flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Thornton Tomasetti appoints Hofmeister and Zhu to board of directors

Thornton Tomasetti appoints Hofmeister and Zhu to board of directors

The addition of Hofmeister and Zhu brings the number of directors to 10.


By Posted by Tim Gregorski, Senior Editor | June 25, 2012

International engineering firm Thornton Tomasetti announced that Kansas City Senior Principal W. Steven Hofmeister, P.E., S.E., LEED AP and Shanghai Senior Principal Yi Zhu have been elected to one-year terms on the firm’s board of directors. The addition of Hofmeister and Zhu brings the number of directors to 10.

Hofmeister manages the firm’s Midwest U.S region, overseeing the Kansas City, Chicago and Denver offices. He has more than 25 years of structural design and project management experience. He has been with Thornton Tomasetti since 2004 and has worked on such high-profile projects as MetLife Stadium in East Rutherford, N.J., Yankee Stadium in Bronx, N.Y., CONSOL Energy Center in Pittsburgh, Pa. and Bank of Oklahoma Center in Tulsa.

Zhu oversees the firm’s operations in China and helped to establish the Shanghai office in 2002. He has more than 24 years of experience in design, construction and seismic research of structures worldwide. He joined Thornton Tomasetti in 1994. His notable projects include Petronas Twin Towers in Kuala Lumpur, Malaysia; Taipei 101 in Taiwan and Shanghai Tower in China. +

Related Stories

| May 31, 2012

2011 Reconstruction Award Profile: Seegers Student Union at Muhlenberg College

Seegers Student Union at Muhlenberg College has been reconstructed to serve as the core of social life on campus.

| May 31, 2012

2011 Reconstruction Awards Profile: Ka Makani Community Center

An abandoned historic structure gains a new life as the focal point of a legendary military district in Hawaii.

| May 31, 2012

5 military construction trends

Defense spending may be down somewhat, but there’s still plenty of project dollars out there if you know where to look.

| May 31, 2012

New School’s University Center in NYC topped out

16-story will provide new focal point for campus.

| May 31, 2012

Day & Zimmermann taps Jobe for ECM VP

Ken Jobe, a senior executive with 30+ years of industry-related experience, joins Day & Zimmermann to expand footprint in the process & industrial markets.

| May 31, 2012

Perkins+Will-designed engineering building at University of Buffalo opens

Clad in glass and copper-colored panels, the three-story building thrusts outward from the core of the campus to establish a new identity for the School of Engineering and Applied Sciences and the campus at large.

| May 30, 2012

Construction milestone reached for $1B expansion of San Diego International Airport

Components of the $9-million structural concrete construction phase included a 700-foot-long, below-grade baggage-handling tunnel; metal decks covered in poured-in-place concrete; slab-on-grade for the new terminal; and 10 exterior architectural columns––each 56-feet tall and erected at a 14-degree angle.

| May 30, 2012

Pringle Brandon in discussions to join forces with Perkins+Will

The London offices would be known as Pringle Brandon Perkins+Will.

| May 30, 2012

Boral Bricks announces winners of “Live.Work.Learn” student architecture contest

Eun Grace Ko, a student at the Ryerson University in Toronto, Canada, named winner of annual contest.

boombox1
boombox2
native1

More In Category

Warehouses

California bill would limit where distribution centers can be built

A bill that passed the California legislature would limit where distribution centers can be located and impose other rules aimed at reducing air pollution and traffic. Assembly Bill 98 would tighten building standards for new warehouses and ban heavy diesel truck traffic next to sensitive sites including homes, schools, parks and nursing homes.




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021