BD+C editors and our contributors posted hundreds of blogs in 2013. Here's a recap of the most popular topics. They include valuable lessons from one of the first BIM-related lawsuits and sage advice from AEC legend Arthur Gensler.
1. Lawsuit teaches valuable lesson on BIM and communication
While browsing through some magazines on a flight, I read a cautionary tale about one of the first BIM-related lawsuits. The crux of the issue centered on the lack of communication between the architect, MEP engineer, and contractor. By Sasha Reed Read the post.
2. Eight of history’s biggest design blunders
“Learn from the mistakes of others. You can’t live long enough to make them all yourself.” Eleanor Roosevelt’s famous quote rings true when one considers the many failures and resulting lessons learned in the history of architecture, engineering and design. By Cannon Design Read the post.
3. Arthur Gensler to architects: Don't give away your ideas
The founder of Gensler advises dozens of up-and-coming AEC professionals at BD+C's Under 40 Leadership Summit in San Francisco. By David Barista Read the post.
4. Are these the '10 buildings that changed America'? Not likely
The other day we posted an announcement about PBS's upcoming special, "10 Buildings That Changed America." I don't pretend to be an architectural historian, but does anyone else think there are some unusual choices here? By Robert Cassidy Read the post.
5. Brainstorming solutions to BIM implementation challenges – What hardware do you really need?
Even as more owners, agencies, and AEC firms are turning to BIM, it is impossible to ignore the fact that many of these organizations are still struggling with BIM implementation. By Sasha Reed Read the post.
6. Three new insulation materials could be powerful solutions on commercial retrofits
Three innovative insulation materials, including vacuum insulation panels and phase-change materials, could soon be used for commercial building retrofits in the U.S., as costs of these products fall and revamped local building codes allow their use. By Drew Ballensky Read the post.
7. Does billing by the hour still make sense?
What’s an idea really worth? That’s the question posed by The New York Times in a provocative article that explores whether the notion of billing time still makes economic sense. By Steven Burns Read the post.
8. BIM 2.0 and Google Glass: Science fiction or coming attractions for a job site near you?
Todd Wynne of Rogers-O’Brien Construction is one of only 8,000 people around the globe granted a pair of Google Glass for testing. Here's what he's been up to with the technology. By Sasha Reed Read the post.
9. Better ways to manage PDF drawing sets – A customer's wish comes true
Sometimes in order to solve a challenge, you simply need walk around the problem and look at it from different angles. By Sasha Reed Read the post.
10. Shuttered Pyramid arena in Memphis to be renovated for Bass Pro Shops
The vacant Pyramid arena in downtown Memphis will be transformed into a Bass Pro Shop. Instead of a 210-room hotel on three floors around The Pyramid's interior, Bass Pro Shops founder Johnny Morris is considering building 60 to 80 "cabins" inside the building. By Drew Ballensky Read the post.
Related Stories
| Oct 13, 2010
HQ renovations aim for modern look
Gerner Kronick + Valcarcel Architects’ renovations to the Commonwealth Bank of Australia’s New York City headquarters will feature a reworked reception lobby with back-painted glass, silk-screened logos, and a video wall.
| Oct 13, 2010
New health center to focus on education and awareness
Construction is getting pumped up at the new Anschutz Health and Wellness Center at the University of Colorado, Denver. The four-story, 94,000-sf building will focus on healthy lifestyles and disease prevention.
| Oct 13, 2010
Community center under way in NYC seeks LEED Platinum
A curving, 550-foot-long glass arcade dubbed the “Wall of Light” is the standout architectural and sustainable feature of the Battery Park City Community Center, a 60,000-sf complex located in a two-tower residential Lower Manhattan complex. Hanrahan Meyers Architects designed the glass arcade to act as a passive energy system, bringing natural light into all interior spaces.
| Oct 13, 2010
Community college plans new campus building
Construction is moving along on Hudson County Community College’s North Hudson Campus Center in Union City, N.J. The seven-story, 92,000-sf building will be the first higher education facility in the city.
| Oct 13, 2010
Bookworms in Silver Spring getting new library
The residents of Silver Spring, Md., will soon have a new 112,000-sf library. The project is aiming for LEED Silver certification.
| Oct 13, 2010
County building aims for the sun, shade
The 187,032-sf East County Hall of Justice in Dublin, Calif., will be oriented to take advantage of daylighting, with exterior sunshades preventing unwanted heat gain and glare. The building is targeting LEED Silver. Strong horizontal massing helps both buildings better match their low-rise and residential neighbors.
| Oct 12, 2010
Holton Career and Resource Center, Durham, N.C.
27th Annual Reconstruction Awards—Special Recognition. Early in the current decade, violence within the community of Northeast Central Durham, N.C., escalated to the point where school safety officers at Holton Junior High School feared for their own safety. The school eventually closed and the property sat vacant for five years.
| Oct 12, 2010
Guardian Building, Detroit, Mich.
27th Annual Reconstruction Awards—Special Recognition. The relocation and consolidation of hundreds of employees from seven departments of Wayne County, Mich., into the historic Guardian Building in downtown Detroit is a refreshing tale of smart government planning and clever financial management that will benefit taxpayers in the economically distressed region for years to come.
| Oct 12, 2010
Richmond CenterStage, Richmond, Va.
27th Annual Reconstruction Awards—Bronze Award. The Richmond CenterStage opened in 1928 in the Virginia capital as a grand movie palace named Loew’s Theatre. It was reinvented in 1983 as a performing arts center known as Carpenter Theatre and hobbled along until 2004, when the crumbling venue was mercifully shuttered.
| Oct 12, 2010
University of Toledo, Memorial Field House
27th Annual Reconstruction Awards—Silver Award. Memorial Field House, once the lovely Collegiate Gothic (ca. 1933) centerpiece (along with neighboring University Hall) of the University of Toledo campus, took its share of abuse after a new athletic arena made it redundant, in 1976. The ultimate insult occurred when the ROTC used it as a paintball venue.