flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Top 40 Science + Technology Architecture Firms

Top 40 Science + Technology Architecture Firms

Perkins+Will, HDR, and HOK top Building Design+Construction’s annual ranking of the nation’s largest science + technology sector architecture and A/E firms, as reported in the 2016 Giants 300 Report.


By BD+C Staff | August 12, 2016

Georgia BioScience Training Center, Atlanta, Ga. Cooper Carry (architect), Technical College System of Georgia (owner), NBP Engineers (MEP), Eberly & Associates (CE). Photo: Carol Meyhoefer courtesy of Cooper Carry.

TOP 40 SCIENCE + TECHNOLOGY ARCHITECTURE FIRMS
Rank Firm 2015 Revenue
1 Perkins+Will $60,040,000
2 HDR $56,664,000
3 HOK $50,435,000
4 Payette $35,458,760
5 Stantec $34,755,593
6 Flad Architects $29,730,000
7 SmithGroupJJR $26,205,000
8 DGA $21,133,997
9 Page $19,500,000
10 ZGF Architects $18,405,848
11 CannonDesign $18,200,000
12 EwingCole $13,140,000
13 EYP $10,251,000
14 Studios Architecture $9,469,391
15 BRPH $8,718,716
16 Paulus, Sokolowski and Sartor $8,019,100
17 Perkins Eastman $7,800,000
18 Harley Ellis Devereaux $7,800,000
19 NBBJ $7,000,000
20 Lord Aeck Sargent $6,657,882
21 Davis Brody Bond $6,232,862
22 RS&H $5,400,000
23 Clark Nexsen $5,300,000
24 Kirksey Architecture $4,739,638
25 Gensler $4,120,000
26 Hastings+Chivetta Architects $3,850,000
27 HKS $3,163,447
28 BWBR $3,100,508
29 SMMA | Symmes Maini & McKee Associates $2,319,498
30 Tsoi/Kobus & Associates $2,171,212
31 Ware Malcomb $2,137,290
32 Alliiance $2,095,730
33 HGA $1,420,000
34 NORR $1,371,368
35 RSP Architects $1,370,000
36 VOA Associates $1,276,849
37 Solomon Cordwell Buenz $1,198,928
38 Skidmore, Owings & Merrill $1,150,519
39 Heery International $921,161
40 Emersion Design $913,189
41 Leo A Daly $844,837
42 Diamond Schmitt Architects $727,000
43 OZ Architecture $709,710
44 Guernsey $685,926
45 Wilson Architects $550,000

 

RETURN TO THE GIANTS 300 LANDING PAGE

Related Stories

| Oct 2, 2012

Bernards working on project at L.A. White Memorial Medical Center

The new facility is a $15-million, 41,000-sf concrete structure which includes three stories of medical office space atop a three-level parking garage.

| Oct 1, 2012

Tyco completes separation process, now largest pure-play fire protection and security business

Tyco Integrated Security focused on delivering security solutions to commercial businesses.

| Sep 28, 2012

Seattle is home to first LEED-certified modular radiation center

By using modular construction and strategic site design, RAD Medical Systems built the first radiation center to receive LEED certification.

| Sep 26, 2012

EDITORIAL OPPORTUNITY – BD+C Greenbuild 2012 Issue

Your firm is invited to contribute to this special issue, which will be distributed at Greenbuild San Francisco, Nov. 14-16, 2012.

| Sep 24, 2012

Reed Construction completes Lafarge headquarters in Chicago

Reed Construction was contracted to complete the full third floor build-out which included the construction of new open area work space, private offices, four conference rooms with videoconferencing capabilities and an executive conference boardroom.

| Sep 24, 2012

Chicago Lakeside shortlisted for the Sustainia Award

The “Lakeside Idea” is about bridging a brownfield industrial past to a green lifestyle future, from steel mill to innovation mill.

| Sep 24, 2012

$3.8-million athletic field and track opens in Glen Head, N.Y.

The complex also includes a new, one-story, multi-purpose building that serves as the main entry port to the athletic facilities.

| Sep 21, 2012

AAMA and WDMA release updated review and forecast that predicts industry trends

Significant volume is expected to return to the entry and interior door market as new construction demand is expected to grow at double-digit rates, outpacing remodeling and replacement activity as the housing market recovers.

| Sep 20, 2012

Mid-box retail study shows lack of available sites in Chicago

Existing supply is tight everywhere and almost non-existent in the most attractive zones.

| Sep 20, 2012

Forrester begins construction of freestanding cancer center in Montgomery County, Md.

The new 51,000-square-foot building will include two linear accelerator vaults for radiation equipment.

boombox1
boombox2
native1

More In Category

Geothermal Technology

Rochester, Minn., plans extensive geothermal network

The city of Rochester, Minn., home of the famed Mayo Clinic, is going big on geothermal networks. The city is constructing Thermal Energy Networks (TENs) that consist of ambient pipe loops connecting multiple buildings and delivering thermal heating and cooling energy via water-source heat pumps.




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021