flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Thornton Tomasetti announces four promotions in Chicago office

Thornton Tomasetti announces four promotions in Chicago office

Promotions in Thornton Tomasetti office key on industy veterans.


By Posted by Tim Gregorski, Senior Editor | July 31, 2012
This article first appeared in the September 2012 issue of BD+C.

The Thornton Tomasetti Board of Directors and Managing Principals announce the promotion of Thomas D. Poulos, P.E., S.E., to senior principal, and Edward M. Peck, AIA, LEED AP, Robert M. Stadler, P.E., S.E., and Adam Abbes Yala, Ph.D., P.E., to vice presidents in the Chicago office of the international engineering firm.

Poulos, who leads the firm’s aviation market sector, has been with Thornton Tomasetti since 1997. He has more than 20 years of experience leading complex projects for all types of structures, including design-build.

Peck, the leader of Thornton Tomasetti’s Midwest U.S. Building Skin practice, has been with the firm since 2008. He has more than 15 years of experience in architecture, building skin technologies, and building systems. Throughout his career, he has specialized in projects involving sustainable and innovative building skins, most notably ETFE (ethylene tetrafluoroethylene). He has provided building skin services for a wide range of building types including hospitals, performing arts venues, office buildings, and sports and entertainment facilities.

Stadler joined Thornton Tomasetti in 1998 and has broad exposure to projects of all sizes, from tenant build-outs to high-rise buildings and long-span structures. His work spans several market sectors, including residential, commercial, healthcare, aviation, cultural, educational, and sports facilities. He specializes in economical structural solutions using all types of building materials and has experience in building design in high seismic regions

Dr. Yala joined Thornton Tomasetti in 1999. He has provided structural design and analysis services from schematic design through construction administration for many major projects, including office, residential, hospitality, aviation, and sports facilities as well as special structures. He is also well-versed in building renovations and restorations, façade repairs, investigations, evaluations, condition assessment and litigation support. +

Related Stories

| May 18, 2011

Eco-friendly San Antonio school combines history and sustainability

The 113,000-sf Rolling Meadows Elementary School in San Antonio is the Judson Independent School District’s first sustainable facility, with green features such as vented roofs for rainwater collection and regionally sourced materials.

| May 18, 2011

New Reform Jewish Independent school opens outside Boston

The Rashi School, one of only 17 Reform Jewish independent schools in North American and Israel, opened a new $30 million facility on a 166-acre campus shared with the Hebrew SeniorLife community on the Charles River in Dedham, Mass.

| May 18, 2011

Design diversity celebrated at Orange County club

The Orange County, Calif., firm NKDDI designed the 22,000-sf Luna Lounge & Nightclub in Pomona, Calif., to be a high-end multipurpose event space that can transition from restaurant to lounge to nightclub to music venue.

| May 18, 2011

Lab personnel find comfort in former Winchester gun factory

The former Winchester Repeating Arms Factory in New Haven, Conn., is the new home of PepsiCo’s Biology Innovation Research Laboratory.

| May 18, 2011

Addition provides new school for pre-K and special-needs kids outside Chicago

Perkins+Will, Chicago, designed the Early Learning Center, a $9 million, 37,000-sf addition to Barrington Middle School in Barrington, Ill., to create an easily accessible and safe learning environment for pre-kindergarten and special-needs students.

| May 18, 2011

Raphael Viñoly’s serpentine-shaped building snakes up San Francisco hillside

The hillside location for the Ray and Dagmar Dolby Regeneration Medicine building at the University of California, San Francisco, presented a challenge to the Building Team of Raphael Viñoly, SmithGroup, DPR Construction, and Forell/Elsesser Engineers. The 660-foot-long serpentine-shaped building sits on a structural framework 40 to 70 feet off the ground to accommodate the hillside’s steep 60-degree slope.

| May 18, 2011

New center provides home to medical specialties

Construction has begun on the 150,000-sf Medical Arts Pavilion at the University Medical Center in Princeton, N.J.

| May 18, 2011

Improvements add to Detroit convention center’s appeal

Interior and exterior renovations and updates will make the Detroit Cobo Center more appealing to conventioneers. A new 40,000-sf ballroom will take advantage of the center’s riverfront location, with views of the river and downtown.

| May 18, 2011

One of Delaware’s largest high schools seeks LEED for Schools designation

The $82 million, 280,000-sf Dover (Del.) High School will have capacity for 1,800 students and feature a 900-seat theater, a 2,500-seat gymnasium, and a 5,000-seat football stadium.

boombox1
boombox2
native1

More In Category




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021