flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Top 45 Airport Terminal Engineering and E/A Firms

Top 45 Airport Terminal Engineering and E/A Firms

Jacobs surpassed $138 million in 2015 revenue to top BD+C’s annual ranking of the nation’s largest airport terminal engineering and E/A firms, as reported in the 2016 Giants 300 Report.


By BD+C Editors | July 29, 2016
Top 45 Airport Terminal Engineering and E/A Firms

Dallas/Fort Worth International Airport. Photo: Bill Dickinson/Creative Commons.

TOP AIRPORT TERMINAL ENGINEERING
AND E/A FIRMS
Rank Firm 2015 Revenue
1 Jacobs $138,770,000
2 Burns & McDonnell $71,332,857
3 WSP | Parsons Brinckerhoff $61,418,000
4 Arup $38,079,330
5 Ghafari Associates $22,500,000
6 Ross & Baruzzini $11,121,605
7 Walter P Moore $7,476,835
8 Woolpert $6,272,452
9 Jensen Hughes $6,023,819
10 Leidos $5,707,000
11 TLC Engineering for Architecture $3,940,727
12 Syska Hennessy Group $2,657,398
13 Thornton Tomasetti $2,644,230
14 Mazzetti $2,116,804
15 Magnusson Klemencic Associates $1,983,956
16 RMF Engineering $1,885,500
17 Affiliated Engineers $1,730,000
18 KJWW / TTG $1,617,989
19 Vanderweil Engineers $1,418,400
20 Newcomb & Boyd $1,211,225
21 Bala Consulting Engineers $1,175,000
22 Wiss, Janney, Elstner Associates $1,140,000
23 Graef $1,111,034
24 RDK Engineers $1,053,093
25 Stanley Consultants $967,517
26 Fishbeck, Thompson, Carr & Huber $870,000
27 Architectural Engineers $756,610
28 Environmental Systems Design $523,951
29 Dewberry $426,387
30 dbHMS $384,000
31 Spectrum Engineers $351,472
32 I. C. Thomasson Associates $311,000
33 Wallace Engineering $300,000
34 Highland Associates $250,000
35 KLH Engineers $212,082
36 Benham Design $175,124
37 Glumac $167,921
38 Smith Seckman Reid $147,248
39 P2S Engineering $107,006
40 CTLGroup $100,000
41 Bridgers & Paxton Consulting Engineers $70,570
42 Dunham Associates $50,000
43 JBA Consulting Engineers $43,900
44 Coffman Engineers $34,137
45 STV $33,763
46 Kamm Consulting $32,952
47 Loring Consulting Engineers $14,000
48 Davis, Bowen & Friedel $2,949
49 Cardno Haynes Whaley $1,106

 

RETURN TO THE GIANTS 300 LANDING PAGE

Tags

Related Stories

| Nov 2, 2010

Yudelson: ‘If It Doesn’t Perform, It Can’t Be Green’

Jerry Yudelson, prolific author and veteran green building expert, challenges Building Teams to think big when it comes to controlling energy use and reducing carbon emissions in buildings.

| Nov 2, 2010

Historic changes to commercial building energy codes drive energy efficiency, emissions reductions

Revisions to the commercial section of the 2012 International Energy Conservation Code (IECC)  represent the largest single-step efficiency increase in the history of the national, model energy. The changes mean that new and renovated buildings constructed in jurisdictions that follow the 2012 IECC will use 30% less energy than those built to current standards.

| Nov 1, 2010

Sustainable, mixed-income housing to revitalize community

The $41 million Arlington Grove mixed-use development in St. Louis is viewed as a major step in revitalizing the community. Developed by McCormack Baron Salazar with KAI Design & Build (architect, MEP, GC), the project will add 112 new and renovated mixed-income rental units (market rate, low-income, and public housing) totaling 162,000 sf, plus 5,000 sf of commercial/retail space.

| Nov 1, 2010

John Pearce: First thing I tell designers: Do your homework!

John Pearce, FAIA, University Architect at Duke University, Durham, N.C., tells BD+C’s Robert Cassidy  about the school’s construction plans and sustainability efforts, how to land work at Duke, and why he’s proceeding with caution when it comes to BIM.

| Nov 1, 2010

Vancouver’s former Olympic Village shoots for Gold

The first tenants of the Millennium Water development in Vancouver, B.C., were Olympic athletes competing in the 2010 Winter Games. Now the former Olympic Village, located on a 17-acre brownfield site, is being transformed into a residential neighborhood targeting LEED ND Gold. The buildings are expected to consume 30-70% less energy than comparable structures.

| Oct 27, 2010

Grid-neutral education complex to serve students, community

MVE Institutional designed the Downtown Educational Complex in Oakland, Calif., to serve as an educational facility, community center, and grid-neutral green building. The 123,000-sf complex, now under construction on a 5.5-acre site in the city’s Lake Merritt neighborhood, will be built in two phases, the first expected to be completed in spring 2012 and the second in fall 2014.

| Oct 21, 2010

GSA confirms new LEED Gold requirement

The General Services Administration has increased its sustainability requirements and now mandates LEED Gold for its projects.

| Oct 18, 2010

World’s first zero-carbon city on track in Abu Dhabi

Masdar City, the world’s only zero-carbon city, is on track to be built in Abu Dhabi, with completion expected as early as 2020. Foster + Partners developed the $22 billion city’s master plan, with Adrian Smith + Gordon Gill Architecture, Aedas, and Lava Architects designing buildings for the project’s first phase, which is on track to be ready for occupancy by 2015.

| Oct 13, 2010

Editorial

The AEC industry shares a widespread obsession with the new. New is fresh. New is youthful. New is cool. But “old” or “slightly used” can be financially profitable and professionally rewarding, too.

boombox1
boombox2
native1

More In Category




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021