flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Thornton Tomasetti/Fore Solutions provides consulting for renovation at Tufts School of Dental Medicine

Thornton Tomasetti/Fore Solutions provides consulting for renovation at Tufts School of Dental Medicine

Project receives LEED Gold certification.


By Posted by Tim Gregorski, Senior Editor | June 8, 2012
The Tufts School of Dental Medicine developed a multi-year, multi-phase master p
The Tufts School of Dental Medicine developed a multi-year, multi-phase master plan to promote sustainability and positive envir

Thornton Tomasetti recently announces that the Level 2 Renovation at Tufts University's School of Dental Medicine has received LEED Gold Certification. Fore Solutions, the green building consulting company acquired by Thornton Tomasetti in 2012, provided LEED consulting services for the project at the university’s Boston, Mass., campus. 

Fore Solutions was hired by the project architect, ARC/Architectural Resources Cambridge, to provide LEED consulting. In this role, Fore Solutions reviewed the energy model; tracked compliance with LEED throughout design and construction; and reviewed and submitted LEED documentation to the Green Building Certification Institute.

The Tufts School of Dental Medicine developed a multi-year, multi-phase master plan to promote sustainability and positive environmental initiatives. Phase 1 of the project included a five-story, 95,000-sf vertical expansion to the existing building. This allowed for the expansion of patient clinics, classrooms and offices, as well as continuing education and research facilities.

The second installment in the master project was the Level 2 Renovation, initiated to house part of the pre-doctoral teaching program along with an emergency clinic. The second floor has been redesigned within the existing building to accommodate clinic and patient functions in the east wing, and academic offices in the west. The Level 2 Renovation was designed to meet sustainability goals in several categories. +

Related Stories

| Sep 13, 2010

Second Time Around

A Building Team preserves the historic facade of a Broadway theater en route to creating the first green playhouse on the Great White Way.

| Sep 13, 2010

Palos Community Hospital plans upgrades, expansion

A laboratory, pharmacy, critical care unit, perioperative services, and 192 new patient beds are part of Palos (Ill.) Community Hospital's 617,500-sf expansion and renovation.

| Sep 13, 2010

China's largest single-phase hospital planned for Shanghai

RTKL's Los Angles office is designing the Shanghai Changzheng New Pudong Hospital, which will be the largest new hospital built in China in a single phase.

| Sep 13, 2010

Richmond living/learning complex targets LEED Silver

The 162,000-sf living/learning complex includes a residence hall with 122 units for 459 students with a study center on the ground level and communal and study spaces on each of the residential levels. The project is targeting LEED Silver.

| Sep 13, 2010

World's busiest land port also to be its greenest

A larger, more efficient, and supergreen border crossing facility is planned for the San Ysidro (Calif.) Port of Entry to better handle the more than 100,000 people who cross the U.S.-Mexico border there each day.

| Sep 13, 2010

Triple-LEED for Engineering Firm's HQ

With more than 250 LEED projects in the works, Enermodal Engineering is Canada's most prolific green building consulting firm. In 2007, with the firm outgrowing its home office in Kitchener, Ont., the decision was made go all out with a new green building. The goal: triple Platinum for New Construction, Commercial Interiors, and Existing Buildings: O&M.

| Sep 13, 2010

Stadium Scores Big with Cowboys' Fans

Jerry Jones, controversial billionaire owner of the Dallas Cowboys, wanted the team's new stadium in Arlington, Texas, to really amp up the fan experience. The organization spent $1.2 billion building a massive three-million-sf arena that seats 80,000 (with room for another 20,000) and has more than 300 private suites, some at field level-a first for an NFL stadium.

| Sep 13, 2010

'A Model for the Entire Industry'

How a university and its Building Team forged a relationship with 'the toughest building authority in the country' to bring a replacement hospital in early and under budget.

boombox1
boombox2
native1

More In Category

Great Solutions

41 Great Solutions for architects, engineers, and contractors

AI ChatBots, ambient computing, floating MRIs, low-carbon cement, sunshine on demand, next-generation top-down construction. These and 35 other innovations make up our 2024 Great Solutions Report, which highlights fresh ideas and innovations from leading architecture, engineering, and construction firms.




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021