flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

thyssenkrupp’s new Zhongshan plant includes a high-speed test tower

Industrial Facilities

thyssenkrupp’s new Zhongshan plant includes a high-speed test tower

The 813-foot test tower has 13 shafts.


By David Malone, Associate Editor | March 26, 2018
thyssenkrupp's new test tower in China

Courtesy thyssenkrupp

thyssenkrupp recently opened its newest plant in Zhongshan City, Guangdong Province, China. The focal point of the new facility is an 813-foot tower (31 floors above ground) that will be used to test new concepts and product pilots.

The tower includes 13 shafts and an Active Mass Damper (AMD) system meant to significantly reduce the extent of tower swing caused by changes in weather conditions. The AMD system can also mimic motions of extreme meteorological conditions, like earthquakes and typhoons.

A new high-speed elevator capable of reaching 40 miles per hour and MULTI, the world’s first rope-less elevator system, will be among the first technologies tested in the new tower. MULTI uses the power of linear motor technology to move multiple cars in a single shaft both vertically and horizontally with a much smaller footprint, substantial weight and mass reduction, and increased capacity.

The test tower is thyssenkrupp’s second. The first was completed in Germany, where the company is headquartered, last October.

 

thyssenkrupp's new elevator test tower in ChinaCourtesy thyssenkrupp.

Related Stories

Game Changers | Feb 5, 2016

Tesla: Battery storage is not just about electric vehicles

With his $5 billion, 13.6 million-sf Gigafactory, Tesla’s Elon Musk seeks to change the economics of battery energy storage, forever. 

Game Changers | Feb 4, 2016

GAME CHANGERS: 6 projects that rewrite the rules of commercial design and construction

BD+C’s inaugural Game Changers report highlights today’s pacesetting projects, from a prefab high-rise in China to a breakthrough research lab in the Midwest.

| Jan 14, 2016

How to succeed with EIFS: exterior insulation and finish systems

This AIA CES Discovery course discusses the six elements of an EIFS wall assembly; common EIFS failures and how to prevent them; and EIFS and sustainability.

Giants 400 | Sep 10, 2015

INDUSTRIAL SECTOR GIANTS: Stantec, Turner, Jacobs among top industrial AEC firms

BD+C's rankings of the nation's largest industrial sector design and construction firms, as reported in the 2015 Giants 300 Report

Industrial Facilities | Sep 3, 2015

DATA CENTER SECTOR GIANTS: Fluor, Gensler, Holder Construction among top data center AEC firms

BD+C's rankings of the nation's largest data center sector design and construction firms, as reported in the 2015 Giants 300 Report

Industrial Facilities | Aug 18, 2015

BIG crowdfunds steam ring prototype for Amager Bakke power plant project

The unusual power plant/ski slope project in Copenhagen will feature a smokestack that will release a ring-shaped puff for every ton of CO2 emitted.

Sponsored | Industrial Facilities | Aug 17, 2015

California wastewater agency wins with radiant technology

The Big Bear Area Regional Wstewater Agency tried several different methods to dry the sludge with only marginal success, so they decided to devise a new system that would be more effective, more efficient and would reduce the odor complaints.

Industrial Facilities | Aug 3, 2015

Architect Jacques Rougerie envisions floating city to function as roving laboratory

The manta ray-shaped vessel will be completely self-sustaining, run on marine energy, and produce no waste. 

Contractors | Jul 29, 2015

Consensus Construction Forecast: Double-digit growth expected for commercial sector in 2015, 2016

Despite the adverse weather conditions that curtailed design and construction activity in the first quarter of the year, the overall construction market has performed extremely well to date, according to AIA's latest Consensus Construction Forecast.

University Buildings | Jul 21, 2015

Maker spaces: Designing places to test, break, and rebuild

Gensler's Kenneth Fisher and Keller Roughton highlight recent maker space projects at MIT and the University of Nebraska that provide just the right mix of equipment, tools, spaces, and disciplines to spark innovation. 

boombox1
boombox2
native1

More In Category




Great Solutions

41 Great Solutions for architects, engineers, and contractors

AI ChatBots, ambient computing, floating MRIs, low-carbon cement, sunshine on demand, next-generation top-down construction. These and 35 other innovations make up our 2024 Great Solutions Report, which highlights fresh ideas and innovations from leading architecture, engineering, and construction firms.

halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021