flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Three AEC firms launch a mass timber product for quicker school construction

Wood

Three AEC firms launch a mass timber product for quicker school construction

TimberQuest brand seeks to avoid overinvestment in production that has plagued other CLT providers.


By John Caulfield, Senior Editor | June 10, 2021
Exterior rendering of mass-timber TimberQuest school building

TimberQuest, which uses prefabricated mass timber components, can significantly reduce a project's design and construction periods. Images: Courtesy of XL Construction

The website expertmarketresearch.com estimates that the value of the global cross-laminated timber market hit $779 million in 2020, and is expected to grow annually by 13% to $1.624 billion in 2026.

As demand for mass timber increases, branding is beginning to emerge. One example is TimberQuest, an advanced prefabricated school construction product for the California educational market, which was recently launched by three Bay Area AEC firms: Milpitas-based XL Construction, San Jose-based Aedis Architects, and Saratoga-based Daedalus Structural Engineering.

The trio’s first project using its product is a new 4,000-sf building for kindergarten students with four 1,000-sf classrooms, each with its own restroom, for Sacred Heart Schools in Atherton, Calif., whose 63-acre campus and K-12 curriculum serve more than 800 families. The school greenlighted this project—which is believed to be the first of its kind in the nation—on April 1, and the mass timber components were fabricated and delivered to the construction site by June 1. The building team is targeting an August 31 completion date, in time for the fall semester.

“Two of the things we liked most about the TimberQuest classroom design is the ‘daylighting’ created by the structure’s large windows combined with the exposed wood interior that makes the classroom very pleasant and appealing,” says Michael Dwyer, Sacred Heart Schools’ director of operations. “The building’s overall energy efficiency supports our sustainability philosophy and stands as a shining example of these values we teach to our students.”

Also see: A fly-through video rendering of a TimberQuest classroom

 

A FLEXIBLE PRODUCTION APPROACH TO MASS TIMBER CONSTRUCTION

Interior rendering of TimberQuest classroom
TimberQuest buildings are available in three-to-nine classroom sizes, and are designed to let in lots of natural light.

 

Matt Larson, XL Construction’s preconstruction director, tells BD+C that his firm and Aedis had worked together previously. “We also knew that we needed a structural expert on both mass timber and California codes. Daedalus [has] local expertise, and has partnered with Fast + Epp, a leading expert on mass timber, to provide both expertise under one roof. XL, Aedis and Daedalus have a core commitment to sustainability and innovation, which are at the heart of TimberQuest.”

Larson went on to explain TimberQuest’s approach to fabrication. For higher-tech items that require expensive machining (such as the mass timber components, the HVAC system, and the glazing system), the building team partners with local suppliers with existing plants. For lower-tech parts of panel fabrication, “there is no requirement for a large plant or expensive tooling,” says Larson. To fabricate walls and roofs, flexible approaches can include “popup” factories in temporary facilities, and using XL’s shop/yard. Fabricating onsite is also an option.

“We feel that this approach will help us avoid a common failure point for this type of venture, namely the overinvestment in facilities and tooling and lack of ability to quickly scale up or down,” says Larson.

 

FEWER DESIGN DAYS AND ONSITE TRADES

Several factors contribute to TimberQuest’s production speed. These include pre-made design for manufacturing and assembly, and the reduction in the number of trades needed for a project. Larson says that the building team has winnowed the design process—normally 6-12 months—to 6-8 weeks; and has cut the number of trades onsite—typically between 20 and 30—to around 10. “And we hope to reduce it further in the future,” he says.

TimberQuest buildings are available in three- to nine-classroom sizes, between 3,000 and 9,000 sf. A total of nine interior layouts are included in the precheck design, including standard classroom, large classroom, breakout space, office/conference, science, kindergarten and three restroom configurations. The all-electric design utilizes heat pump technology to exceed California’s Title 24 energy usage standards by between 35% and 60%. TimberQuest buildings seek to take full advantage of renewable energy resources.

Related Stories

Wood | Mar 28, 2016

Waugh Thistleton designs one of the tallest timber office buildings in London

The nine-story Development House has vertical open spaces for light and air flow.  

Wood | Mar 23, 2016

APA updates Engineered Wood Construction Guide

Provides recommendations on engineered wood construction systems.

Wood | Feb 8, 2016

BEST IN WOOD: WoodWorks announces 2016 design award winners

The Aspen Art Museum, Scott Family Amazeum, and Whitetail Woods Regional Park Camper Cabins are among the projects honored by this year’s awards.

Wood | Feb 3, 2016

American Wood Council releases guide to wood construction in high wind areas

The guide is directed toward ensuring structural integrity to resist wind loads.

Wood | Jan 4, 2016

Concerns over new wood-frame, mid-rise residential building construction in Charlotte

Cheaper construction material may increase risk for firefighters.

Sponsored | Wood | Dec 7, 2015

Compelling conversations about wood: Engineered wood as expressive design

This installment features a wide-ranging discussion that reveals how a mix of engineered wood products lend themselves to expressive design — and what’s blocking today’s designers from fully embracing this aesthetic.

Wood | Nov 24, 2015

2015 Code Conforming Wood Design publication now available

Summarizes provisions in the 2015 International Building Code.

Sponsored | | Nov 20, 2015

Schooling the visitor

Exposed glulam and other engineered wood products help WSU tell its technology story

Architects | Oct 20, 2015

Four building material innovations from the Chicago Architecture Biennial

From lightweight wooden pallets to the largest lengths of CLT-slabs that can be shipped across North America

Multifamily Housing | Oct 15, 2015

Montreal apartment is world’s largest residential cross-laminated timber project

 Its 434 condo, townhouse, and rental units in three eight-story buildings are made from sustainably harvested wood turned into panels by Canadian company Nordic Wood Structures together with the Cree Nation in Chibougamau.

boombox1
boombox2
native1

More In Category


Mass Timber

British Columbia hospital features mass timber community hall

The Cowichan District Hospital Replacement Project in Duncan, British Columbia, features an expansive community hall featuring mass timber construction. The hall, designed to promote social interaction and connection to give patients, families, and staff a warm and welcoming environment, connects a Diagnostic and Treatment (“D&T”) Block and Inpatient Tower.



halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021