New York City architects Tod Williams and Billie Tsien will design the new Obama Presidential Center in Chicago.
The Chicago Tribune reports that President Barack Obama and first lady Michelle Obama chose the husband-and-wife design duo over six other prestigious firms.
Tod Williams Billie Tsien Architects has a number of cultural and academic projects in its portfolio, including the Barnes Foundation in Philadelphia and the Logan Center for the Arts at the University of Chicago. Williams and Tsien became architectural partners in 1986. And as the Tribune reports, President Obama awarded them a National Medal of Arts in 2013.
The Barack Obama Foundation began its search for an architect last August, and the field of 140 architects was whittled down to seven finalists in December. The other finalists were Diller Scofidio + Renfro, SHoP Architects, Snohetta, Adjaye Associates, Renzo Piano Building Workshop, and John Ronan Architects.
The center, which is expected to cost more than $500 million, will be built in either Washington Park or Jackson Park in Chicago. It will have presidential archives, a museum dedicated to Obama’s tenure, and other digital exhibits and features.
The Tribune reports that hundreds of millions of dollars still need to be raised, and that construction isn’t scheduled to begin until after January 2017. The center should be completed by 2021.
Related Stories
| Mar 7, 2012
LEO A DALY selected to design Minnesota Fallen Firefighters Memorial
The bronze, figurative sculpture of a firefighter rescuing a child, which is currently on display at the Minneapolis/St. Paul International Airport, is lit by natural light through a circular void in the monolith.
| Feb 15, 2012
Englewood Construction announces new projects with Destination Maternity, American Girl
Englewood’s newest project for Wisconsin-based doll retailer American Girl, the company will combine four vacant storefronts into one large 15,000 square-foot retail space for American Girl.
| Feb 2, 2012
Call for Entries: 2012 Building Team Awards. Deadline March 2, 2012
Winning projects will be featured in the May issue of BD+C.
| Jan 31, 2012
Fusion Facilities: 8 reasons to consolidate multiple functions under one roof
‘Fusing’ multiple functions into a single building can make it greater than the sum of its parts. The first in a series on the design and construction of university facilities.
| Jan 24, 2012
U of M installs new lighting at Crisler Player Development Center
Energy efficient lighting installed at PDC reduce costs and improves player performance.
| Jan 6, 2012
New Walgreen's represents an architectural departure
The structure's exterior is a major departure from the corporate image of a traditional Walgreens design.
| Dec 7, 2011
ICS Builders and BKSK Architects complete St. Hilda’s House in Manhattan
The facility's design highlights the inherent link between environmental consciousness and religious reverence.
| Dec 5, 2011
SchenkelShultz Architecture designs Dr. Phillips Charities Headquarters building in Orlando
The building incorporates sustainable architectural features, environmentally friendly building products, energy-efficient systems, and environmentally-sensitive construction practices.
| Nov 29, 2011
SB Architects completes Mission Hills Volcanic Mineral Springs and Spa in China
Mission Hills Volcanic Mineral Springs and Spa is home to the largest natural springs reserve in the region, and measures 950,000 sf.