flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Three-tiered, 57-story high-rise development from Arquitectonica coming to Miami

High-rise Construction

Three-tiered, 57-story high-rise development from Arquitectonica coming to Miami

The structure will be the tallest building in the Edgewater District


By David Malone, Associate Editor | July 12, 2016

Photo Courtesy or Arquitectonica via Arch Daily

With a Modernist appearance resembling the Olympic torch thanks to a three-tiered exterior structure and a floor plan that grows larger the higher up one goes, Elysee Residences is set to become the tallest structure in the Miami district of Edgewater.

The newly released design comes from the project’s architect, Arquitectonica, Arch Daily reports. Additionally, Jean-Louis Deniot and Two Roads Development are also part of the Building Team.

The structure’s three tiers are meant to divide the building into three vertical neighborhoods (which may be a bit of a disconcerting idea for anyone who read the 1975 British novel High-Rise or saw the recent movie adaptation) and will consist of 100 half- and full-floor luxury condominiums that include between three and five bedrooms. Each unit will have direct water views.

Construction is planned to begin at 700 NE 23rd St in Miami in the next few months with a target completion date in 2018.

Related Stories

Multifamily Housing | Apr 28, 2015

Mace and Make work on London's 40-story residential tower

The tower is one of six residential high-rises planned near London’s City Road, which is undergoing a mini construction boom.

High-rise Construction | Apr 23, 2015

Size matters in NYC, where several projects vie for the city’s tallest building honor

The latest renderings of 217 West 57th Street show a tower that would rise higher than the World Trade Center’s pinnacle, when elevations are included.

High-rise Construction | Apr 22, 2015

Architects propose sustainable ‘vertical city’ in the Sahara

Designers aim to make the 1,476-foot tower sustainable, relying on rainwater collection, solar power, and geothermal energy.

High-rise Construction | Apr 17, 2015

Construction begins on Goettsch Partners-designed Nanning China Resources Center Tower

The tower's design is derived from its multiple uses, which include 170,000 sm of Class A office space, 5,000 sm of boutique retail, and a 45,000-sm luxury Shangri-La hotel.

High-rise Construction | Apr 16, 2015

Construction begins on Seattle's Tibet-inspired Potala Tower

Construction on the 41-story Potala Tower in Seattle finally kicked off following a ground-breaking ceremony seven months ago.

High-rise Construction | Apr 6, 2015

Melbourne tower will light up depending on weather

The tower will be illuminated by 164-foot-tall beams of LED light based on weather updates from the Bureau of Meteorology. 

Multifamily Housing | Mar 31, 2015

Plans for a new condo tower in New York create a ‘communal ecosystem’ for residents

The conceptual plans for a 700-foot-tall, 65-story condominium tower in New York City were unveiled in early March by its architect, Perkins+Will.

High-rise Construction | Mar 24, 2015

Timber high-rise residential complex will tower over Stockholm waterfront

The four towers, 20 stories each, will be made entirely out of Swedish pine, from frame to façade.

Healthcare Facilities | Mar 23, 2015

Can advanced elevator technology take vertical hospitals to the next level?

VOA's Douglas King recalls the Odyssey project and ponders vertical transportation in high-rise healthcare design.

High-rise Construction | Mar 16, 2015

NBBJ creates 'shadowless' skyscraper concept for proposed UK development

A team of architects from the London branch of NBBJ used computer algorithms to generate a dual-tower design that maximizes sunlight reflections to eliminate the buildings' shadows. 

boombox1
boombox2
native1

More In Category




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021