flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Top 50 Retail Engineering Firms

Top 50 Retail Engineering Firms

Jacobs, Henderson Engineers, and WSP | Parsons Brinckerhoff top Building Design+Construction’s annual ranking of the nation’s largest retail sector engineering and E/A firms, as reported in the 2016 Giants 300 Report.


By BD+C Staff | August 10, 2016

AT&T Retail Store, Palo Alto, Calif. Photo: Jim Carroll, flickr Creative Commons

TOP 50 RETAIL ENGINEERING FIRMS
Rank Firm 2015 Revenue
1 Jacobs $167,960,000
2 Henderson Engineers $50,149,210
3 WSP | Parsons Brinckerhoff $33,622,000
4 Wiss, Janney, Elstner Associates $21,580,000
5 Core States Group $13,874,811
6 KLH Engineers $9,139,313
7 Wallace Engineering $8,200,000
8 Arup $7,105,331
9 Shive-Hattery $6,168,437
10 Highland Associates $5,900,000
11 Dunham Associates $5,750,000
12 Vanderweil Engineers $5,343,500
13 AECOM $5,030,000
14 Coffman Engineers $4,574,453
15 Hixson Architecture, Engineering, Interiors $4,000,000
16 KJWW / TTG $3,898,952
17 Woolpert $3,774,559
18 DeSimone Consulting Engineers $3,423,162
19 Simpson Gumpertz & Heger $3,305,000
20 Jensen Hughes $2,517,153
21 Magnusson Klemencic Associates $2,503,547
22 Dewberry $2,457,621
23 Fishbeck, Thompson, Carr & Huber $2,400,000
24 Glumac $2,215,840
25 Walter P Moore $2,174,703
26 SSOE Group $1,960,000
27 CTLGroup $1,500,000
28 Wick Fisher White $1,406,000
29 Benham Design $1,294,048
30 Interface Engineering $1,255,912
31 Bala Consulting Engineers $1,175,000
32 JBA Consulting Engineers $1,167,505
33 Graef $1,156,065
34 TLC Engineering for Architecture $1,000,119
35 ME Engineers $900,000
36 Zak Companies $830,599
37 H.F. Lenz Company $750,000
38 Davis, Bowen & Friedel $640,932
39 Luckett & Farley $621,920
40 Environmental Systems Design $523,946
41 KCI Technologies $500,000
42 Spectrum Engineers $498,012
43 Baird, Hampton & Brown $451,064
44 RMF Engineering $419,000
45 I. C. Thomasson Associates $311,000
46 G & W Engineering Corp. $250,064
47 JQ Engineering $247,800
48 Cardno Haynes Whaley $237,717
49 Smith Seckman Reid $229,051
50 Kamm Consulting $210,933
51 KZF Design $171,514
52 Thornton Tomasetti $165,438
53 Peter Basso Associates $150,984
54 Pedco E & A Services $145,000
55 STV $141,687
56 OLA Consulting Engineers $103,718
57 Karpinski Engineering $100,000

 

RETURN TO THE GIANTS 300 LANDING PAGE

Related Stories

| Feb 26, 2012

Milwaukee U-Haul facility receives LEED-CI Silver

The new elements of the facility now include: efficient lighting with day-lighting controls and occupancy sensors, a high-efficiency HVAC system used in conjunction with a newly constructed thermal envelope to help reduce energy consumption, and the installation of low-flow fixtures to reduce water consumption.

| Feb 26, 2012

Hollister Construction awarded 42,000-sf office fit-out in Holtsville, N.Y.

Space leased by U.S. General Service Administration.

| Feb 26, 2012

Alvarez-Glasman & Colvin’s Chen LEED certified

Chen works closely with property owners to ensure that their properties meet and exceed all industry standards, and also provide long-term energy savings.

| Feb 24, 2012

ABI remains positive for three straight months

The AIA reported the January ABI score was 50.9, following a mark of 51.0 in December.

| Feb 24, 2012

Larry Lord joins HDR Architecture as south region science and technology director

A founding partner at Lord, Aeck & Sargent, Lord is nationally renowned for his leadership in architecture for complex projects.

| Feb 24, 2012

Pottorff elevated to principal at Ricci Greene Associates

Pottorff is recognized in the justice field as an expert solely dedicated to the design and planning of courts and urban jails in both the U.S. and Canada.

| Feb 24, 2012

Skanska hires Tingle as senior VP and national director for its Sports Center of Excellence

Tingle has worked in the architecture and construction industries for more than 30 years, and for the last 23 years, he has focused primarily on large-scale sports construction projects

| Feb 22, 2012

ACI BIM manual for cast-in-place concrete in development

The improved communication, coordination, and collaboration afforded by BIM implementation have already been shown to save time and money in projects.

boombox1
boombox2
native1

More In Category


Healthcare Facilities

Watch on-demand: Key Trends in the Healthcare Facilities Market for 2024-2025

Join the Building Design+Construction editorial team for this on-demand webinar on key trends, innovations, and opportunities in the $65 billion U.S. healthcare buildings market. A panel of healthcare design and construction experts present their latest projects, trends, innovations, opportunities, and data/research on key healthcare facilities sub-sectors. A 2024-2025 U.S. healthcare facilities market outlook is also presented.



halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021