flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Top 70 Office Engineering Firms

Top 70 Office Engineering Firms

Jacobs, AECOM, and Thornton Tomasetti top Building Design+Construction’s annual ranking of the nation’s largest office sector engineering and E/A firms, as reported in the 2016 Giants 300 Report.


By BD+C Staff | August 12, 2016

A pair of designers in DCI Artform’s satellite office in Chicago utilize the firm’s “digital cave” to create a virtual product display for a client. CannonDesign provided architectural, MEP, and A/V services for this project. JC Anderson was the GC. Mechdyne Corp. provided the cave’s video screens.Photo: Christopher Barrett Photography courtesy of CannonDesign.

TOP 70 OFFICE ENGINEERING FIRMS
Rank Firm 2015 Revenue
1 Jacobs $438,700,000
2 AECOM $285,000,000
3 Thornton Tomasetti $108,284,346
4 WSP | Parsons Brinckerhoff $93,672,000
5 Burns & McDonnell $59,216,746
6 Arup $55,609,224
7 Syska Hennessy Group $35,568,928
8 Dewberry $29,285,538
9 Hankins and Anderson $25,877,629
10 Benham Design $18,638,864
11 Environmental Systems Design $18,338,134
12 Glumac $16,815,183
13 KJWW / TTG $15,501,754
14 Wiss, Janney, Elstner Associates $15,350,000
15 Magnusson Klemencic Associates $12,831,847
16 RDK Engineers $12,490,393
17 Vanderweil Engineers $11,744,500
18 Simpson Gumpertz & Heger $11,031,000
19 Jensen Hughes $10,470,936
20 GHT Limited $10,470,000
21 ME Engineers $7,790,000
22 Henderson Engineers $7,090,542
23 Bridgers & Paxton Consulting Engineers $6,544,088
24 H.F. Lenz Company $6,466,407
25 CJL Engineering, Inc. $6,266,850
26 Bala Consulting Engineers $5,875,000
27 Highland Associates $5,600,000
28 Shive-Hattery $5,393,049
29 Walter P Moore $5,365,243
30 Cardno Haynes Whaley $5,210,293
31 Hixson Architecture, Engineering, Interiors $5,200,000
32 Newcomb & Boyd $4,875,555
33 KCI Technologies $4,700,000
34 Pedco E & A Services $4,250,000
35 Ghafari Associates $4,000,000
36 KZF Design $3,837,266
37 Interface Engineering $3,625,951
38 Heapy Engineering $3,312,190
39 Loring Consulting Engineers $3,300,000
40 Wendel $3,288,770
41 Dunham Associates $3,250,000
42 TLC Engineering for Architecture $3,193,435
43 Luckett & Farley $3,082,431
44 DeSimone Consulting Engineers $3,052,614
45 Spectrum Engineers $2,951,130
46 OLA Consulting Engineers $2,730,338
47 Smith Seckman Reid $2,629,255
48 ThermalTech Engineering $2,500,000
49 Walker Parking Consultants $2,495,000
50 Primera Engineers $2,390,551
51 Affiliated Engineers $2,360,000
52 Coffman Engineers $2,315,629
53 KLH Engineers $2,313,645
54 I. C. Thomasson Associates $2,177,000
55 Baird, Hampton & Brown $2,141,785
56 Wick Fisher White $2,120,000
57 Kamm Consulting $2,090,195
58 Karpinski Engineering $2,000,000
59 Core States Group $1,964,317
60 CTLGroup $1,900,000
61 Mazzetti $1,624,541
62 JQ Engineering $1,575,300
63 SSOE Group $1,450,000
64 Graef $1,355,627
65 Davis, Bowen & Friedel $1,296,783
66 Peter Basso Associates $1,231,603
67 M/E Engineering $1,172,089
68 William Tao & Associates $1,072,324
69 Rist-Frost-Shumway Engineering $1,000,000
70 RMF Engineering $921,800
71 JBA Consulting Engineers $865,525
72 Stanley Consultants $768,109
73 dbHMS $768,000
74 G & W Engineering Corp. $650,167
75 Wallace Engineering $600,000
76 BR+A Consulting Engineers $600,000

 

RETURN TO THE GIANTS 300 LANDING PAGE

Related Stories

| Nov 2, 2010

Yudelson: ‘If It Doesn’t Perform, It Can’t Be Green’

Jerry Yudelson, prolific author and veteran green building expert, challenges Building Teams to think big when it comes to controlling energy use and reducing carbon emissions in buildings.

| Nov 2, 2010

Historic changes to commercial building energy codes drive energy efficiency, emissions reductions

Revisions to the commercial section of the 2012 International Energy Conservation Code (IECC)  represent the largest single-step efficiency increase in the history of the national, model energy. The changes mean that new and renovated buildings constructed in jurisdictions that follow the 2012 IECC will use 30% less energy than those built to current standards.

| Nov 1, 2010

Sustainable, mixed-income housing to revitalize community

The $41 million Arlington Grove mixed-use development in St. Louis is viewed as a major step in revitalizing the community. Developed by McCormack Baron Salazar with KAI Design & Build (architect, MEP, GC), the project will add 112 new and renovated mixed-income rental units (market rate, low-income, and public housing) totaling 162,000 sf, plus 5,000 sf of commercial/retail space.

| Nov 1, 2010

John Pearce: First thing I tell designers: Do your homework!

John Pearce, FAIA, University Architect at Duke University, Durham, N.C., tells BD+C’s Robert Cassidy  about the school’s construction plans and sustainability efforts, how to land work at Duke, and why he’s proceeding with caution when it comes to BIM.

| Nov 1, 2010

Vancouver’s former Olympic Village shoots for Gold

The first tenants of the Millennium Water development in Vancouver, B.C., were Olympic athletes competing in the 2010 Winter Games. Now the former Olympic Village, located on a 17-acre brownfield site, is being transformed into a residential neighborhood targeting LEED ND Gold. The buildings are expected to consume 30-70% less energy than comparable structures.

| Oct 27, 2010

Grid-neutral education complex to serve students, community

MVE Institutional designed the Downtown Educational Complex in Oakland, Calif., to serve as an educational facility, community center, and grid-neutral green building. The 123,000-sf complex, now under construction on a 5.5-acre site in the city’s Lake Merritt neighborhood, will be built in two phases, the first expected to be completed in spring 2012 and the second in fall 2014.

| Oct 21, 2010

GSA confirms new LEED Gold requirement

The General Services Administration has increased its sustainability requirements and now mandates LEED Gold for its projects.

| Oct 18, 2010

World’s first zero-carbon city on track in Abu Dhabi

Masdar City, the world’s only zero-carbon city, is on track to be built in Abu Dhabi, with completion expected as early as 2020. Foster + Partners developed the $22 billion city’s master plan, with Adrian Smith + Gordon Gill Architecture, Aedas, and Lava Architects designing buildings for the project’s first phase, which is on track to be ready for occupancy by 2015.

| Oct 13, 2010

Editorial

The AEC industry shares a widespread obsession with the new. New is fresh. New is youthful. New is cool. But “old” or “slightly used” can be financially profitable and professionally rewarding, too.

boombox1
boombox2
native1

More In Category




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021