flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Top 50 Sports Facility Architecture Firms

Top 50 Sports Facility Architecture Firms

Populous, HKS, and HOK top Building Design+Construction’s annual ranking of the nation’s largest sports facility sector architecture and A/E firms, as reported in the 2016 Giants 300 Report.


By BD+C Staff | August 15, 2016

The Pavilion at Ole Miss, Oxford, Miss. AECOM (architect) and BL Harbert International (GC). Image courtesy of AECOM.

TOP 50 SPORTS FACILITY ARCHITECTURE FIRMS
Rank Firm 2015 Revenue
1 Populous $113,741,160
2 HKS $81,220,737
3 HOK $58,589,000
4 Gensler $42,850,000
5 HNTB Corporation $13,419,171
6 Cuningham Group Architecture $10,238,235
7 Moody Nolan $9,800,000
8 Sink Combs Dethlefs $9,719,919
9 VOA Associates $9,577,715
10 Stantec $8,654,844
11 DLR Group $8,400,000
12 Heery International $7,543,712
13 Rossetti $6,307,635
14 PBK $6,120,000
15 MEIS $5,800,000
16 JLG Architects $5,606,613
17 LPA $5,563,065
18 Beck Group, The $5,257,064
19 BWBR $4,061,299
20 CallisonRTKL $3,808,000
21 Diamond Schmitt Architects $3,324,000
22 EwingCole $3,285,000
23 tvsdesign $2,840,000
24 Perkins+Will $2,600,000
25 Becker Morgan Group $2,597,913
26 NORR $2,146,059
27 LS3P $2,054,885
28 NBBJ $2,000,000
29 Perkins Eastman $1,950,000
30 Rosser International $1,834,689
31 S/L/A/M Collaborative, The $1,576,000
32 GFF $1,485,422
33 ZGF Architects $1,419,287
34 DLA+ Architecture & Interior Design $1,363,472
35 Goodwyn, Mills and Cawood $1,320,557
36 HDR $1,259,200
37 Convergence Design $1,226,000
38 Alliiance $1,168,050
39 Eppstein Uhen Architects $1,091,981
40 CTA Architects Engineers $880,580
41 Kirksey Architecture $836,448
42 HGA $822,000
43 BBS Architects and Engineers $800,000
44 Guernsey $785,038
45 Architects Hawaii Ltd. $719,000
46 Clark Nexsen $700,000
47 GSB $624,057
48 SMMA | Symmes Maini & McKee Associates $606,596
49 GWWO $588,114
50 Leo A Daly $521,100

 

RETURN TO THE GIANTS 300 LANDING PAGE

Related Stories

| May 13, 2014

Universities embrace creative finance strategies

After Moody’s and other credit ratings agencies tightened their standards a few years ago, universities had to become much more disciplined about their financing mechanisms.

| May 13, 2014

19 industry groups team to promote resilient planning and building materials

The industry associations, with more than 700,000 members generating almost $1 trillion in GDP, have issued a joint statement on resilience, pushing design and building solutions for disaster mitigation.

| May 13, 2014

Libeskind wins competition to design Canadian National Holocaust Monument

A design team featuring Daniel Libeskind and Gail Dexter-Lord has won a competition with its design for the Canadian National Holocaust Monument in Toronto. The monument is set to open in the autumn of 2015.

| May 12, 2014

Defining BIM – What do owners really want?

Given the complexities of the building process, it can be difficult for building owners to effectively communicate what they want and need with BIM. The response to the question usually is, “Give me everything.” 

| May 12, 2014

The best of affordable housing: 4 projects honored with 2014 AIA/HUD Secretary Awards [slideshow]

The winners include two dramatic conversions of historic YMCA buildings into modern, affordable multifamily complexes.

| May 11, 2014

8 starter questions to answer when thinking about building

So, are you ready to start building? Completing these eight questions will help you answer that confidently. SPONSORED CONTENT

| May 11, 2014

Final call for entries: 2014 Giants 300 survey

BD+C's 2014 Giants 300 survey forms are due Wednesday, May 21. Survey results will be published in our July 2014 issue. The annual Giants 300 Report ranks the top AEC firms in commercial construction, by revenue.

| May 10, 2014

How your firm can gain an edge on university projects

Top administrators from five major universities describe how they are optimizing value on capital expenditures, financing, and design trends—and how their AEC partners can better serve them and other academic clients.

| May 9, 2014

It's official: Norman Foster-designed Harmon hotel and casino to be razed due to structural issues

Construction of the Las Vegas tower was halted in 2008 after experts discovered faulty steel beams in the structure. Now its owner, MGM, has received permission to demolish the building. 

| May 9, 2014

5 trends transforming higher education

Performance-based funding models and the adoption of advanced technologies like augmented reality for teaching are just a few of the predictions offered by CannonDesign's higher education sector leader, Brad Lukanic.

boombox1
boombox2
native1

More In Category


Warehouses

California bill would limit where distribution centers can be built

A bill that passed the California legislature would limit where distribution centers can be located and impose other rules aimed at reducing air pollution and traffic. Assembly Bill 98 would tighten building standards for new warehouses and ban heavy diesel truck traffic next to sensitive sites including homes, schools, parks and nursing homes.



halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021