flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Top 70 Reconstruction Engineering Firms

Top 70 Reconstruction Engineering Firms

Jacobs, Robins & Morton, and The Boldt Company top Building Design+Construction’s annual ranking of the nation’s largest reconstruction sector engineering and E/A firms, as reported in the 2016 Giants 300 Report.


By BD+C Staff | August 19, 2016

Uline Arena, Washington, D.C. Antunovich Associates (architect), DAVIS Construction (GC), SSA (MEP), Douglas Development Corporation (owner). Photo: © Rick McCleary 2016 courtesy of DAVIS Construction.

TOP 70 RECONSTRUCTION ENGINEERING FIRMS
Rank Firm 2015 Revenue
1 Jacobs $416,783,478
2 Robins & Morton $339,995,669
3 Boldt Company, The $195,086,494
4 Burns & McDonnell $176,706,584
5 IPS $141,876,000
6 WSP | Parsons Brinckerhoff $136,804,000
7 Jensen Hughes $104,807,939
8 Benham Design $102,458,168
9 Wiss, Janney, Elstner Associates $71,632,800
10 Dewberry $60,223,172
11 Thornton Tomasetti $55,522,731
12 STV $52,348,512
13 Yates Companies, The $50,000,000
14 Simpson Gumpertz & Heger $49,091,000
15 SSOE Group $42,110,000
16 Syska Hennessy Group $41,761,687
17 Henderson Engineers $38,914,999
18 Wendel $38,909,581
19 Core States Group $36,805,648
20 Environmental Systems Design $36,676,269
21 Ghafari Associates $28,250,000
22 Vanderweil Engineers $27,507,000
23 TLC Engineering for Architecture $23,927,845
24 RMF Engineering $23,045,000
25 Highland Associates $22,080,000
26 Ross & Baruzzini $19,954,045
27 Glumac $18,805,868
28 BR+A Consulting Engineers $18,300,000
29 KCI Technologies $17,400,000
30 Dunham Associates $17,050,000
31 Affiliated Engineers $16,265,000
32 ME Engineers $16,000,000
33 H.F. Lenz Company $14,838,392
34 Walker Parking Consultants $14,623,271
35 P2S Engineering $13,206,990
36 Loring Consulting Engineers $13,000,000
37 KLH Engineers $12,738,026
38 Walter P Moore $12,411,139
39 Newcomb & Boyd $12,231,482
40 Interface Engineering $11,984,714
41 Bridgers & Paxton Consulting Engineers $10,711,708
42 Heapy Engineering $10,632,062
43 I. C. Thomasson Associates $10,070,000
44 Zak Companies $9,904,091
45 Luckett & Farley $9,705,209
46 M/E Engineering $9,376,936
47 Global Engineering Solutions $9,170,000
48 Hixson Architecture, Engineering, Interiors $8,000,000
49 Bala Consulting Engineers $7,850,000
50 Pedco E & A Services $7,565,000
51 Sherlock, Smith & Adams $7,421,000
52 Wick Fisher White $6,111,000
53 CTLGroup $5,900,000
54 KZF Design $5,581,262
55 Primera Engineers $5,379,289
56 Coffman Engineers $5,315,507
57 Peter Basso Associates $5,100,278
58 Davis, Bowen & Friedel $5,045,704
59 Spectrum Engineers $4,679,069
60 Wallace Engineering $4,500,000
61 DeSimone Consulting Engineers $4,340,711
62 OLA Consulting Engineers $4,125,000
63 JQ Engineering $3,649,200
64 Graef $3,560,963
65 Magnusson Klemencic Associates $3,370,843
66 Baird, Hampton & Brown $3,350,800
67 William Tao & Associates $3,318,063
68 dbHMS $3,072,000
69 G & W Engineering Corp. $2,750,707
70 Apogee Consulting Group $2,558,400
71 Rist-Frost-Shumway Engineering $2,535,000
72 Architectural Engineers $2,224,455
73 Kamm Consulting $2,090,195
74 KCL Engineering $1,671,124
75 Cardno Haynes Whaley $692,794

 

RETURN TO THE GIANTS 300 LANDING PAGE

Related Stories

| Nov 27, 2013

Retail renaissance: What's next?

The retail construction category, long in the doldrums, is roaring back to life. Send us your comments and projects as we prepare coverage for this exciting sector.

| Nov 27, 2013

Pediatric hospitals improve care with flexible, age-sensitive design

Pediatric hospitals face many of the same concerns as their adult counterparts. Inpatient bed demand is declining, outpatient visits are soaring, and there is a higher level of focus on prevention and reduced readmissions.

| Nov 27, 2013

Exclusive survey: Revenues increased at nearly half of AEC firms in 2013

Forty-six percent of the respondents to an exclusive BD+C survey of AEC professionals reported that revenues had increased this year compared to 2012, with another 24.2% saying cash flow had stayed the same.

| Nov 27, 2013

Wonder walls: 13 choices for the building envelope

BD+C editors present a roundup of the latest technologies and applications in exterior wall systems, from a tapered metal wall installation in Oklahoma to a textured precast concrete solution in North Carolina. 

| Nov 27, 2013

LEED for Healthcare offers new paths to green

LEED for Healthcare debuted in spring 2011, and certifications are now beginning to roll in. They include the new Puyallup (Wash.) Medical Center and the W.H. and Elaine McCarty South Tower at Dell Children’s Medical Center of Central Texas in Austin.

| Nov 27, 2013

University reconstruction projects: The 5 keys to success

This AIA CES Discovery course discusses the environmental, economic, and market pressures affecting facility planning for universities and colleges, and outlines current approaches to renovations for critical academic spaces.

| Nov 26, 2013

7 ways to make your firm more successful

Like all professional services businesses, AEC firms are challenged to effectively manage people. And even though people can be rather unpredictable, a firm’s success doesn’t have to be. Here are seven ways to make your firm more successful in the face of market variability and uncertainty.

| Nov 26, 2013

Video: Zaha Hadid's stadium for Qatar 2022 World Cup

Zaha Hadid Architects, in conjunction with AECOM, has released renderings for a major stadium being designed for the Qatar 2022 FIFA World Cup--an event that will involve up to nine stadiums.

| Nov 26, 2013

First Look: World's tallest Ferris wheel and surrounding N.Y. development

The New York office of Perkins Eastman has announced that the New York Wheel, located on the north shore of Staten Island’s St. George neighborhood, was approved by City Council on October 30 and construction is scheduled to begin in 2014. The approval process has been over a year in the making since the project was first announced by the office of Mayor Bloomberg last September.

| Nov 26, 2013

Construction costs rise for 22nd straight month in November

Construction costs in North America rose for the 22nd consecutive month in November as labor costs continued to increase, amid growing industry concern over the tight availability of skilled workers.

boombox1
boombox2
native1

More In Category

Adaptive Reuse

Empty mall to be converted to UCLA Research Park

UCLA recently acquired a former mall that it will convert into the UCLA Research Park that will house the California Institute for Immunology and Immunotherapy at UCLA and the UCLA Center for Quantum Science and Engineering, as well as programs across other disciplines. The 700,000-sf property, formerly the Westside Pavilion shopping mall, is two miles from the university’s main Westwood campus. Google, which previously leased part of the property, helped enable and support UCLA’s acquisition.


Geothermal Technology

Rochester, Minn., plans extensive geothermal network

The city of Rochester, Minn., home of the famed Mayo Clinic, is going big on geothermal networks. The city is constructing Thermal Energy Networks (TENs) that consist of ambient pipe loops connecting multiple buildings and delivering thermal heating and cooling energy via water-source heat pumps.



halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021