The Thornton Tomasetti Board of Directors and Managing Principals announce the promotion of Thomas D. Poulos, P.E., S.E., to senior principal, and Edward M. Peck, AIA, LEED AP, Robert M. Stadler, P.E., S.E., and Adam Abbes Yala, Ph.D., P.E., to vice presidents in the Chicago office of the international engineering firm.
Poulos, who leads the firmās aviation market sector, has been with Thornton Tomasetti since 1997. He has more than 20 years of experience leading complex projects for all types of structures, including design-build.
Peck, the leader of Thornton Tomasettiās Midwest U.S. Building Skin practice, has been with the firm since 2008. He has more than 15 years of experience in architecture, building skin technologies, and building systems. Throughout his career, he has specialized in projects involving sustainable and innovative building skins, most notably ETFE (ethylene tetrafluoroethylene). He has provided building skin services for a wide range of building types including hospitals, performing arts venues, office buildings, and sports and entertainment facilities.
Stadler joined Thornton Tomasetti in 1998 and has broad exposure to projects of all sizes, from tenant build-outs to high-rise buildings and long-span structures. His work spans several market sectors, including residential, commercial, healthcare, aviation, cultural, educational, and sports facilities. He specializes in economical structural solutions using all types of building materials and has experience in building design in high seismic regions
Dr. Yala joined Thornton Tomasetti in 1999. He has provided structural design and analysis services from schematic design through construction administration for many major projects, including office, residential, hospitality, aviation, and sports facilities as well as special structures. He is also well-versed in building renovations and restorations, faƧade repairs, investigations, evaluations, condition assessment and litigation support. +
Related Stories
| Feb 29, 2012
Construction begins on Keller Army Community Hospital addition
The 51,000 square foot addition will become the home for optometry, ophthalmology, physical therapy, and orthopedics clinics, as well as provide TRICARE office space.
| Feb 29, 2012
Carvalho appointed Shawmut Safety Director
He has been a driving force behind multiple safety-orientated initiatives at Shawmut, including Safety Week, the creation of an online safety manual, and the implementation of a new safety reporting and tracking system.Ā
| Feb 29, 2012
Shepley Bulfinch selected to design new Childrenās Hospital of Buffalo
The firm was selected because of their past experience in designing clinically complex facilities that emphasize patient- and family-centered care and operational efficiency as well as distinctive architectural forms for many other children's and women's hospitals.
| Feb 28, 2012
Roofing contractors recognized for workmanship
Sika Sarnafil announces Project of the Year winners; competition highlights visually stunning, energy efficient, and sustainable roofs.
| Feb 28, 2012
Waste Management awards companies for sustainable construction
This recognition, highlighting sustainable performances within the construction industry, looks to celebrate the builders who achieved important sustainability milestones in 2011, as determined by Waste Managementās onlineĀ Diversion and Recycling Tracking Tool.
| Feb 28, 2012
Salem State University Library & Learning Commons topped off
When it opens to students in the fall of 2013, the $60 million facility will offer new archival space; circulation and reference areas; collections; reading spaces; study rooms; instruction labs and a Deanās suite.Ā
| Feb 28, 2012
More than 1,000 have earned EDAC certification since 2009
Milestone achieved as evidence-based design becomes a top 2012 strategy for healthcare organizations.
| Feb 28, 2012
McCarthy completes second phase of San Diegoās Scripps Hospital
Representing the second phase of a four-phased, $41.3 million expansion and remodeling project, the new addition doubles the size of the existing emergency department and trauma center to encompass a combined 27,000 square feet of space.Ā
| Feb 28, 2012
LUMEnergi names Weinbaum president and CEO
Weinbaumās experience spans communications, nanotechnology, electronics components, consumer products, semiconductors, software, wireless and lighting.
| Feb 28, 2012
Griffin Electric completes Medical University of South Carolina project
The 210,000-sf complex is comprised of two buildings, and houses research, teaching and office areas, plus conference spaces for the University.