The American Institute of Steel Construction (AISC) announced the election of three new members to its Board of Directors at its recent Annual Meeting in Miami. Robert Philip Stupp, Jr., executive vice president of Stupp Bros., Inc., St. Louis, Lawrence F. Kruth, P.E., vice president of engineering, technology and safety at Douglas Steel Fabricating Corporation, Lansing, Mich., and Mark W. Trimble, P.E., marketing manager at Huntington Steel & Supply Company, Huntington, W.Va., will immediately begin serving on the AISC Board of Directors, assisting with the organization's planning and leadership in the steel construction industry.
Stupp currently serves as executive vice president of Stupp Bros., Inc., St. Louis, and is also president of its fabrication segment and subsidiary Hammert's Iron Works, Inc. Previously, he served for three years as assistant general manager for Stupp's bridge division, Stupp Bridge Company, and before that was vice president for more than a decade when it was named Stupp Bros. Bridge & Iron Co. For the past nine years, he's served as director of the Central Fabricators Association in Chicago and is also a member of AISC's Ad Hoc Committee on Barcode Standards. His father is Robert (Bob) P. Stupp, a former AISC chairman of the board and the longest-serving board member in AISC's history. AISC's prestigious Robert P. Stupp Award for Leadership Excellence was created in 1998 in his honor in recognition of his unparalleled leadership in the steel construction industry.
Kruth is vice president of engineering, technology and safety at Douglas Steel Fabricating Corporation, Lansing, Mich., and a member of its Board of Directors. With more than 30 years of structural engineering experience, he's responsible for managing the engineering department, advancing technology in the company as well as all safety for the shop and field. Previously, he served for seven years as a project manager for the company. He serves as Chair of the AISC Safety Committee and is a member of the AISC Research Committee. He's also a member of AISC's TC6 Connection Design Specification Committee, AISC's TC13 Quality Control & Assurance Specification Committee as well as a member of the AISC Specification Committee. He's been appointed to the MIOSHA Part 26, Structural Steel Erection Advisory Committee and MIOSHA Part 10, Lifting & Digging Advisory Committee.
Trimble is marketing manager for Huntington Steel & Supply Company, Huntington, W.Va., and one of six executive team members charged with business development and client satisfaction. He's been with the company for about 20 years and started out as manager of its structural fabrication division. Previously, he owned and managed an engineering and surveying practice in Kentucky. He's a past president of both the West Virginia Steel Fabricators Association and West Virginia Society of Professional Engineers. Currently he's a member of AISC's Planning Committee for NASCC: The Steel Conference. +
Related Stories
Architects | Apr 22, 2015
Architecture Billings Index accelerates in March
For the second consecutive month, the Architecture Billings Index indicated a modest increase in design activity in March.
Green | Apr 22, 2015
AIA Committee on the Environment recognizes Top 10 Green Projects
Seattle's Bullitt Center and the University Center at The New School are among AIA's top 10 green buildings for 2015.
Museums | Apr 22, 2015
Check out Ralph Johnson's stunning nature-inspired Shanghai museum
The newly opened Shanghai Natural History Museum, designed by Perkins+Will’s Global Design Director Ralph Johnson, mimics the shape of a nautilus shell, and features natural elements throughout.
Green | Apr 22, 2015
GSA's Federal Center South Building honored with AIA Top Ten Plus Award for 'verified' sustainable performance
The annual award recognizes green building projects that have quantifiable metrics demonstrating the performance and positive impact of the sustainable design.
Architects | Apr 21, 2015
Megatrends shaping commercial building design
Gensler’s 2015 Design Forecast focuses on how changes in demographics, workplace preferences, and technology are affecting how and why structures get built.
Office Buildings | Apr 21, 2015
Stop the endless debate over open vs. closed work environments
Rather than be confused by the constant stream of opinions, leadership teams contemplating workplace investments should start with powerful employee engagement strategies that drive results.
BIM and Information Technology | Apr 21, 2015
Software tools shouldn't dictate the AEC process
With over 200 solutions on the market, construction software is one of the most complex and fragmented markets, writes Gensler's Mark Thole.
Cultural Facilities | Apr 20, 2015
Jean Nouvel loses court battle against Philharmonie de Paris over alleged design ‘sabotage’
Nouvel boycotted the January opening of the facility and asked for his name to be removed from all references to the work.
Contractors | Apr 20, 2015
Too many construction projects don’t meet owners’ expectations: KPMG report
Causes for delays, overruns, and underperformance include project management talent shortages, distrust between owners and contractors, and the lack of fully integrated project management systems.
High-rise Construction | Apr 17, 2015
Construction begins on Goettsch Partners-designed Nanning China Resources Center Tower
The tower's design is derived from its multiple uses, which include 170,000 sm of Class A office space, 5,000 sm of boutique retail, and a 45,000-sm luxury Shangri-La hotel.