- Canada: 100 Wellington Street West Tower at the Dominion Centre in Toronto, LEED Platinum, the first project in the city to achieve Platinum certification under LEED for Existing Buildings: Operations & Maintenance
- China: Haworth Showroom in the Parkview Green in Beijing, LEED Gold, the first project to certify under LEED v4, the latest version of LEED
- India: ITC Maurya Hotel in New Delhi, built in 1977, Platinum under LEED for Existing Buildings: Operations & Maintenance
- South Korea: Samsung GREEN TOMORROW, the first LEED Platinum project in East Asia
- Taiwan: Taipei 101, one of the tallest buildings in the world, LEED Platinum under LEED for Existing Buildings: Operations & Maintenance
- Germany: MesseTurm in Frankfurt, an iconic 63-story skyscraper and one of the tallest in Europe, LEED Silver
- Brazil: Castelao Arena in Fortaleza, the first 2014 World Cup stadium to earn LEED certification
- Singapore: Asia Square Tower 1, a 43-story office building, LEED Platinum
- United Arab Emirates: Dubai Electricity and Water Authority Headquarters, LEED Platinum
- Finland: Sello shopping center, the first European shopping mall to receive LEED Gold
Related Stories
| Mar 12, 2014
New CannonDesign database allows users to track facility assets
The new software identifies critical failures of components and systems, code and ADA-compliance issues, and systematically justifies prudent expenditures.
| Mar 11, 2014
7 (more) awe-inspiring interior designs [slideshow]
The seven winners of the 41st Interior Design Competition and the 22nd Will Ching Design Competition include projects on four different continents.
| Mar 11, 2014
Freelon Group to join Perkins+Will
The Freelon Group concentrates on museums, libraries, universities and other civic and institutional clients; Perkins+Will plans to incorporate this specialization into their design repertory.
| Mar 10, 2014
Meet Tally – the Revit app that calculates the environmental impact of building materials
Tally provides AEC professionals with insight into how materials-related decisions made during design influence a building’s overall ecological footprint.
Sponsored | | Mar 10, 2014
A high-performance barn
Bastoni Vineyards replaces a wooden barn with an efficient metal building used for maintenance, storage, and hosting events.
| Mar 10, 2014
Field tested: Caterpillar’s Cat B15 rugged smartphone
The B15 is billed by Cat as “the most progressive, durable and rugged device available on the market today.”
| Mar 10, 2014
5 rugged mobile devices geared for construction pros
BD+C readers share their most trusted smartphone and tablet cases. The editors select some of their faves, too.
| Mar 7, 2014
Thom Mayne's high-tech Emerson College LA campus opens in Hollywood [slideshow]
The $85 million, 10-story vertical campus takes the shape of a massive, shimmering aircraft hangar, housing a sculptural, glass-and-aluminum base building.
| Mar 7, 2014
Learning from common leadership errors
As a leader in the AEC world, you’ll likely find yourself making certain mistakes over the course of your career. Here are a few common leadership errors that can easily be avoided.
| Mar 6, 2014
BD+C wants to hear about your breakthrough ideas and projects for the Giants 300 report
BD+C's 2014 Giants 300 survey form is now available. But completing the survey is just one way to participate in the July Giants issue.