flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Top 60 K-12 School Engineering Firms

Top 60 K-12 School Engineering Firms

AECOM, Jacobs, and STV top Building Design+Construction’s annual ranking of the nation’s largest K-12 school sector engineering and E/A firms, as reported in the 2016 Giants 300 Report.


By BD+C Staff | August 1, 2016

The 18,884-sf Collegiate Center addition to Thomas Edison Prepatory High School, Tulsa, Okla., has a floating cantilever study lounge. Two multipurpose rooms double as FEMA-361 safe rooms that can each protect up to 600 persons from winds up to 240 mph. The $4.4 million addition provides 15 distinct spaces. KSQ Design led the Building Team, with the assistance of Wallace Engineering (SE), AEG Engineering, and Crossland Construction (GC). Photo courtesy KSQ Design

 

TOP 60 K-12 SCHOOL ENGINEERING FIRMS
Rank Firm 2015 Revenue
1 AECOM $50,000,000
2 Jacobs $47,790,000
3 STV $10,618,628
4 KJWW / TTG $9,576,078
5 Wendel $6,321,646
6 Loring Consulting Engineers $6,000,000
7 SSOE Group $5,830,000
8 Dewberry $5,245,499
9 KCI Technologies $5,000,000
10 M/E Engineering $4,688,355
11 Interface Engineering $4,648,596
12 Shive-Hattery $4,444,746
13 Walter P Moore $4,383,887
14 Wiss, Janney, Elstner Associates $3,820,000
15 Coffman Engineers $3,477,402
16 Bridgers & Paxton Consulting Engineers $3,463,318
17 Global Engineering Solutions $3,275,000
18 Simpson Gumpertz & Heger $2,655,000
19 Henderson Engineers $2,609,752
20 Bala Consulting Engineers $2,585,000
21 H.F. Lenz Company $1,939,675
22 Glumac $1,864,154
23 KCL Engineering $1,799,671
24 Heapy Engineering $1,625,957
25 Peter Basso Associates $1,584,834
26 RMF Engineering $1,466,500
27 Thornton Tomasetti $1,398,507
28 Highland Associates $1,300,000
29 JQ Engineering $1,251,500
30 Fishbeck, Thompson, Carr & Huber $1,200,000
31 Vanderweil Engineers $1,087,600
32 CJL Engineering, Inc. $1,080,744
33 I. C. Thomasson Associates $1,057,400
34 RDK Engineers $1,016,785
35 Rist-Frost-Shumway Engineering $1,000,000
36 Karpinski Engineering $1,000,000
37 TLC Engineering for Architecture $960,783
38 P2S Engineering $891,407
39 Graef $845,962
40 Baird, Hampton & Brown $824,059
41 OLA Consulting Engineers $800,034
42 William Tao & Associates $756,935
43 JBA Consulting Engineers $650,667
44 KLH Engineers $604,408
45 KZF Design $592,946
46 Primera Engineers $547,143
47 dbHMS $537,600
48 Wallace Engineering $500,000
49 ME Engineers $500,000
50 Newcomb & Boyd $427,804
51 Davis, Bowen & Friedel $414,817
52 Architectural Engineers $394,865
53 G & W Engineering Corp. $350,090
54 Cardno Haynes Whaley $323,309
55 Spectrum Engineers $141,327
56 CTLGroup $100,000
57 Dunham Associates $100,000
58 GHT Limited $100,000
59 Apogee Consulting Group $70,000
60 Zak Companies $50,807
61 Ghafari Associates $50,000
62 Magnusson Klemencic Associates $20,143
63 Sherlock, Smith & Adams $7,000
64 Luckett & Farley $3,703

 

RETURN TO THE GIANTS 300 LANDING PAGE

Related Stories

Multifamily Housing | Feb 21, 2023

Multifamily housing investors favoring properties in the Sun Belt

Multifamily housing investors are gravitating toward Sun Belt markets with strong job and population growth, according to new research from Yardi Matrix. Despite a sharp second-half slowdown, last year’s nationwide $187 billion transaction volume was the second-highest annual total ever.

Multifamily Housing | Feb 21, 2023

New multifamily housing and mixed-use buildings in Portland, Ore., must be ready for electric vehicle charging

The Portland, Ore., City Council recently voted unanimously to require all new residential and mixed-use buildings to be ready for electric vehicle charging. The move amends Portland’s zoning laws to require all new multi-dwelling and mixed-use development of five or more units with onsite parking to provide electric vehicle charging infrastructure.

Steel Buildings | Feb 21, 2023

AISC releases SpeedCore design guide for building concrete-filled composite steel plate shear wall core systems

The American Institute of Steel Construction has released Design Guide 38, SpeedCore Systems for Steel Structures. The document pertains to the nonproprietary concrete-filled composite steel plate shear wall core system that “shaved a whopping 10 months off the erection schedule of Seattle’s 58-story Rainier Square,” according to AISC. 

K-12 Schools | Feb 18, 2023

Atlanta suburb opens $85 million serpentine-shaped high school designed by Perkins&Will

In Ellenwood, Ga., a southeast suburb of Atlanta, Perkins and Will has partnered with Clayton County Public Schools and MEJA Construction to create a $85 million secondary school. Morrow High School, which opened in fall 2022, serves more than 2,200 students in Clayton County, a community with students from over 30 countries.

Museums | Feb 17, 2023

First Americans Museum uses design metaphors of natural elements to honor native worldview

First Americans Museum (FAM) in Oklahoma City honors the 39 tribes in Oklahoma today, reflecting their history through design metaphors of nature’s elements of earth, wind, water, and fire. The design concept includes multiple circles suggested by arcs, reflecting the native tradition of a circular worldview that encompasses the cycle of life, the seasons, and the rotation of the earth.

Senior Living Design | Feb 15, 2023

Passive House affordable senior housing project opens in Boston

Work on Phase Three C of The Anne M. Lynch Homes at Old Colony, a 55-apartment midrise building in Boston that stands out for its use of Passive House design principles, was recently completed. Designed by The Architectural Team (TAT), the four-story structure was informed throughout by Passive House principles and standards.

Multifamily Housing | Feb 10, 2023

Dallas to get a 19-story, 351-unit residential high-rise

In Dallas, work has begun on a new multifamily high-rise called The Oliver. The 19-story, 351-unit apartment building will be located within The Central, a 27-acre mixed-use development near the Knox/Henderson neighborhood north of downtown Dallas. 

Sustainability | Feb 9, 2023

New guide for planning, designing, and operating onsite water reuse systems

The Pacific Institute, a global nonpartisan water think tank, has released guidance for developers to plan, design, and operate onsite water reuse systems. The Guide for Developing Onsite Water Systems to Support Regional Water Resilience advances circular, localized approaches to managing water that reduce a site’s water footprint, improve its resilience to water shortage or other disruptions, and provide benefits for local communities and regional water systems.

Office Buildings | Feb 9, 2023

Post-Covid Manhattan office market rebound gaining momentum

Office workers in Manhattan continue to return to their workplaces in sufficient numbers for many of their employers to maintain or expand their footprint in the city, according to a survey of more than 140 major Manhattan office employers conducted in January by The Partnership for New York City.

Giants 400 | Feb 9, 2023

New Giants 400 download: Get the complete at-a-glance 2022 Giants 400 rankings in Excel

See how your architecture, engineering, or construction firm stacks up against the nation's AEC Giants. For more than 45 years, the editors of Building Design+Construction have surveyed the largest AEC firms in the U.S./Canada to create the annual Giants 400 report. This year, a record 519 firms participated in the Giants 400 report. The final report includes 137 rankings across 25 building sectors and specialty categories.   

boombox1
boombox2
native1

More In Category

Great Solutions

41 Great Solutions for architects, engineers, and contractors

AI ChatBots, ambient computing, floating MRIs, low-carbon cement, sunshine on demand, next-generation top-down construction. These and 35 other innovations make up our 2024 Great Solutions Report, which highlights fresh ideas and innovations from leading architecture, engineering, and construction firms.




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021