- Canada: 100 Wellington Street West Tower at the Dominion Centre in Toronto, LEED Platinum, the first project in the city to achieve Platinum certification under LEED for Existing Buildings: Operations & Maintenance
- China: Haworth Showroom in the Parkview Green in Beijing, LEED Gold, the first project to certify under LEED v4, the latest version of LEED
- India: ITC Maurya Hotel in New Delhi, built in 1977, Platinum under LEED for Existing Buildings: Operations & Maintenance
- South Korea: Samsung GREEN TOMORROW, the first LEED Platinum project in East Asia
- Taiwan: Taipei 101, one of the tallest buildings in the world, LEED Platinum under LEED for Existing Buildings: Operations & Maintenance
- Germany: MesseTurm in Frankfurt, an iconic 63-story skyscraper and one of the tallest in Europe, LEED Silver
- Brazil: Castelao Arena in Fortaleza, the first 2014 World Cup stadium to earn LEED certification
- Singapore: Asia Square Tower 1, a 43-story office building, LEED Platinum
- United Arab Emirates: Dubai Electricity and Water Authority Headquarters, LEED Platinum
- Finland: Sello shopping center, the first European shopping mall to receive LEED Gold
Related Stories
| Oct 13, 2010
Editorial
The AEC industry shares a widespread obsession with the new. New is fresh. New is youthful. New is cool. But “old” or “slightly used” can be financially profitable and professionally rewarding, too.
| Oct 13, 2010
Test run on the HP Z200 SFF Good Value in a Small Package
Contributing Editor Jeff Yoders tests a new small-form factor, workstation-class desktop in Hewlett-Packard’s line that combines performance of its minitower machine with a smaller chassis and a lower price.
| Oct 13, 2010
Prefab Trailblazer
The $137 million, 12-story, 500,000-sf Miami Valley Hospital cardiac center, Dayton, Ohio, is the first major hospital project in the U.S. to have made extensive use of prefabricated components in its design and construction.
| Oct 13, 2010
Thought Leader
Sundra L. Ryce, President and CEO of SLR Contracting & Service Company, Buffalo, N.Y., talks about her firm’s success in new construction, renovation, CM, and design-build projects for the Navy, Air Force, and Buffalo Public Schools.
| Oct 13, 2010
Hospital tower gets modern makeover
The Wellmont Holston Valley Medical Center in Kingsport, Tenn., expanded its D unit, a project that includes a 243,443-sf addition with a 12-room operating suite, a 36-bed intensive care unit, and an enlarged emergency department.
| Oct 13, 2010
Modern office design accentuates skyline views
Intercontinental|Exchange, a Chicago-based financial firm, hired design/engineering firm Epstein to create a modern, new 31st-floor headquarters.
| Oct 13, 2010
Hospital and clinic join for better patient care
Designed by HGA Architects and Engineers, the two-story Owatonna (Minn.) Hospital, owned by Allina Hospitals and Clinics, connects to a newly expanded clinic owned by Mayo Health System to create a single facility for inpatient and outpatient care.
| Oct 13, 2010
Biloxi’s convention center bigger, better after Katrina
The Mississippi Coast Coliseum and Convention Center in Biloxi is once again open for business following a renovation and expansion necessitated by Hurricane Katrina.
| Oct 13, 2010
Tower commemorates Lewis & Clark’s historic expedition
The $4.8 million Lewis and Clark Confluence Tower in Hartford, Ill., commemorates explorers Meriwether Lewis and William Clark at the point where their trek to the Pacific Ocean began—the confluence of the Mississippi and Missouri Rivers.
| Oct 13, 2010
Maryland replacement hospital expands care, changes name
The new $120 million Meritus Regional Medical Center in Hagerstown, Md., has 267 beds, 17 operating rooms with high-resolution video screens, a special care level II nursery, and an emergency room with 53 treatment rooms, two trauma rooms, and two cardiac rooms.