flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Top 45 Airport Terminal Engineering and E/A Firms

Top 45 Airport Terminal Engineering and E/A Firms

Jacobs surpassed $138 million in 2015 revenue to top BD+C’s annual ranking of the nation’s largest airport terminal engineering and E/A firms, as reported in the 2016 Giants 300 Report.


By BD+C Editors | July 29, 2016
Top 45 Airport Terminal Engineering and E/A Firms

Dallas/Fort Worth International Airport. Photo: Bill Dickinson/Creative Commons.

TOP AIRPORT TERMINAL ENGINEERING
AND E/A FIRMS
Rank Firm 2015 Revenue
1 Jacobs $138,770,000
2 Burns & McDonnell $71,332,857
3 WSP | Parsons Brinckerhoff $61,418,000
4 Arup $38,079,330
5 Ghafari Associates $22,500,000
6 Ross & Baruzzini $11,121,605
7 Walter P Moore $7,476,835
8 Woolpert $6,272,452
9 Jensen Hughes $6,023,819
10 Leidos $5,707,000
11 TLC Engineering for Architecture $3,940,727
12 Syska Hennessy Group $2,657,398
13 Thornton Tomasetti $2,644,230
14 Mazzetti $2,116,804
15 Magnusson Klemencic Associates $1,983,956
16 RMF Engineering $1,885,500
17 Affiliated Engineers $1,730,000
18 KJWW / TTG $1,617,989
19 Vanderweil Engineers $1,418,400
20 Newcomb & Boyd $1,211,225
21 Bala Consulting Engineers $1,175,000
22 Wiss, Janney, Elstner Associates $1,140,000
23 Graef $1,111,034
24 RDK Engineers $1,053,093
25 Stanley Consultants $967,517
26 Fishbeck, Thompson, Carr & Huber $870,000
27 Architectural Engineers $756,610
28 Environmental Systems Design $523,951
29 Dewberry $426,387
30 dbHMS $384,000
31 Spectrum Engineers $351,472
32 I. C. Thomasson Associates $311,000
33 Wallace Engineering $300,000
34 Highland Associates $250,000
35 KLH Engineers $212,082
36 Benham Design $175,124
37 Glumac $167,921
38 Smith Seckman Reid $147,248
39 P2S Engineering $107,006
40 CTLGroup $100,000
41 Bridgers & Paxton Consulting Engineers $70,570
42 Dunham Associates $50,000
43 JBA Consulting Engineers $43,900
44 Coffman Engineers $34,137
45 STV $33,763
46 Kamm Consulting $32,952
47 Loring Consulting Engineers $14,000
48 Davis, Bowen & Friedel $2,949
49 Cardno Haynes Whaley $1,106

 

RETURN TO THE GIANTS 300 LANDING PAGE

Tags

Related Stories

Construction Costs | Apr 16, 2024

How the new prevailing wage calculation will impact construction labor costs

Looking ahead to 2024 and beyond, two pivotal changes in federal construction labor dynamics are likely to exacerbate increasing construction labor costs, according to Gordian's Samuel Giffin.

Healthcare Facilities | Apr 16, 2024

Mexico’s ‘premier private academic health center’ under design

The design and construction contract for what is envisioned to be “the premier private academic health center in Mexico and Latin America” was recently awarded to The Beck Group. The TecSalud Health Sciences Campus will be located at Tec De Monterrey’s flagship healthcare facility, Zambrano Hellion Hospital, in Monterrey, Mexico.

Market Data | Apr 16, 2024

The average U.S. contractor has 8.2 months worth of construction work in the pipeline, as of March 2024

Associated Builders and Contractors reported today that its Construction Backlog Indicator increased to 8.2 months in March from 8.1 months in February, according to an ABC member survey conducted March 20 to April 3. The reading is down 0.5 months from March 2023.

Laboratories | Apr 15, 2024

HGA unveils plans to transform an abandoned rock quarry into a new research and innovation campus

In the coastal town of Manchester-by-the-Sea, Mass., an abandoned rock quarry will be transformed into a new research and innovation campus designed by HGA. The campus will reuse and upcycle the granite left onsite. The project for Cell Signaling Technology (CST), a life sciences technology company, will turn an environmentally depleted site into a net-zero laboratory campus, with building electrification and onsite renewables.

Codes and Standards | Apr 12, 2024

ICC eliminates building electrification provisions from 2024 update

The International Code Council stripped out provisions from the 2024 update to the International Energy Conservation Code (IECC) that would have included beefed up circuitry for hooking up electric appliances and car chargers.

Urban Planning | Apr 12, 2024

Popular Denver e-bike voucher program aids carbon reduction goals

Denver’s e-bike voucher program that helps citizens pay for e-bikes, a component of the city’s carbon reduction plan, has proven extremely popular with residents. Earlier this year, Denver’s effort to get residents to swap some motor vehicle trips for bike trips ran out of vouchers in less than 10 minutes after the program opened to online applications.

Laboratories | Apr 12, 2024

Life science construction completions will peak this year, then drop off substantially

There will be a record amount of construction completions in the U.S. life science market in 2024, followed by a dramatic drop in 2025, according to CBRE. In 2024, 21.3 million sf of life science space will be completed in the 13 largest U.S. markets. That’s up from 13.9 million sf last year and 5.6 million sf in 2022.

Construction Costs | Apr 11, 2024

Construction materials prices increase 0.4% in March 2024

Construction input prices increased 0.4% in March compared to the previous month, according to an Associated Builders and Contractors analysis of the U.S. Bureau of Labor Statistics’ Producer Price Index data released today. Nonresidential construction input prices also increased 0.4% for the month.

K-12 Schools | Apr 10, 2024

A San Antonio school will provide early childhood education to a traditionally under-resourced region

In San Antonio, Pre-K 4 SA, which provides preschool for 3- and 4-year-olds, and HOLT Group, which owns industrial and other companies, recently broke ground on an early childhood education: the South Education Center.

University Buildings | Apr 10, 2024

Columbia University to begin construction on New York City’s first all-electric academic research building

Columbia University will soon begin construction on New York City’s first all-electric academic research building. Designed by Kohn Pedersen Fox (KPF), the 80,700-sf building for the university’s Vagelos College of Physicians and Surgeons will provide eight floors of biomedical research and lab facilities as well as symposium and community engagement spaces. 

boombox1
boombox2
native1

More In Category




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021