flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Top 40 Science + Technology Architecture Firms

Top 40 Science + Technology Architecture Firms

Perkins+Will, HDR, and HOK top Building Design+Construction’s annual ranking of the nation’s largest science + technology sector architecture and A/E firms, as reported in the 2016 Giants 300 Report.


By BD+C Staff | August 12, 2016

Georgia BioScience Training Center, Atlanta, Ga. Cooper Carry (architect), Technical College System of Georgia (owner), NBP Engineers (MEP), Eberly & Associates (CE). Photo: Carol Meyhoefer courtesy of Cooper Carry.

TOP 40 SCIENCE + TECHNOLOGY ARCHITECTURE FIRMS
Rank Firm 2015 Revenue
1 Perkins+Will $60,040,000
2 HDR $56,664,000
3 HOK $50,435,000
4 Payette $35,458,760
5 Stantec $34,755,593
6 Flad Architects $29,730,000
7 SmithGroupJJR $26,205,000
8 DGA $21,133,997
9 Page $19,500,000
10 ZGF Architects $18,405,848
11 CannonDesign $18,200,000
12 EwingCole $13,140,000
13 EYP $10,251,000
14 Studios Architecture $9,469,391
15 BRPH $8,718,716
16 Paulus, Sokolowski and Sartor $8,019,100
17 Perkins Eastman $7,800,000
18 Harley Ellis Devereaux $7,800,000
19 NBBJ $7,000,000
20 Lord Aeck Sargent $6,657,882
21 Davis Brody Bond $6,232,862
22 RS&H $5,400,000
23 Clark Nexsen $5,300,000
24 Kirksey Architecture $4,739,638
25 Gensler $4,120,000
26 Hastings+Chivetta Architects $3,850,000
27 HKS $3,163,447
28 BWBR $3,100,508
29 SMMA | Symmes Maini & McKee Associates $2,319,498
30 Tsoi/Kobus & Associates $2,171,212
31 Ware Malcomb $2,137,290
32 Alliiance $2,095,730
33 HGA $1,420,000
34 NORR $1,371,368
35 RSP Architects $1,370,000
36 VOA Associates $1,276,849
37 Solomon Cordwell Buenz $1,198,928
38 Skidmore, Owings & Merrill $1,150,519
39 Heery International $921,161
40 Emersion Design $913,189
41 Leo A Daly $844,837
42 Diamond Schmitt Architects $727,000
43 OZ Architecture $709,710
44 Guernsey $685,926
45 Wilson Architects $550,000

 

RETURN TO THE GIANTS 300 LANDING PAGE

Related Stories

Headquarters | May 16, 2023

Workplace HQ for party clothing company Shinesty celebrates its bold, whimsical products

The new Denver headquarters for Shinesty, a party clothing company, was designed to match the brand’s fun image with an iconic array of colors, textures, and prints curated by the design agency, Maximalist. Shinesty’s mission, to challenge the world to live more freely and “take itself less seriously,” is embodied throughout the office interior.

Office Buildings | May 15, 2023

Sixteen-story office tower will use 40% less energy than an average NYC office building

This month marks the completion of a new 16-story office tower that is being promoted as New York City’s most sustainable office structure. That boast is backed by an innovative HVAC system that features geothermal wells, dedicated outdoor air system (DOAS) units, radiant heating and cooling, and a sophisticated control system to ensure that the elements work optimally together.

Life of an Architect Podcast | May 15, 2023

Life of an Architect Podcast Ep. 125: What Makes a Great Employee?

How do you define a great employee? The answer is most likely dependent on who is attempting to respond: the employee or the employer. Life of an Architect's Bob Borson, FAIA, and Andrew Hawkins, AIA, talk about the traits and characteristics of great employees.

K-12 Schools | May 12, 2023

In Virginia, a new high school building helps reimagine the experience for 1,600 students

In Virginia, the City of Alexandria recently celebrated the topping out of a new building for Alexandria City High School. When complete in 2025, the high-performance structure will accommodate 1,600 students. 

University Buildings | May 11, 2023

New ‘bold and twisting’ building consolidates School of Continuing Studies at York University

The design of a new building that consolidates York University’s School of Continuing Studies into one location is a new architectural landmark at the Toronto school’s Keele Campus. “The design is emblematic of the school’s identity and culture, which is centered around accelerated professional growth in the face of a continuously evolving labor market,” according to a news release from Perkins&Will.

Sustainability | May 11, 2023

Let's build toward a circular economy

Eric Corey Freed, Director of Sustainability, CannonDesign, discusses the values of well-designed, regenerative buildings.

Hotel Facilities | May 9, 2023

A new camping destination near Utah’s Zion National Park offers a variety of all-season lodgings and amenities

Outdoor lodging brand AutoCamp has opened a new camping destination near Utah’s Zion National Park. A 16-acre property, AutoCamp Zion is located between the Virgin River and the desert of Southern Utah.

Headquarters | May 9, 2023

New Wells Fargo development in Texas will be bank’s first net-positive campus

A new Wells Fargo development in the Dallas metroplex will be the national bank’s first net-positive campus, expected to generate more energy than it uses. The 850,000-sf project on 22 acres will generate power from solar panels and provide electric vehicle charging stations.

Regulations | May 8, 2023

Supreme Court case likely to have huge impact on Clean Water Act

A case before the Supreme Court will likely determine how the Clean Water Act is interpreted and the ruling could open up new areas for development within or adjacent to wetlands.

Senior Living Design | May 8, 2023

Seattle senior living community aims to be world’s first to achieve Living Building Challenge designation

Aegis Living Lake Union in Seattle is the world’s first assisted living community designed to meet the rigorous Living Building Challenge certification. Completed in 2022, the Ankrom Moisan-designed, 70,000 sf-building is fully electrified. All commercial dryers, domestic hot water, and kitchen equipment are powered by electricity in lieu of gas, which reduces the facility’s carbon footprint.

boombox1
boombox2
native1

More In Category




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021