flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Top 60 K-12 School Engineering Firms

Top 60 K-12 School Engineering Firms

AECOM, Jacobs, and STV top Building Design+Construction’s annual ranking of the nation’s largest K-12 school sector engineering and E/A firms, as reported in the 2016 Giants 300 Report.


By BD+C Staff | August 1, 2016

The 18,884-sf Collegiate Center addition to Thomas Edison Prepatory High School, Tulsa, Okla., has a floating cantilever study lounge. Two multipurpose rooms double as FEMA-361 safe rooms that can each protect up to 600 persons from winds up to 240 mph. The $4.4 million addition provides 15 distinct spaces. KSQ Design led the Building Team, with the assistance of Wallace Engineering (SE), AEG Engineering, and Crossland Construction (GC). Photo courtesy KSQ Design

 

TOP 60 K-12 SCHOOL ENGINEERING FIRMS
Rank Firm 2015 Revenue
1 AECOM $50,000,000
2 Jacobs $47,790,000
3 STV $10,618,628
4 KJWW / TTG $9,576,078
5 Wendel $6,321,646
6 Loring Consulting Engineers $6,000,000
7 SSOE Group $5,830,000
8 Dewberry $5,245,499
9 KCI Technologies $5,000,000
10 M/E Engineering $4,688,355
11 Interface Engineering $4,648,596
12 Shive-Hattery $4,444,746
13 Walter P Moore $4,383,887
14 Wiss, Janney, Elstner Associates $3,820,000
15 Coffman Engineers $3,477,402
16 Bridgers & Paxton Consulting Engineers $3,463,318
17 Global Engineering Solutions $3,275,000
18 Simpson Gumpertz & Heger $2,655,000
19 Henderson Engineers $2,609,752
20 Bala Consulting Engineers $2,585,000
21 H.F. Lenz Company $1,939,675
22 Glumac $1,864,154
23 KCL Engineering $1,799,671
24 Heapy Engineering $1,625,957
25 Peter Basso Associates $1,584,834
26 RMF Engineering $1,466,500
27 Thornton Tomasetti $1,398,507
28 Highland Associates $1,300,000
29 JQ Engineering $1,251,500
30 Fishbeck, Thompson, Carr & Huber $1,200,000
31 Vanderweil Engineers $1,087,600
32 CJL Engineering, Inc. $1,080,744
33 I. C. Thomasson Associates $1,057,400
34 RDK Engineers $1,016,785
35 Rist-Frost-Shumway Engineering $1,000,000
36 Karpinski Engineering $1,000,000
37 TLC Engineering for Architecture $960,783
38 P2S Engineering $891,407
39 Graef $845,962
40 Baird, Hampton & Brown $824,059
41 OLA Consulting Engineers $800,034
42 William Tao & Associates $756,935
43 JBA Consulting Engineers $650,667
44 KLH Engineers $604,408
45 KZF Design $592,946
46 Primera Engineers $547,143
47 dbHMS $537,600
48 Wallace Engineering $500,000
49 ME Engineers $500,000
50 Newcomb & Boyd $427,804
51 Davis, Bowen & Friedel $414,817
52 Architectural Engineers $394,865
53 G & W Engineering Corp. $350,090
54 Cardno Haynes Whaley $323,309
55 Spectrum Engineers $141,327
56 CTLGroup $100,000
57 Dunham Associates $100,000
58 GHT Limited $100,000
59 Apogee Consulting Group $70,000
60 Zak Companies $50,807
61 Ghafari Associates $50,000
62 Magnusson Klemencic Associates $20,143
63 Sherlock, Smith & Adams $7,000
64 Luckett & Farley $3,703

 

RETURN TO THE GIANTS 300 LANDING PAGE

Related Stories

| May 24, 2012

2012 Reconstruction Awards Entry Form

Download a PDF of the Entry Form at the bottom of this page.

| May 24, 2012

Gilbane’s Spring 2012 economic report identifies multiple positive economic and market factors

Anticipating increasing escalation in owner costs through 2014.

| May 24, 2012

Construction backlog declines 5.4% in the first quarter of 2012?

The nation’s nonresidential construction activity will remain soft during the summer months, with flat to declining nonresidential construction spending.

| May 24, 2012

Stellar completes St. Mark’s Episcopal Church and Day School renovation and expansion

The project united the school campus and church campus including a 1,200-sf chapel expansion, a new 10,000-sf commons building, 7,400-sf of new covered walkways, and a drop-off pavilion.

| May 23, 2012

MBI Modular Construction Campus Launched on BDCUniversity.com

White Papers, Case Studies, Industry Annual Reports, published articles and more are offered.

| May 23, 2012

Gifford joins Perkins Eastman as principal

Design and planning expertise in science, technology, education, and healthcare.

| May 23, 2012

McRitchie joins McCarthy Building as VP, commercial services in southern California

McRitchie brings more than 18 years of experience in the California construction marketplace.

| May 23, 2012

Arizona Army National Guard Readiness Center awarded LEED Silver

LEED certification of the AZ ARNG Readiness Center was based on a number of green design and construction features SAIC implemented that positively impacted the project and the broader community.

| May 23, 2012

New hospitals invest in data centers to manage growth in patient info

Silver Cross became one of the first hospitals to install patient tracking software so families know where a patient is at all times. New communication equipment supports wireless voice and data networks throughout the hospital, providing access to patients and their families while freeing clinicians to use phones and computers where needed instead of based on location.

boombox1
boombox2
native1

More In Category


Construction Costs

Data center construction costs for 2024

Gordian’s data features more than 100 building models, including computer data centers. These localized models allow architects, engineers, and other preconstruction professionals to quickly and accurately create conceptual estimates for future builds. This table shows a five-year view of costs per square foot for one-story computer data centers. 


Sustainability

Grimshaw launches free online tool to help accelerate decarbonization of buildings

Minoro, an online platform to help accelerate the decarbonization of buildings, was recently launched by architecture firm Grimshaw, in collaboration with more than 20 supporting organizations including World Business Council for Sustainable Development (WBCSD), RIBA, Architecture 2030, the World Green Building Council (WorldGBC) and several national Green Building Councils from across the globe.


halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021