flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Top 60 Green Building Engineering Firms

Top 60 Green Building Engineering Firms

Jacobs, AECOM, and Arup top Building Design+Construction’s annual ranking of the nation’s largest green building sector engineering and E/A firms, as reported in the 2016 Giants 300 Report.


By BD+C Staff | August 3, 2016

Exterior light shelves on an office building in Denver, Colo. Photo: USEPA, U.S. government work

TOP 60 GREEN BUILDING ENGINEERING FIRMS
Rank Firm 2015 Revenue
1 Jacobs $203,161,333
2 AECOM $200,900,000
3 Arup $168,783,060
4 Thornton Tomasetti $67,382,221
5 Syska Hennessy Group $32,420,857
6 Burns & McDonnell $24,341,832
7 Vanderweil Engineers $23,508,800
8 Smith Seckman Reid $20,189,000
9 DeSimone Consulting Engineers $19,799,641
10 Dewberry $19,159,460
11 Jensen Hughes $17,500,000
12 STV $13,549,152
13 Hankins and Anderson $12,643,747
14 Affiliated Engineers $11,045,709
15 KJWW / TTG $10,750,000
16 Walter P Moore $10,727,343
17 Bala Consulting Engineers $10,300,000
18 RMF Engineering $9,218,000
19 Interface Engineering $7,325,183
20 TLC Engineering for Architecture $7,178,353
21 Henderson Engineers $7,020,123
22 Newcomb & Boyd $6,793,882
23 Spectrum Engineers $6,701,583
24 M/E Engineering $5,157,190
25 Benham Design $5,101,280
26 I. C. Thomasson Associates $5,000,000
27 Hixson Architecture, Engineering, Interiors $5,000,000
28 Bridgers & Paxton Consulting Engineers $4,737,841
29 Magnusson Klemencic Associates $4,364,152
30 Glumac $4,056,084
31 KCI Technologies $4,000,000
32 Heapy Engineering $3,800,000
33 Wendel $3,735,968
34 Ghafari Associates $3,300,000
35 Rist-Frost-Shumway Engineering $2,500,000
36 Ross & Baruzzini $2,500,000
37 JQ Engineering $2,481,900
38 Sherlock, Smith & Adams $2,426,000
39 dbHMS $2,304,000
40 OLA Consulting Engineers $2,250,000
41 GHT Limited $1,800,000
42 P2S Engineering $1,321,450
43 Architectural Engineers $1,143,662
44 Core States Group $1,099,996
45 KZF Design $948,362
46 RDK Engineers $873,482
47 Walker Parking Consultants $750,000
48 Luckett & Farley $725,800
49 KLH Engineers $700,000
50 G & W Engineering Corp. $600,154
51 William Tao & Associates $478,685
52 H.F. Lenz Company $352,640
53 Dunham Associates $250,000
54 Pedco E & A Services $195,000
55 Cardno Haynes Whaley $117,366
56 Davis, Bowen & Friedel $107,843
57 Wick Fisher White $105,000
58 Highland Associates $100,000
59 ThermalTech Engineering $80,000
60 SSOE Group $60,876
61 Primera Engineers $46,234
62 Baird, Hampton & Brown $6,383

 

RETURN TO THE GIANTS 300 LANDING PAGE

Related Stories

| Dec 29, 2014

Leo A Daly's minimally invasive approach to remote field site design [BD+C's 2014 Great Solutions Report]

For the past six years, Leo A Daly has been designing sites for remote field stations with near-zero ecological disturbance. The firm's environmentally delicate work was named a 2014 Great Solution by the editors of Building Design+Construction.

| Dec 29, 2014

Wearable job site management system allows contractors to handle deficiencies with subtle hand and finger gestures [BD+C's 2014 Great Solutions Report]

Technology combines a smartglass visual device with a motion-sensing armband to simplify field management work. The innovation was named a 2014 Great Solution by the editors of Building Design+Construction. 

| Dec 29, 2014

From Ag waste to organic brick: Corn stalks reused to make construction materials [BD+C's 2014 Great Solutions Report]

Ecovative Design applies its cradle-to-cradle process to produce 10,000 organic bricks used to build a three-tower structure in Long Island City, N.Y. The demonstration project was named a 2014 Great Solution by the editors of Building Design+Construction.

| Dec 29, 2014

14 great solutions for the commercial construction market

Ideas are cheap. Solutions are what count. The latest installment in BD+C's Great Solutions series presents 14 ways AEC professionals, entrepreneurs, and other clever folk have overcome what seemed to be insoluble problems—from how to make bricks out of agricultural waste, to a new way to keep hospitals running clean during construction.

| Dec 29, 2014

HealthSpot station merges personalized healthcare with videoconferencing [BD+C's 2014 Great Solutions Report]

The HealthSpot station is an 8x5-foot, ADA-compliant mobile kiosk that lets patients access a network of board-certified physicians through interactive videoconferencing and medical devices. It was named a 2014 Great Solution by the editors of Building Design+Construction.

| Dec 28, 2014

Robots, drones, and printed buildings: The promise of automated construction

Building Teams across the globe are employing advanced robotics to simplify what is inherently a complex, messy process—construction.

BIM and Information Technology | Dec 28, 2014

The Big Data revolution: How data-driven design is transforming project planning

There are literally hundreds of applications for deep analytics in planning and design projects, not to mention the many benefits for construction teams, building owners, and facility managers. We profile some early successful applications.  

| Dec 28, 2014

AIA course: Enhancing interior comfort while improving overall building efficacy

Providing more comfortable conditions to building occupants has become a top priority in today’s interior designs. This course is worth 1.0 AIA LU/HSW.

| Dec 28, 2014

6 trends steering today's college residence halls

University students want more in a residence hall than just a place to sleep. They want a space that reflects their style of living and learning.

| Dec 28, 2014

The lowdown on LODs: Bringing clarity to BIM

These days, BIM is par for the course across most facets of design. But a lot of the conversation surrounding BIM still lacks clarity due to ambiguous terminology, a lack of clear-cut guiding illustrations, and widely varying implementation, writes GS&P's John Scannell.

boombox1
boombox2
native1

More In Category


Museums

The Tampa Museum of Art will soon undergo a $110 million expansion

In Tampa, Fla., the Tampa Museum of Art will soon undergo a 77,904-sf Centennial Expansion project. The museum plans to reach its $110 million fundraising goal by late 2024 or early 2025 and then break ground. Designed by Weiss/Manfredi, and with construction manager The Beck Group, the expansion will redefine the museum’s surrounding site.


Reconstruction & Renovation

Movement to protect historic buildings raises sharp criticism

While the movement to preserve historic buildings has widespread support, it also has some sharp critics with well-funded opposition groups springing up in recent years. Some opponents are linked to the Stand Together Foundation, founded and bankrolled by the Koch family’s conservative philanthropic organization, according to a column in Governing magazine.


halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021