TOP 30 DATA CENTER ARCHITECTURE FIRMS | ||
Rank | Firm | 2015 Revenue |
1 | Gensler | $34,240,000 |
2 | Corgan | $32,400,000 |
3 | HDR | $15,740,000 |
4 | Page | $14,100,000 |
5 | CallisonRTKL | $6,102,000 |
6 | RS&H | $5,400,000 |
7 | Clark Nexsen | $3,105,999 |
8 | HOK | $2,535,000 |
9 | DLR Group | $1,600,000 |
10 | Stantec | $1,575,034 |
11 | DGA | $1,411,255 |
12 | Schrader Group Architecture | $1,103,544 |
13 | Little | $998,100 |
14 | Wold Architects and Engineers | $950,000 |
15 | Becker Morgan Group | $684,369 |
16 | Environetics | $667,731 |
17 | SMMA | Symmes Maini & McKee Associates | $610,175 |
18 | Perkins Eastman | $487,500 |
19 | Nelson Worldwide Holdings | $409,156 |
20 | Ware Malcomb | $377,168 |
21 | GRW | $368,693 |
22 | CTA Architects Engineers | $358,478 |
23 | Schenkel & Shultz | $350,384 |
24 | BWBR | $300,247 |
25 | GFF | $274,577 |
26 | RSP Architects | $219,000 |
27 | Barge Waggoner Sumner & Cannon | $200,000 |
28 | JRS Architect | $175,000 |
29 | Kirksey Architecture | $168,436 |
30 | OZ Architecture | $105,000 |
RETURN TO THE GIANTS 300 LANDING PAGE
Related Stories
| Aug 27, 2014
Designs for community-based workspace in Carlsbad unveiled
Cruzan announced make, a 175,000-square-foot office redevelopment project on the coast of Carlsbad, Calif. Cruzan will usher this next generation of community-based, integrated workspace into existence in fall 2014.
| Aug 26, 2014
6 lessons from a true IPD project: George Washington University Hospital
In its latest blog post, Skanska shares tips and takeaways from the firm's second true integrated project delivery project.
| Aug 26, 2014
Ranked: Top industrial sector AEC firms [2014 Giants 300 Report]
Stantec, Jacobs, and Turner top BD+C's rankings of the nation's largest industrial sector design and construction firms, as reported in the 2014 Giants 300 Report.
| Aug 26, 2014
High-rise concept uses 'sky street' to link towers [slideshow]
The design for a new complex in Shenzhen’s bay area consists of highly reflective glass towers, expansive garden space, and a horizontal glass structure that connects the buildings.
| Aug 25, 2014
Restoration of quake-ravaged Atascadero City Hall affirms city’s strength [2014 Reconstruction Awards]
The landmark city hall was severely damaged by the San Simeon earthquake in 2003. Reconstruction renewed the building’s stability, restored its exterior, and improved the functionality of the interior.
| Aug 25, 2014
Ranked: Top cultural facility sector AEC firms [2014 Giants 300 Report]
Arup, Gensler, and Turner head BD+C's rankings of design and construction firms with the most revenue from cultural facility projects, as reported in the 2014 Giants 300 Report.
| Aug 25, 2014
Tall wood buildings: Surveying the early innovators
Timber has been largely abandoned as a structural solution in taller buildings during the last century, in favor of concrete and steel. Perkins+Will's Rebecca Holt writes about the firm's work in surveying the burgeoning tall wood buildings sector.
| Aug 25, 2014
'Vanity space' makes up large percentage of world's tallest buildings [infographic]
Large portions of some skyscrapers are useless space used to artificially enhance their height, according to the Council on Tall Buildings and Urban Habitat.
| Aug 25, 2014
Photographer creates time-lapse video of 1 WTC using 30,000 photos
Choosing from 30,000 photos he took from the day construction began in 2006 to the day when construction was finished in 2012, Brooklyn-based photographer Benjamin Rosamund compressed 1,100 photos to create the two-minute video.
| Aug 25, 2014
Glazing plays key role in reinventing stairway design
Within the architectural community, a movement called "active design" seeks to convert barren and unappealing stairwells originally conceived as emergency contingencies into well-designed architectural focal points. SPONSORED CONTENT