A Skanska executive offers 10 tips to make the best use of salvaged construction materials in a Living Building post. The advice includes:
· Early integration of the project team. This allows contractors to advise designers early on the practicality of using salvaged materials.
· Work with local reuse organizations. These groups obtain materials from deconstructed buildings and may have what you need close by.
· Look for opportunities to source materials. Even ordinary buildings contain materials that can be of use. Look early and often for these treasures.
· Obtain a staging warehouse. Setting aside a portion of a garage or other building, or renting a storage unit can fill the bill.
· Be ready in the schematic design phase. This is the best stage to analyze salvage possibilities.
· Know hurdles and limitations. Salvage projects may face technical challenges that don’t exist for new materials and products including warranties, specifications, and ratings for things like structural materials, mechanical equipment, and plumbing.
Related Stories
Codes and Standards | Mar 21, 2017
Calif. shopping center is first to earn BREEAM USA In-Use certification
The certification measures and monitors environmental performance of existing buildings.
Codes and Standards | Mar 20, 2017
Professional liability insurance rates for architects and engineers expected to be stable in 2017
Premiums leveled off in 2015, and claims have been stable, helping to hold costs down.
Codes and Standards | Mar 15, 2017
Energy Star program at risk
The standard-setting initiative for energy-efficient products may be a victim of Trump budget cuts.
Codes and Standards | Mar 14, 2017
Timber Innovation Act to promote tall wood buildings introduced in Congress
The measure has bipartisan support.
Codes and Standards | Mar 13, 2017
U.S. House and Senate have voted to repeal Dept. of Labor’s 'blacklisting' rule
The rule mandates labor compliance review for federal construction contractors.
Codes and Standards | Mar 9, 2017
WiredScore forms Connectivity Advisory Committee
The committee's creation is an important step forward for the group that evaluates internet connectivity in buildings.
Codes and Standards | Mar 8, 2017
New guide examines multifamily high-performance ventilation
The focus is on cost and performance of various systems.
Codes and Standards | Mar 7, 2017
Canada’s national building codes will encompass effects of climate change
Forecasted data, not historical data, will be used as the basis for the codes.
Codes and Standards | Mar 6, 2017
ConsensusDocs updates standard short contract editions
The updates address industry changes impacting insurance, legal, technology, and terminology.
Codes and Standards | Mar 3, 2017
ASCE updates standard for structures using tensile membrane
The new sstandard combines guidelines for conventional tensile membrane structures with frame-covered membrane structures.