A Skanska executive offers 10 tips to make the best use of salvaged construction materials in a Living Building post. The advice includes:
· Early integration of the project team. This allows contractors to advise designers early on the practicality of using salvaged materials.
· Work with local reuse organizations. These groups obtain materials from deconstructed buildings and may have what you need close by.
· Look for opportunities to source materials. Even ordinary buildings contain materials that can be of use. Look early and often for these treasures.
· Obtain a staging warehouse. Setting aside a portion of a garage or other building, or renting a storage unit can fill the bill.
· Be ready in the schematic design phase. This is the best stage to analyze salvage possibilities.
· Know hurdles and limitations. Salvage projects may face technical challenges that don’t exist for new materials and products including warranties, specifications, and ratings for things like structural materials, mechanical equipment, and plumbing.
Related Stories
Codes and Standards | Jan 6, 2022
Virginia contractors having a tough time finding diverse subs to meet state goals
Survey of primes may indicate similar issues at federal level.
Codes and Standards | Jan 5, 2022
Boston drops parking requirements for affordable housing
Measure expected to spur new projects.
Codes and Standards | Jan 4, 2022
Dept. of Energy Better Climate Challenge aims for 50% GHG emission reduction by 2030
Program offers technical assistance and peer-to-peer knowledge sharing.
Codes and Standards | Jan 4, 2022
Architects at New York firm take steps to unionize
Support for unionization reported at two other New York firms.
Codes and Standards | Jan 3, 2022
Biden’s executive order for a carbon-neutral government includes green materials mandate
As a driver of demand, federal procurement impact could ripple through the economy.
Codes and Standards | Jan 3, 2022
Controversial California solar power incentive proposal would reduce subsidies
Plan intended to encourage customers to install power storage systems.
Codes and Standards | Jan 3, 2022
New York City bans new gas hookups
Applies to gas stoves, boilers, and heaters in new buildings and buildings that undergo gut renovations.
Codes and Standards | Jan 3, 2022
New engineering guide on fire safety for very tall buildings released
Topics include emergency egress, fire resistance, building envelope, suppression, detection, alarms, and smoke control.
Codes and Standards | Dec 22, 2021
Updated ASCE 7-22 standard includes first-ever criteria for tornado-resistant design
New document provides up-to-date, coordinated loading provisions for general structural design.
Codes and Standards | Dec 21, 2021
Outdated and redundant building codes plague St. Louis area development
Region’s combined codes nearly double the length of the IRS Code.