BD+C: You’re a second-generation contractor, aren’t you?
Sundra L. Ryce: My dad is 66, and he’s owned W.C. Roberson Plumbing and Construction Corp. here in Buffalo for over 30 years. I started working for him as a teenager, learning basic business practices, especially about integrity. He taught me that if you say you’re going to do something, do it. He also had a very diverse company, and that has translated into our business. He’s my number one mentor.
BD+C: Right from the start, in 1996, you made a conscious decision to go into the commercial sector. Why?
SLR: I had a vision of growth, and I wanted to position the company to become a medium-size or larger firm. That’s the path we’ve taken. To date, our largest project, which is in excess of $16 million, is with the New York State Power Authority. So we are fulfilling our vision.
BD+C: How’s business?
SLR: We employ about 30 people, with revenues expected to exceed more than $25 million this year. About 10-15% of our work is CM, 20% is design-build, but our mainstay is general construction. We’ve been doing work for the Federal government for the last 12 years. We have worked with the Army Corps of Engineers, building their Military Entrance Processing Station at the Niagara Falls Air Reserve Station, and, more recently, a renovation project for the Navy, in Erie, Pa. As far as design-build work goes, we see the Federal government moving more into that arena as well. They want you to bring the team to them and deliver the whole project—one-stop shopping.
BD+C: Your firm qualifies doubly as an MWBE, a business owned by a minority member or woman. Which is better for business, the M or the W?
SLR: The M helps me more, because in a lot of the projects, with the hiring goals that are set, there’s a greater capacity for minorities; for example, it may be 25% minority-owned, vs. 7% for woman-owned. Do I use it? Yes, especially for bidding on the larger projects. Fortunately, we have earned an excellent reputation for providing exceptional general construction services over the years. That is what we lead with when presenting ourselves, while highlighting that we are an MWBE after that.
BD+C: Your company is part of a consortium that’s doing $1 billion of work for the Buffalo Public Schools. What have you learned from that experience?
SLR: When you’re working with government entities, it’s really important to have a highly trained team with the skill sets to deal with the bureaucracy on all levels. Most agencies are meticulous about their paperwork, and that has been a stumbling block for many small or medium-size firms. At SLR Contracting, we quickly learned how to satisfy those requirements by providing all the appropriate documents necessary to complete those kinds of projects.
BD+C: During a recent radio interview you said you thought you were seeing light at the end of the economic tunnel. Enlighten us!
SLR: One of the things that has given us hope as a company is that in western New York, we are seeing projects come back to life. In Buffalo, the city is redeveloping the Erie Canal and the harbor, a $75 million project. And when you talk to the bankers, and looking at business trends, there is a small amount of growth. It’s a light, not a total recovery.
BD+C: You participated in a public forum in which you asked a question of President Obama. What did you ask him?
SLR: My question was about how to successfully run a small business. I specifically asked about the education programs offered to small business owners and how they should effectively negotiate contracts. I wanted to know what his administration is doing to implement new educational practices which support small business enterprises.
BD+C: And what did he say?
SLR: He answered for eight minutes. [Laughs.] He said they are looking at going into colleges and high schools to implement programs for entrepreneurial degrees, so that when people get to the point where they’re able to start a business, they have the tools.
BD+C: Are you feeling pressure from larger firms coming into your turf?
SLR: It’s kind of flipped around for us. Because of our growth, we’re moving into other markets, and it’s been a surprise to some businesses in those areas. For example, with the Erie Canal Harbor Development project, a larger firm [Hunt Construction] actually asked us to partner with them, and it’s been a great relationship for both of us.
BD+C: What’s your toughest challenge?
SLR: Balancing the opportunities that come to us. Once you get a name as a good contractor, you have to be really selective, to be fiscally responsible, to deliver those projects, get rave reviews and repeat customers. You’d love to take all the jobs, but you can’t. We want to grow smart instead of just growing fast.
Related Stories
| Jul 7, 2014
Nothing fixes a bad manager
Companies seem to try everything imaginable to fix their workplaces, says Gallup Chairman and CEO Jim Clifton in a recent blog post, except the only thing that matters: naming the right person manager. SPONSORED CONTENT
| Jul 3, 2014
Gehry edits Canadian skyscraper plan to be 'more Toronto'
After being criticized for the original tower complex, architect Frank Gehry unveils a new design that is more subtle, and "more Toronto."
| Jul 2, 2014
First Look: Qatar World Cup stadium design references nomadic heritage
Organizers of the Qatar 2022 World Cup, the Supreme Committee for Delivery and Legacy, recently unveiled designs for the second stadium.
| Jul 2, 2014
SHoP designs what would be Brooklyn's tallest building
JDS Development partners with SHoP to construct a 70-story building at 775-feet tall, unprecedented for downtown Brooklyn.
| Jul 2, 2014
The doctor is in the firehouse: New clinic to be built in California fire station
Designed by WRNS Studio, the Firehouse Clinic will encourage local residents with limited healthcare access to consider them as an alternative to the emergency room, especially for preventive care.
| Jul 2, 2014
Emerging trends in commercial flooring
Rectangular tiles, digital graphic applications, the resurgence of terrazzo, and product transparency headline today’s commercial flooring trends.
| Jul 2, 2014
Grimshaw's 'kit of parts' design scheme selected for Qatar sports facilities program
The series of projects, called the Al Farjan Recreational Sports Facilities, have been designed in such a way that the same basic design can be adapted to the specific requirements of each site.
| Jul 1, 2014
Peter Zumthor's LA art museum plan modified with bridge-like section across main thoroughfare
After his design drew concerns about potential damage to LA's La Brea Tar Pits, Peter Zumthor has dramatically revised his concept for the Los Angeles Museum of Art.
| Jul 1, 2014
China's wild circular skyscraper opens in Guangzhou [slideshow]
The 33-story Guanghzou Circle takes the shape of a giant ribbon spool, with the floor space housed in a series of boxes suspended between two massive "wheels."
| Jul 1, 2014
Hyper-speed rendering: How Gensler turns BIM models into beauty shots in seconds
In search of a fast rendering solution, Gensler looked to the gaming and moviemaking industries for the next breakthrough tool: Octane Render.