flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Top 45 Airport Terminal Engineering and E/A Firms

Top 45 Airport Terminal Engineering and E/A Firms

Jacobs surpassed $138 million in 2015 revenue to top BD+C’s annual ranking of the nation’s largest airport terminal engineering and E/A firms, as reported in the 2016 Giants 300 Report.


By BD+C Editors | July 29, 2016
Top 45 Airport Terminal Engineering and E/A Firms

Dallas/Fort Worth International Airport. Photo: Bill Dickinson/Creative Commons.

TOP AIRPORT TERMINAL ENGINEERING
AND E/A FIRMS
Rank Firm 2015 Revenue
1 Jacobs $138,770,000
2 Burns & McDonnell $71,332,857
3 WSP | Parsons Brinckerhoff $61,418,000
4 Arup $38,079,330
5 Ghafari Associates $22,500,000
6 Ross & Baruzzini $11,121,605
7 Walter P Moore $7,476,835
8 Woolpert $6,272,452
9 Jensen Hughes $6,023,819
10 Leidos $5,707,000
11 TLC Engineering for Architecture $3,940,727
12 Syska Hennessy Group $2,657,398
13 Thornton Tomasetti $2,644,230
14 Mazzetti $2,116,804
15 Magnusson Klemencic Associates $1,983,956
16 RMF Engineering $1,885,500
17 Affiliated Engineers $1,730,000
18 KJWW / TTG $1,617,989
19 Vanderweil Engineers $1,418,400
20 Newcomb & Boyd $1,211,225
21 Bala Consulting Engineers $1,175,000
22 Wiss, Janney, Elstner Associates $1,140,000
23 Graef $1,111,034
24 RDK Engineers $1,053,093
25 Stanley Consultants $967,517
26 Fishbeck, Thompson, Carr & Huber $870,000
27 Architectural Engineers $756,610
28 Environmental Systems Design $523,951
29 Dewberry $426,387
30 dbHMS $384,000
31 Spectrum Engineers $351,472
32 I. C. Thomasson Associates $311,000
33 Wallace Engineering $300,000
34 Highland Associates $250,000
35 KLH Engineers $212,082
36 Benham Design $175,124
37 Glumac $167,921
38 Smith Seckman Reid $147,248
39 P2S Engineering $107,006
40 CTLGroup $100,000
41 Bridgers & Paxton Consulting Engineers $70,570
42 Dunham Associates $50,000
43 JBA Consulting Engineers $43,900
44 Coffman Engineers $34,137
45 STV $33,763
46 Kamm Consulting $32,952
47 Loring Consulting Engineers $14,000
48 Davis, Bowen & Friedel $2,949
49 Cardno Haynes Whaley $1,106

 

RETURN TO THE GIANTS 300 LANDING PAGE

Tags

Related Stories

| Jun 12, 2013

Sacred synergy achieves goals for religious education [2013 Building Team Award winner]

A renovation/addition project at Columbia Theological Seminary unites a historic residence hall with a modern classroom facility.

| Jun 12, 2013

‘Talking’ Braille maps help the visual impaired

Talking pen technology, combined with tactile maps, allows blind people to more easily make their way around BART stations in the Bay Area.

| Jun 11, 2013

Music/dance building supports sweet harmony [2013 Building Team Award winner]

A LEED Gold project enhances a busy Chicago neighborhood, meeting ambitious criteria for acoustical design and adaptability.

| Jun 11, 2013

Vertical urban campus fills a tall order [2013 Building Team Award winner]

Roosevelt University builds a 32-story tower to satisfy students’ needs for housing, instruction, and recreation.

| Jun 11, 2013

Building a better box: High-bay lab aims for net-zero [2013 Building Team Award winner]

Building Team cooperation and expertise help Georgia Tech create a LEED Platinum building for energy science.

| Jun 11, 2013

Dear cloud: What would you like to tell cloud-based technical providers about your needs for a solid solution?

There are many uses for the cloud applicable to those in the building industry—mainly storage of up-to-the-minute project drawings and data, giving accessibility to all project team members regardless of their location. But is that enough?

| Jun 11, 2013

Finnish elevator technology could facilitate supertall building design

KONE Corporation has announced a new elevator technology that could make it possible for supertall buildings to reach new heights by eliminating several problems of existing elevator technology. The firm's new UltraRope hoisting system uses a rope with a carbon-fiber core and high-friction coating, rather than conventional steel rope.

| Jun 10, 2013

Lake Washington STEM school combines modular and site-built construction to meet ambitious schedule

When the Lake Washington School District outside Seattle needed a new high school built on an ambitious permitting and construction schedule of seven months, modular construction proved to be an ideal solution.

| Jun 7, 2013

Must see: Building façade made of massive concrete drain pipes

Looking to create a unique atmosphere using natural materials for the Prahran Hotel pub near Melbourne, local architect Techné Architects cleverly incorporated a series of concrete sewer pipes into the building's main façade.

| Jun 7, 2013

40 Under 40 retrospective: Where are they now?

Every month we’ll be catching up with past 40 Under 40 honorees to see what they’ve been up to since winning the award. This month we focus on a construction manager and a healthcare designer.

boombox1
boombox2
native1

More In Category

Warehouses

California bill would limit where distribution centers can be built

A bill that passed the California legislature would limit where distribution centers can be located and impose other rules aimed at reducing air pollution and traffic. Assembly Bill 98 would tighten building standards for new warehouses and ban heavy diesel truck traffic next to sensitive sites including homes, schools, parks and nursing homes.




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021