flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Thornton Tomasetti appoints Hofmeister and Zhu to board of directors

Thornton Tomasetti appoints Hofmeister and Zhu to board of directors

The addition of Hofmeister and Zhu brings the number of directors to 10.


By Posted by Tim Gregorski, Senior Editor | June 25, 2012

International engineering firm Thornton Tomasetti announced that Kansas City Senior Principal W. Steven Hofmeister, P.E., S.E., LEED AP and Shanghai Senior Principal Yi Zhu have been elected to one-year terms on the firm’s board of directors. The addition of Hofmeister and Zhu brings the number of directors to 10.

Hofmeister manages the firm’s Midwest U.S region, overseeing the Kansas City, Chicago and Denver offices. He has more than 25 years of structural design and project management experience. He has been with Thornton Tomasetti since 2004 and has worked on such high-profile projects as MetLife Stadium in East Rutherford, N.J., Yankee Stadium in Bronx, N.Y., CONSOL Energy Center in Pittsburgh, Pa. and Bank of Oklahoma Center in Tulsa.

Zhu oversees the firm’s operations in China and helped to establish the Shanghai office in 2002. He has more than 24 years of experience in design, construction and seismic research of structures worldwide. He joined Thornton Tomasetti in 1994. His notable projects include Petronas Twin Towers in Kuala Lumpur, Malaysia; Taipei 101 in Taiwan and Shanghai Tower in China. +

Related Stories

| Nov 15, 2011

Suffolk Construction breaks ground on the Victor housing development in Boston

Project team to manage construction of $92 million, 377,000 square-foot residential tower.

| Nov 15, 2011

Miller joins Perkins Eastman as regional manager, Middle East and Northern Africa

Miller joins Perkins Eastman with more than 48 years of experience in architecture, design management, and construction administration for planning and infrastructure.

| Nov 14, 2011

Summit Design+Build selected at GC for new Office Concepts headquarters

The new headquarters will include 17,000 sf of office space and 15,000 sf of warehouse and feature 24 ft ceilings, an open floor plan, two conference rooms and one training room and will feature sustainable finishes throughout. 

| Nov 14, 2011

Griffin Electric completes electrical work at Cary Arts Center

  The Griffin Electric team was responsible for replacing the previous electrical service on-site with a 1000A, 480/277V service and providing electrical feeds for a new fire pump chiller, six air-handlers and two elevators.

| Nov 14, 2011

303 East 33rd Street building achieves LEED-NC

  The 165,000 sf 12-story residential building is the first green development to be LEED certified in the Murray Hill neighborhood of Manhattan.

| Nov 14, 2011

VanSumeren appointed to Traco general manager

VanSumeren will draw on his more than 20 years of experience in manufacturing management and engineering to deliver operational and service excellence and drive profitable growth for Traco. 

| Nov 11, 2011

By the Numbers

What do ‘46.9,’ ‘886.2,’ and ‘171,271’ mean to you? Check here for the answer.

| Nov 11, 2011

Streamline Design-build with BIM

How construction manager Barton Malow utilized BIM and design-build to deliver a quick turnaround for Georgia Tech’s new practice facility.

boombox1
boombox2
native1

More In Category



Urban Planning

The magic of L.A.’s Melrose Mile

Great streets are generally not initially curated or willed into being. Rather, they emerge organically from unintentional synergies of commercial, business, cultural and economic drivers. L.A.’s Melrose Avenue is a prime example. 


Curtain Wall

7 steps to investigating curtain wall leaks

It is common for significant curtain wall leakage to involve multiple variables. Therefore, a comprehensive multi-faceted investigation is required to determine the origin of leakage, according to building enclosure consultants Richard Aeck and John A. Rudisill with Rimkus. 

halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021