flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Top 30 Military Architecture Firms

Top 30 Military Architecture Firms

HDR, Clark Nexsen, and Guernsey top Building Design+Construction’s annual ranking of the nation’s largest military sector architecture and A/E firms, as reported in the 2016 Giants 300 Report.


By BD+C Staff | August 15, 2016

Intelligence Community Campus, Bethesda, Md. Photo: Leo A Daly

TOP 30 MILITARY ARCHITECTURE FIRMS
Rank Firm 2015 Revenue
1 HDR $24,971,124
2 Clark Nexsen $13,005,940
3 Guernsey $10,279,317
4 EwingCole $8,541,000
5 RS&H $8,100,000
6 Integrus Architecture $8,054,265
7 Leo A Daly $6,179,243
8 VOA Associates $4,600,000
9 Morris Architects $4,227,000
10 Emersion Design $4,095,748
11 Schenkel & Shultz $3,676,438
12 Architects Hawaii Ltd. $3,482,000
13 SmithGroupJJR $3,424,548
14 Flad Architects $3,394,000
15 Heery International $2,893,452
16 HNTB Corporation $2,842,316
17 Zyscovich Architects $2,412,053
18 BRPH $2,260,426
19 RSP Architects $2,247,000
20 LS3P $2,157,005
21 Perkins+Will $2,140,000
22 EYP $2,113,688
23 Gensler $1,682,797
24 RNL Design $1,561,700
25 CTA Architects Engineers $1,339,358
26 Barge Waggoner Sumner & Cannon $1,200,000
27 Marshall Craft Associates $1,029,702
28 HGA $787,000
29 Gresham, Smith and Partners $654,000
30 ZGF Architects $640,674
31 Goodwyn, Mills and Cawood $620,705
32 CallisonRTKL $620,000
33 Corgan $500,000

 

RETURN TO THE GIANTS 300 LANDING PAGE

Related Stories

| Nov 15, 2011

Suffolk Construction breaks ground on the Victor housing development in Boston

Project team to manage construction of $92 million, 377,000 square-foot residential tower.

| Nov 15, 2011

Miller joins Perkins Eastman as regional manager, Middle East and Northern Africa

Miller joins Perkins Eastman with more than 48 years of experience in architecture, design management, and construction administration for planning and infrastructure.

| Nov 14, 2011

Summit Design+Build selected at GC for new Office Concepts headquarters

The new headquarters will include 17,000 sf of office space and 15,000 sf of warehouse and feature 24 ft ceilings, an open floor plan, two conference rooms and one training room and will feature sustainable finishes throughout. 

| Nov 14, 2011

Griffin Electric completes electrical work at Cary Arts Center

  The Griffin Electric team was responsible for replacing the previous electrical service on-site with a 1000A, 480/277V service and providing electrical feeds for a new fire pump chiller, six air-handlers and two elevators.

| Nov 14, 2011

303 East 33rd Street building achieves LEED-NC

  The 165,000 sf 12-story residential building is the first green development to be LEED certified in the Murray Hill neighborhood of Manhattan.

| Nov 14, 2011

VanSumeren appointed to Traco general manager

VanSumeren will draw on his more than 20 years of experience in manufacturing management and engineering to deliver operational and service excellence and drive profitable growth for Traco. 

| Nov 11, 2011

By the Numbers

What do ‘46.9,’ ‘886.2,’ and ‘171,271’ mean to you? Check here for the answer.

| Nov 11, 2011

Streamline Design-build with BIM

How construction manager Barton Malow utilized BIM and design-build to deliver a quick turnaround for Georgia Tech’s new practice facility.

boombox1
boombox2
native1

More In Category



Urban Planning

The magic of L.A.’s Melrose Mile

Great streets are generally not initially curated or willed into being. Rather, they emerge organically from unintentional synergies of commercial, business, cultural and economic drivers. L.A.’s Melrose Avenue is a prime example. 


Curtain Wall

7 steps to investigating curtain wall leaks

It is common for significant curtain wall leakage to involve multiple variables. Therefore, a comprehensive multi-faceted investigation is required to determine the origin of leakage, according to building enclosure consultants Richard Aeck and John A. Rudisill with Rimkus. 

halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021