flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Tips to make optimal use of salvaged materials

Codes and Standards

Tips to make optimal use of salvaged materials

Integrated teams, staging warehouse, and looking early and often, among recommendations.


By Peter Fabris, Contributing Editor | July 16, 2020

Courtesy Pixabay

A Skanska executive offers 10 tips to make the best use of salvaged construction materials in a Living Building post. The advice includes:

· Early integration of the project team. This allows contractors to advise designers early on the practicality of using salvaged materials.

· Work with local reuse organizations. These groups obtain materials from deconstructed buildings and may have what you need close by.

· Look for opportunities to source materials. Even ordinary buildings contain materials that can be of use. Look early and often for these treasures.

· Obtain a staging warehouse. Setting aside a portion of a garage or other building, or renting a storage unit can fill the bill.

· Be ready in the schematic design phase. This is the best stage to analyze salvage possibilities.

· Know hurdles and limitations. Salvage projects may face technical challenges that don’t exist for new materials and products including warranties, specifications, and ratings for things like structural materials, mechanical equipment, and plumbing.

Related Stories

| Aug 11, 2010

Best AEC Firms of 2011/12

Later this year, we will launch Best AEC Firms 2012. We’re looking for firms that create truly positive workplaces for their AEC professionals and support staff. Keep an eye on this page for entry information. +

boombox1
boombox2
native1

More In Category




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021