obama's proposed $1 billion investment in energy conservation

The President’s budget increases the value of investment in energy conservation in commercial buildings by roughly $1 billion, reports AIA 2011 President Clark Manus, FAIA. The significant increase from the current tax deduction of $1.80 per sq. ft. now on the books is an increase for which the AIA has been advocating in order to encourage energy conservation.

| Feb 14, 2011

Sustainable Roofing: A Whole-Building Approach

According to sustainability experts, the first step toward designing an energy-efficient roofing system is to see roof materials and systems as an integral component of the enclosure and the building as a whole. Earn 1.0 AIA/CES learning units by studying this article and successfully completing the online exam.

| Feb 11, 2011

Four Products That Stand Up to Hurricanes

What do a panelized wall system, a newly developed roof hatch, spray polyurethane foam, and a custom-made curtain wall have in common? They’ve been extensively researched and tested for their ability to take abuse from the likes of Hurricane Katrina.

| Feb 11, 2011

RS Means Cost Comparison Chart: Office Buildings

This month's RS Means Cost Comparison Chart focuses on office building construction.

| Feb 11, 2011

Sustainable features on the bill for dual-building performing arts center at Soka University of America

The $73 million Soka University of America’s new performing arts center and academic complex recently opened on the school’s Aliso Viejo, Calif., campus. McCarthy Building Companies and Zimmer Gunsul Frasca Architects collaborated on the two-building project. One is a three-story, 47,836-sf facility with a grand reception lobby, a 1,200-seat auditorium, and supports spaces. The other is a four-story, 48,974-sf facility with 11 classrooms, 29 faculty offices, a 150-seat black box theater, rehearsal/dance studio, and support spaces. The project, which has a green roof, solar panels, operable windows, and sun-shading devices, is going for LEED Silver.

| Feb 11, 2011

BIM-enabled Texas church complex can broadcast services in high-def

After two years of design and construction, members of the Gateway Church in Southland, Texas, were able to attend services in their new 4,000-seat facility in late 2010. Located on a 180-acre site, the 205,000-sf complex has six auditoriums, including a massive 200,000-sf Worship Center, complete with catwalks, top-end audio and video system, and high-definition broadcast capabilities. BIM played a significant role in the building’s design and construction. Balfour Beatty Construction and Beck Architecture formed the nucleus of the Building Team.

| Feb 11, 2011

Kentucky’s first green adaptive reuse project earns Platinum

(FER) studio, Inglewood, Calif., converted a 115-year-old former dry goods store in Louisville, Ky., into a 10,175-sf mixed-use commercial building earned LEED Platinum and holds the distinction of being the state’s first adaptive reuse project to earn any LEED rating. The facility, located in the East Market District, houses a gallery, event space, offices, conference space, and a restaurant. Sustainable elements that helped the building reach its top LEED rating include xeriscaping, a green roof, rainwater collection and reuse, 12 geothermal wells, 81 solar panels, a 1,100-gallon ice storage system (off-grid energy efficiency is 68%) and the reuse and recycling of construction materials. Local firm Peters Construction served as GC.

| Feb 11, 2011

Former Richardson Romanesque hotel now houses books, not beds

The Piqua (Ohio) Public Library was once a late 19th-century hotel that sat vacant and deteriorating for years before a $12.3 million adaptive reuse project revitalized the 1891 building. The design team of PSA-Dewberry, MKC Associates, and historic preservation specialist Jeff Wray Associates collaborated on the restoration of the 80,000-sf Richardson Romanesque building, once known as the Fort Piqua Hotel. The team restored a mezzanine above the lobby and repaired historic windows, skylight, massive fireplace, and other historic details. The basement, with its low ceiling and stacked stone walls, was turned into a castle-like children’s center. The Piqua Historical Museum is also located within the building.

boombox1
boombox2
native1

More In Category

Healthcare Facilities

Watch on-demand: Key Trends in the Healthcare Facilities Market for 2024-2025

Join the Building Design+Construction editorial team for this on-demand webinar on key trends, innovations, and opportunities in the $65 billion U.S. healthcare buildings market. A panel of healthcare design and construction experts present their latest projects, trends, innovations, opportunities, and data/research on key healthcare facilities sub-sectors. A 2024-2025 U.S. healthcare facilities market outlook is also presented.




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021