flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Top 70 University Engineering Firms

Top 70 University Engineering Firms

AECOM, WSP | Parsons Brinckerhoff, and Jacobs top Building Design+Construction’s annual ranking of the nation’s largest university sector engineering and E/A firms, as reported in the 2016 Giants 300 Report.


By BD+C Staff | August 9, 2016

UW Health at The American Center, Madison, Wis. Photo: Steve Hall © Hedrich Blessing 2015, courtesy Flad Architects.

TOP 70 UNIVERSITY ENGINEERING FIRMS
Rank Firm 2015 Revenue
1 AECOM $65,000,000
2 WSP | Parsons Brinckerhoff $37,988,000
3 Jacobs $31,600,000
4 Affiliated Engineers $19,264,000
5 KJWW / TTG $16,943,913
6 Arup $15,856,593
7 Vanderweil Engineers $15,351,800
8 Simpson Gumpertz & Heger $13,586,000
9 Thornton Tomasetti $13,363,234
10 Dewberry $12,904,401
11 BR+A Consulting Engineers $11,400,000
12 RMF Engineering $11,354,900
13 Burns & McDonnell $11,116,604
14 BSA LifeStructures $10,770,801
15 P2S Engineering $10,557,369
16 Shive-Hattery $8,288,709
17 Jensen Hughes $7,740,346
18 Wiss, Janney, Elstner Associates $7,740,000
19 Fishbeck, Thompson, Carr & Huber $7,500,000
20 ME Engineers $6,460,000
21 Loring Consulting Engineers $6,036,000
22 H.F. Lenz Company $4,944,856
23 Interface Engineering $4,794,573
24 M/E Engineering $4,688,355
25 Ross & Baruzzini $4,307,200
26 Heapy Engineering $4,160,676
27 STV $4,002,342
28 RDK Engineers $3,875,821
29 Glumac $3,696,480
30 TLC Engineering for Architecture $3,491,531
31 Woolpert $3,243,901
32 JQ Engineering $3,141,800
33 Rist-Frost-Shumway Engineering $3,000,000
34 Spectrum Engineers $2,971,807
35 Karpinski Engineering $2,932,833
36 Smith Seckman Reid $2,842,841
37 Peter Basso Associates $2,780,856
38 Global Engineering Solutions $2,620,000
39 Stanley Consultants $2,463,846
40 Newcomb & Boyd $2,448,645
41 Bridgers & Paxton Consulting Engineers $2,427,726
42 Henderson Engineers $2,347,476
43 Primera Engineers $2,171,401
44 Environmental Systems Design $2,095,786
45 KCI Technologies $2,000,000
46 I. C. Thomasson Associates $1,928,200
47 dbHMS $1,920,000
48 Bala Consulting Engineers $1,880,000
49 Dunham Associates $1,750,000
50 Highland Associates $1,700,000
51 CJL Engineering, Inc. $1,510,260
52 Cardno Haynes Whaley $1,483,543
53 Syska Hennessy Group $1,445,519
54 Graef $1,357,546
55 DeSimone Consulting Engineers $1,305,742
56 Wallace Engineering $1,300,000
57 KZF Design $1,074,055
58 Luckett & Farley $1,069,453
59 William Tao & Associates $946,168
60 KLH Engineers $860,386
61 Baird, Hampton & Brown $841,665
62 Mazzetti $817,330
63 CTLGroup $800,000
64 Ghafari Associates $750,000
65 Wendel $745,424
66 OLA Consulting Engineers $672,728
67 JBA Consulting Engineers $668,293
68 Magnusson Klemencic Associates $626,415
69 SSOE Group $520,000
70 ThermalTech Engineering $500,000

 

RETURN TO THE GIANTS 300 LANDING PAGE

Related Stories

| Oct 21, 2010

GSA confirms new LEED Gold requirement

The General Services Administration has increased its sustainability requirements and now mandates LEED Gold for its projects.

| Oct 18, 2010

World’s first zero-carbon city on track in Abu Dhabi

Masdar City, the world’s only zero-carbon city, is on track to be built in Abu Dhabi, with completion expected as early as 2020. Foster + Partners developed the $22 billion city’s master plan, with Adrian Smith + Gordon Gill Architecture, Aedas, and Lava Architects designing buildings for the project’s first phase, which is on track to be ready for occupancy by 2015.

| Oct 13, 2010

Editorial

The AEC industry shares a widespread obsession with the new. New is fresh. New is youthful. New is cool. But “old” or “slightly used” can be financially profitable and professionally rewarding, too.

| Oct 13, 2010

Test run on the HP Z200 SFF Good Value in a Small Package

Contributing Editor Jeff Yoders tests a new small-form factor, workstation-class desktop in Hewlett-Packard’s line that combines performance of its minitower machine with a smaller chassis and a lower price.

| Oct 13, 2010

Prefab Trailblazer

The $137 million, 12-story, 500,000-sf Miami Valley Hospital cardiac center, Dayton, Ohio, is the first major hospital project in the U.S. to have made extensive use of prefabricated components in its design and construction.

| Oct 13, 2010

Thought Leader

Sundra L. Ryce, President and CEO of SLR Contracting & Service Company, Buffalo, N.Y., talks about her firm’s success in new construction, renovation, CM, and design-build projects for the Navy, Air Force, and Buffalo Public Schools.

| Oct 13, 2010

Hospital tower gets modern makeover

The Wellmont Holston Valley Medical Center in Kingsport, Tenn., expanded its D unit, a project that includes a 243,443-sf addition with a 12-room operating suite, a 36-bed intensive care unit, and an enlarged emergency department.

| Oct 13, 2010

Modern office design accentuates skyline views

Intercontinental|Exchange, a Chicago-based financial firm, hired design/engineering firm Epstein to create a modern, new 31st-floor headquarters.

| Oct 13, 2010

Hospital and clinic join for better patient care

Designed by HGA Architects and Engineers, the two-story Owatonna (Minn.) Hospital, owned by Allina Hospitals and Clinics, connects to a newly expanded clinic owned by Mayo Health System to create a single facility for inpatient and outpatient care.

| Oct 13, 2010

Biloxi’s convention center bigger, better after Katrina

The Mississippi Coast Coliseum and Convention Center in Biloxi is once again open for business following a renovation and expansion necessitated by Hurricane Katrina.

boombox1
boombox2
native1

More In Category




Great Solutions

41 Great Solutions for architects, engineers, and contractors

AI ChatBots, ambient computing, floating MRIs, low-carbon cement, sunshine on demand, next-generation top-down construction. These and 35 other innovations make up our 2024 Great Solutions Report, which highlights fresh ideas and innovations from leading architecture, engineering, and construction firms.

halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021