flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Three new members elected to AISC Board of Directors

Three new members elected to AISC Board of Directors

New members will immediately begin serving on the AISC Board of Directors, assisting with the organization's planning and leadership in the steel construction industry.


By Posted by Tim Gregorski, Senior Editor | October 15, 2012

The American Institute of Steel Construction (AISC) announced the election of three new members to its Board of Directors at its recent Annual Meeting in Miami. Robert Philip Stupp, Jr., executive vice president of Stupp Bros., Inc., St. Louis, Lawrence F. Kruth, P.E., vice president of engineering, technology and safety at Douglas Steel Fabricating Corporation, Lansing, Mich., and Mark W. Trimble, P.E., marketing manager at Huntington Steel & Supply Company, Huntington, W.Va., will immediately begin serving on the AISC Board of Directors, assisting with the organization's planning and leadership in the steel construction industry.

Stupp currently serves as executive vice president of Stupp Bros., Inc., St. Louis, and is also president of its fabrication segment and subsidiary Hammert's Iron Works, Inc.  Previously, he served for three years as assistant general manager for Stupp's bridge division, Stupp Bridge Company, and before that was vice president for more than a decade when it was named Stupp Bros. Bridge & Iron Co. For the past nine years, he's served as director of the Central Fabricators Association in Chicago and is also a member of AISC's Ad Hoc Committee on Barcode Standards. His father is Robert (Bob) P. Stupp, a former AISC chairman of the board and the longest-serving board member in AISC's history. AISC's prestigious Robert P. Stupp Award for Leadership Excellence was created in 1998 in his honor in recognition of his unparalleled leadership in the steel construction industry.

Kruth is vice president of engineering, technology and safety at Douglas Steel Fabricating Corporation, Lansing, Mich., and a member of its Board of Directors. With more than 30 years of structural engineering experience, he's responsible for managing the engineering department, advancing technology in the company as well as all safety for the shop and field. Previously, he served for seven years as a project manager for the company. He serves as Chair of the AISC Safety Committee and is a member of the AISC Research Committee. He's also a member of AISC's TC6 Connection Design Specification Committee, AISC's TC13 Quality Control & Assurance Specification Committee as well as a member of the AISC Specification Committee. He's been appointed to the MIOSHA Part 26, Structural Steel Erection Advisory Committee and MIOSHA Part 10, Lifting & Digging Advisory Committee.

Trimble is marketing manager for Huntington Steel & Supply Company, Huntington, W.Va., and one of six executive team members charged with business development and client satisfaction. He's been with the company for about 20 years and started out as manager of its structural fabrication division. Previously, he owned and managed an engineering and surveying practice in Kentucky. He's a past president of both the West Virginia Steel Fabricators Association and West Virginia Society of Professional Engineers. Currently he's a member of AISC's Planning Committee for NASCC: The Steel Conference. +

Related Stories

| Nov 1, 2010

Vancouver’s former Olympic Village shoots for Gold

The first tenants of the Millennium Water development in Vancouver, B.C., were Olympic athletes competing in the 2010 Winter Games. Now the former Olympic Village, located on a 17-acre brownfield site, is being transformed into a residential neighborhood targeting LEED ND Gold. The buildings are expected to consume 30-70% less energy than comparable structures.

| Oct 27, 2010

Grid-neutral education complex to serve students, community

MVE Institutional designed the Downtown Educational Complex in Oakland, Calif., to serve as an educational facility, community center, and grid-neutral green building. The 123,000-sf complex, now under construction on a 5.5-acre site in the city’s Lake Merritt neighborhood, will be built in two phases, the first expected to be completed in spring 2012 and the second in fall 2014.

| Oct 21, 2010

GSA confirms new LEED Gold requirement

The General Services Administration has increased its sustainability requirements and now mandates LEED Gold for its projects.

| Oct 18, 2010

World’s first zero-carbon city on track in Abu Dhabi

Masdar City, the world’s only zero-carbon city, is on track to be built in Abu Dhabi, with completion expected as early as 2020. Foster + Partners developed the $22 billion city’s master plan, with Adrian Smith + Gordon Gill Architecture, Aedas, and Lava Architects designing buildings for the project’s first phase, which is on track to be ready for occupancy by 2015.

| Oct 13, 2010

Editorial

The AEC industry shares a widespread obsession with the new. New is fresh. New is youthful. New is cool. But “old” or “slightly used” can be financially profitable and professionally rewarding, too.

| Oct 13, 2010

Test run on the HP Z200 SFF Good Value in a Small Package

Contributing Editor Jeff Yoders tests a new small-form factor, workstation-class desktop in Hewlett-Packard’s line that combines performance of its minitower machine with a smaller chassis and a lower price.

| Oct 13, 2010

Prefab Trailblazer

The $137 million, 12-story, 500,000-sf Miami Valley Hospital cardiac center, Dayton, Ohio, is the first major hospital project in the U.S. to have made extensive use of prefabricated components in its design and construction.

| Oct 13, 2010

Thought Leader

Sundra L. Ryce, President and CEO of SLR Contracting & Service Company, Buffalo, N.Y., talks about her firm’s success in new construction, renovation, CM, and design-build projects for the Navy, Air Force, and Buffalo Public Schools.

| Oct 13, 2010

Hospital tower gets modern makeover

The Wellmont Holston Valley Medical Center in Kingsport, Tenn., expanded its D unit, a project that includes a 243,443-sf addition with a 12-room operating suite, a 36-bed intensive care unit, and an enlarged emergency department.

boombox1
boombox2
native1

More In Category

Healthcare Facilities

Watch on-demand: Key Trends in the Healthcare Facilities Market for 2024-2025

Join the Building Design+Construction editorial team for this on-demand webinar on key trends, innovations, and opportunities in the $65 billion U.S. healthcare buildings market. A panel of healthcare design and construction experts present their latest projects, trends, innovations, opportunities, and data/research on key healthcare facilities sub-sectors. A 2024-2025 U.S. healthcare facilities market outlook is also presented.




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021