flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Top 70 University Engineering Firms

Top 70 University Engineering Firms

AECOM, WSP | Parsons Brinckerhoff, and Jacobs top Building Design+Construction’s annual ranking of the nation’s largest university sector engineering and E/A firms, as reported in the 2016 Giants 300 Report.


By BD+C Staff | August 9, 2016

UW Health at The American Center, Madison, Wis. Photo: Steve Hall © Hedrich Blessing 2015, courtesy Flad Architects.

TOP 70 UNIVERSITY ENGINEERING FIRMS
Rank Firm 2015 Revenue
1 AECOM $65,000,000
2 WSP | Parsons Brinckerhoff $37,988,000
3 Jacobs $31,600,000
4 Affiliated Engineers $19,264,000
5 KJWW / TTG $16,943,913
6 Arup $15,856,593
7 Vanderweil Engineers $15,351,800
8 Simpson Gumpertz & Heger $13,586,000
9 Thornton Tomasetti $13,363,234
10 Dewberry $12,904,401
11 BR+A Consulting Engineers $11,400,000
12 RMF Engineering $11,354,900
13 Burns & McDonnell $11,116,604
14 BSA LifeStructures $10,770,801
15 P2S Engineering $10,557,369
16 Shive-Hattery $8,288,709
17 Jensen Hughes $7,740,346
18 Wiss, Janney, Elstner Associates $7,740,000
19 Fishbeck, Thompson, Carr & Huber $7,500,000
20 ME Engineers $6,460,000
21 Loring Consulting Engineers $6,036,000
22 H.F. Lenz Company $4,944,856
23 Interface Engineering $4,794,573
24 M/E Engineering $4,688,355
25 Ross & Baruzzini $4,307,200
26 Heapy Engineering $4,160,676
27 STV $4,002,342
28 RDK Engineers $3,875,821
29 Glumac $3,696,480
30 TLC Engineering for Architecture $3,491,531
31 Woolpert $3,243,901
32 JQ Engineering $3,141,800
33 Rist-Frost-Shumway Engineering $3,000,000
34 Spectrum Engineers $2,971,807
35 Karpinski Engineering $2,932,833
36 Smith Seckman Reid $2,842,841
37 Peter Basso Associates $2,780,856
38 Global Engineering Solutions $2,620,000
39 Stanley Consultants $2,463,846
40 Newcomb & Boyd $2,448,645
41 Bridgers & Paxton Consulting Engineers $2,427,726
42 Henderson Engineers $2,347,476
43 Primera Engineers $2,171,401
44 Environmental Systems Design $2,095,786
45 KCI Technologies $2,000,000
46 I. C. Thomasson Associates $1,928,200
47 dbHMS $1,920,000
48 Bala Consulting Engineers $1,880,000
49 Dunham Associates $1,750,000
50 Highland Associates $1,700,000
51 CJL Engineering, Inc. $1,510,260
52 Cardno Haynes Whaley $1,483,543
53 Syska Hennessy Group $1,445,519
54 Graef $1,357,546
55 DeSimone Consulting Engineers $1,305,742
56 Wallace Engineering $1,300,000
57 KZF Design $1,074,055
58 Luckett & Farley $1,069,453
59 William Tao & Associates $946,168
60 KLH Engineers $860,386
61 Baird, Hampton & Brown $841,665
62 Mazzetti $817,330
63 CTLGroup $800,000
64 Ghafari Associates $750,000
65 Wendel $745,424
66 OLA Consulting Engineers $672,728
67 JBA Consulting Engineers $668,293
68 Magnusson Klemencic Associates $626,415
69 SSOE Group $520,000
70 ThermalTech Engineering $500,000

 

RETURN TO THE GIANTS 300 LANDING PAGE

Related Stories

Data Centers | Nov 13, 2023

Data center sector trends for 2023-2024

Demand for more data centers is soaring, but delivery can be stymied by supply delays, manpower shortages, and NIMBYism.

Office Buildings | Nov 10, 2023

3 important early considerations for office-to-residential conversions

Scott Campagna, PE, Senior Director of Housing, IMEG Corp, shares insights from experts on office-to-residential conversion issues that may be mitigated when dealt with early.

Education Facilities | Nov 9, 2023

Oakland schools’ central kitchen cooks up lessons along with 30,000 meals daily

CAW Architects recently completed a facility for the Oakland, Calif., school district that feeds students and teaches them how to grow, harvest, and cook produce grown onsite. The production kitchen at the Unified School District Central Kitchen, Instructional Farm, and Education Center, (“The Center”) prepares and distributes about 30,000 meals a day for district schools lacking their own kitchens.

Laboratories | Nov 8, 2023

Boston’s FORUM building to support cutting-edge life sciences research and development

Global real estate companies Lendlease and Ivanhoé Cambridge recently announced the topping-out of FORUM, a nine-story, 350,000-sf life science building in Boston. Located in Boston Landing, a 15-acre mixed-use community, the $545 million project will achieve operational net zero carbon upon completion in 2024.

Retail Centers | Nov 7, 2023

Omnichannel experiences, mixed-use development among top retail design trends for 2023-2024

Retailer survival continues to hinge on retail design trends like blending online and in-person shopping and mixing retail with other building types, such as offices and residential. 

Giants 400 | Nov 6, 2023

Top 60 Cultural Facility Engineering Firms for 2023

KPFF, Arup, Thornton Tomasetti, Tetra Tech, and WSP head BD+C's ranking of the nation's largest cultural facilities sector engineering and engineering architecture (EA) firms for 2023, as reported in the 2023 Giants 400 Report. Note: This ranking includes revenue from all cultural building sectors, including concert venues, art galleries, museums, performing arts centers, and public libraries.  

Giants 400 | Nov 6, 2023

Top 90 Government Building Engineering Firms for 2023

Fluor, Jacobs, AECOM, WSP, and Burns & McDonnell head BD+C's rankings of the nation's largest government building sector engineering and engineering architecture (EA) firms for 2023, as reported in the 2023 Giants 400 Report. Note: This ranking includes revenue from all government building sectors, including federal, state, local, military, and Veterans Affairs (VA) buildings.

Healthcare Facilities | Nov 3, 2023

The University of Chicago Medicine is building its city’s first freestanding cancer center with inpatient and outpatient services

The University of Chicago Medicine (UChicago Medicine) is building Chicago’s first freestanding cancer center with inpatient and outpatient services. Aiming to bridge longstanding health disparities on Chicago’s South Side, the $815 million project will consolidate care and about 200 team members currently spread across at least five buildings. The new facility, which broke ground in September, is expected to open to patients in spring 2027.

Office Buildings | Nov 2, 2023

Amazon’s second headquarters completes its first buildings: a pair of 22-story towers

Amazon has completed construction of the first two buildings of its second headquarters, located in Arlington, Va. The all-electric structures, featuring low carbon concrete and mass timber, help further the company’s commitment to achieving net zero carbon emissions by 2040 and 100% renewable energy consumption by 2030. Designed by ZGF Architects, the two 22-story buildings are on track to become the largest LEED v4 Platinum buildings in the U.S.

Sustainability | Nov 1, 2023

Researchers create building air leakage detection system using a camera in real time

Researchers at the U.S. Department of Energy’s Oak Ridge National Laboratory have developed a system that uses a camera to detect air leakage from buildings in real time.

boombox1
boombox2
native1

More In Category




Great Solutions

41 Great Solutions for architects, engineers, and contractors

AI ChatBots, ambient computing, floating MRIs, low-carbon cement, sunshine on demand, next-generation top-down construction. These and 35 other innovations make up our 2024 Great Solutions Report, which highlights fresh ideas and innovations from leading architecture, engineering, and construction firms.

halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021