Tishman Construction Corporation is managing the construction of a new, $160-million, 14-story, 510,000-sf Philadelphia Family Courthouse for the Pennsylvania Department of General Services (DGS) at the northwest corner of 15th and Arch streets. With excavation almost complete and foundations having begun, the building is planned to be completed by the Spring of 2014.
The Family Courthouse project is the largest construction project in Philadelphia since the Pennsylvania Convention Center expansion and the renovation of the former 30th Street Post Office for the IRS. Tishman successfully delivered the convention center three months early as part of a joint venture.
The courthouse building, designed by EwingCole, is pursuing LEED Silver certification. The first level of the building will include the main entrance, court queuing and security, a vehicular port for prisoners being brought to the building for court appearances, building support areas, and the parking lobby. The second level will include court support offices, prisoner holding cells, and a public vending area accessed by elevator and escalator. BD+C
Related Stories
| Mar 12, 2014
AIA gives support to legislation to assist architecture students with debt
The National Design Services Act will give architecture students relief from student loan debt in return for community service.
| Mar 12, 2014
New CannonDesign database allows users to track facility assets
The new software identifies critical failures of components and systems, code and ADA-compliance issues, and systematically justifies prudent expenditures.
| Mar 11, 2014
7 (more) awe-inspiring interior designs [slideshow]
The seven winners of the 41st Interior Design Competition and the 22nd Will Ching Design Competition include projects on four different continents.
| Mar 11, 2014
Freelon Group to join Perkins+Will
The Freelon Group concentrates on museums, libraries, universities and other civic and institutional clients; Perkins+Will plans to incorporate this specialization into their design repertory.
| Mar 10, 2014
Meet Tally – the Revit app that calculates the environmental impact of building materials
Tally provides AEC professionals with insight into how materials-related decisions made during design influence a building’s overall ecological footprint.
Sponsored | | Mar 10, 2014
A high-performance barn
Bastoni Vineyards replaces a wooden barn with an efficient metal building used for maintenance, storage, and hosting events.
| Mar 10, 2014
Field tested: Caterpillar’s Cat B15 rugged smartphone
The B15 is billed by Cat as “the most progressive, durable and rugged device available on the market today.”
| Mar 10, 2014
5 rugged mobile devices geared for construction pros
BD+C readers share their most trusted smartphone and tablet cases. The editors select some of their faves, too.
| Mar 7, 2014
Thom Mayne's high-tech Emerson College LA campus opens in Hollywood [slideshow]
The $85 million, 10-story vertical campus takes the shape of a massive, shimmering aircraft hangar, housing a sculptural, glass-and-aluminum base building.
| Mar 7, 2014
Learning from common leadership errors
As a leader in the AEC world, you’ll likely find yourself making certain mistakes over the course of your career. Here are a few common leadership errors that can easily be avoided.