Vanderweil Engineers, Jacobs, and Syska Hennessy Group top Building Design+Construction’s annual ranking of the nation’s largest data center sector engineering and E/A firms, as reported in the 2016 Giants 300 Report.


By BD+C Staff | August 10, 2016

Facebook Data Center, Prineville, Oregon. Photo: Tom Raftery, flickr Creative Commons.

TOP 50 DATA CENTER ENGINEERING FIRMS
Rank Firm 2015 Revenue
1 Vanderweil Engineers $41,247,200
2 Jacobs $40,110,000
3 Syska Hennessy Group $38,578,562
4 Environmental Systems Design $14,670,507
5 Highland Associates $9,100,000
6 Dewberry $8,997,875
7 Newcomb & Boyd $4,683,201
8 Ghafari Associates $4,000,000
9 Arup $3,727,928
10 Glumac $2,971,198
11 H.F. Lenz Company $2,728,653
12 Affiliated Engineers $2,714,000
13 Burns & McDonnell $2,500,000
14 KZF Design $2,197,624
15 Zak Companies $2,001,673
16 Bala Consulting Engineers $1,880,000
17 Ross & Baruzzini $1,831,648
18 Wick Fisher White $1,720,000
19 Core States Group $1,640,527
20 Cardno Haynes Whaley $1,357,825
21 RMF Engineering $1,257,000
22 Magnusson Klemencic Associates $1,255,913
23 WSP | Parsons Brinckerhoff $1,238,000
24 Dunham Associates $1,050,000
25 KJWW / TTG $1,049,086
26 Wendel $1,005,965
27 SSOE Group $980,000
28 Bridgers & Paxton Consulting Engineers $900,406
29 Thornton Tomasetti $833,542
30 JBA Consulting Engineers $816,632
31 Henderson Engineers $793,735
32 Heapy Engineering $689,595
33 RDK Engineers $646,020
34 TLC Engineering for Architecture $629,411
35 Apogee Consulting Group $592,000
36 CRB $520,000
37 William Tao & Associates $504,623
38 Jensen Hughes $393,599
39 I. C. Thomasson Associates $373,200
40 Mazzetti $346,401
41 Pedco E & A Services $317,000
42 Wiss, Janney, Elstner Associates $250,000
43 Karpinski Engineering $250,000
44 GHT Limited $225,000
45 Hankins and Anderson $206,415
46 Spectrum Engineers $194,055
47 Smith Seckman Reid $183,242
48 ThermalTech Engineering $150,000
49 CJL Engineering, Inc. $122,099
50 Interface Engineering $121,130
51 KCI Technologies $100,000

 

RETURN TO THE GIANTS 300 LANDING PAGE

Related Stories

| May 14, 2012

Plumbing research coalition to study drainline transport issue

The effort is aimed at determining if decreasing levels of water flow­­––caused by increasingly efficient plumbing fixtures––are sufficient to clear debris from plumbing pipes.

| May 14, 2012

SOM to break ground on supertall structure in China

The 1,740-feet (530-meter) tall tower will house offices, 300 service apartments and a 350-room, 5-star hotel beneath an arched top.

| May 14, 2012

Adrian Smith + Gordon Gill Architecture design Seoul’s Dancing Dragons

Supertall two-tower complex located in Seoul’s Yongsan International Business District.

| May 14, 2012

SMPS and Deltek announce alliance

A/E/C industry leaders partner to advance technology’s role in design firm marketing and business development.

| May 14, 2012

ArchiCAD e-Specs integration unveiled

Architects, engineers and construction professionals use InterSpec’s e-SPECS products on thousands of projects annually to maintain synchronization between construction models, drawings, and project specifications.

| May 11, 2012

2012 White Paper: High-Performance Reconstructed Buildings: The 99% Solution

Download the complete White Paper, Chapters 1-10

| May 11, 2012

Chapter 10 Action Plan: 18 Recommendations for Advancing Sustainability in Reconstructed Buildings

We offer the following recommendations in the hope that they will help step up the pace of high-performance building reconstruction in the U.S. and Canada. We consulted many experts for advice, but these recommendations are solely the responsibility of the editors of Building Design+Construction. We welcome your comments. Please send them to Robert Cassidy, Editorial Director: rcassidy@sgcmail.com.

| May 11, 2012

Chapter 9 The Key to Commissioning That Works? It Never Stops

Why commissioning for existing and renovated buildings needs to be continuous to be effective.

| May 11, 2012

Chapter 8 High-Performance Reconstruction and Historic Preservation: Conflict and Opportunity

What historic preservationists and energy-performance advocates can learn from each other.

| May 11, 2012

VFA to acquire Altus Group's Capital Planning division

Strategic move strengthens VFA's facilities capital planning market osition in North America.

boombox1
boombox2
native1

More In Category

Warehouses

California bill would limit where distribution centers can be built

A bill that passed the California legislature would limit where distribution centers can be located and impose other rules aimed at reducing air pollution and traffic. Assembly Bill 98 would tighten building standards for new warehouses and ban heavy diesel truck traffic next to sensitive sites including homes, schools, parks and nursing homes.




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021