flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Top 30 Sports Facility Engineering Firms

Top 30 Sports Facility Engineering Firms

AECOM, Thornton Tomasetti, and ME Engineers top Building Design+Construction’s annual ranking of the nation’s largest sports facility sector engineering and E/A firms, as reported in the 2016 Giants 300 Report.


By BD+C Staff | August 15, 2016

Baxter Arena, University of Nebraska, Omaha, Neb. Image courtesy of HDR Architecture, Inc.

TOP 30 SPORTS FACILITY ENGINEERING FIRMS
Rank Firm 2015 Revenue
1 AECOM $30,000,000
2 Thornton Tomasetti $21,316,147
3 ME Engineers $18,950,000
4 Walter P Moore $18,678,163
5 WSP | Parsons Brinckerhoff $18,245,000
6 Henderson Engineers $18,179,333
7 Smith Seckman Reid $7,981,930
8 Jacobs $6,930,000
9 Magnusson Klemencic Associates $4,134,707
10 KJWW / TTG $3,320,000
11 Wiss, Janney, Elstner Associates $2,930,000
12 Environmental Systems Design $2,619,733
13 Peter Basso Associates $2,136,605
14 Dewberry $2,112,240
15 Arup $2,062,091
16 Rist-Frost-Shumway Engineering $1,900,000
17 Simpson Gumpertz & Heger $1,796,000
18 Graef $1,716,269
19 TLC Engineering for Architecture $1,489,956
20 Jensen Hughes $1,222,576
21 Interface Engineering $1,031,658
22 KZF Design $1,018,479
23 Shive-Hattery $1,015,197
24 RMF Engineering $838,000
25 Baird, Hampton & Brown $756,502
26 STV $701,926
27 Davis, Bowen & Friedel $476,707
28 Bala Consulting Engineers $400,000
29 Luckett & Farley $380,197
30 Vanderweil Engineers $309,400
31 ThermalTech Engineering $300,000

 

RETURN TO THE GIANTS 300 LANDING PAGE

Related Stories

| May 19, 2011

BD+C’s "40 Under 40" winners for 2011

The 40 individuals profiled here are some of the brightest stars in the AEC universe—and they’re under the age of 40. These young architects, engineers, contractors, designers, and developers stood out among a group of 164 outstanding entrants in our sixth annual “40 Under 40” competition.

| May 18, 2011

8 Tips for Designing Wood Trusses

Successful metal-plate-connected wood truss projects require careful attention to detail from Building Team members.

| May 18, 2011

Major Trends in University Residence Halls

They’re not ‘dorms’ anymore. Today’s collegiate housing facilities are lively, state-of-the-art, and green—and a growing sector for Building Teams to explore.

| May 18, 2011

Former Bronx railyard redeveloped as shared education campus

Four schools find strength in numbers at the new 2,310-student Mott Haven Campus in New York City. The schools—three high schools and a K-4 elementary school—coexist on the 6.5-acre South Bronx campus, which was once a railyard.

| May 18, 2011

Addition provides new school for pre-K and special-needs kids outside Chicago

Perkins+Will, Chicago, designed the Early Learning Center, a $9 million, 37,000-sf addition to Barrington Middle School in Barrington, Ill., to create an easily accessible and safe learning environment for pre-kindergarten and special-needs students.

| May 18, 2011

Raphael Viñoly’s serpentine-shaped building snakes up San Francisco hillside

The hillside location for the Ray and Dagmar Dolby Regeneration Medicine building at the University of California, San Francisco, presented a challenge to the Building Team of Raphael Viñoly, SmithGroup, DPR Construction, and Forell/Elsesser Engineers. The 660-foot-long serpentine-shaped building sits on a structural framework 40 to 70 feet off the ground to accommodate the hillside’s steep 60-degree slope.

| May 18, 2011

New center provides home to medical specialties

Construction has begun on the 150,000-sf Medical Arts Pavilion at the University Medical Center in Princeton, N.J.

| May 18, 2011

Improvements add to Detroit convention center’s appeal

Interior and exterior renovations and updates will make the Detroit Cobo Center more appealing to conventioneers. A new 40,000-sf ballroom will take advantage of the center’s riverfront location, with views of the river and downtown.

| May 18, 2011

One of Delaware’s largest high schools seeks LEED for Schools designation

The $82 million, 280,000-sf Dover (Del.) High School will have capacity for 1,800 students and feature a 900-seat theater, a 2,500-seat gymnasium, and a 5,000-seat football stadium.

boombox1
boombox2
native1

More In Category

Great Solutions

41 Great Solutions for architects, engineers, and contractors

AI ChatBots, ambient computing, floating MRIs, low-carbon cement, sunshine on demand, next-generation top-down construction. These and 35 other innovations make up our 2024 Great Solutions Report, which highlights fresh ideas and innovations from leading architecture, engineering, and construction firms.




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021