flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Thornton Tomasetti announces four promotions in Chicago office

Thornton Tomasetti announces four promotions in Chicago office

Promotions in Thornton Tomasetti office key on industy veterans.


By Posted by Tim Gregorski, Senior Editor | July 31, 2012
This article first appeared in the September 2012 issue of BD+C.

The Thornton Tomasetti Board of Directors and Managing Principals announce the promotion of Thomas D. Poulos, P.E., S.E., to senior principal, and Edward M. Peck, AIA, LEED AP, Robert M. Stadler, P.E., S.E., and Adam Abbes Yala, Ph.D., P.E., to vice presidents in the Chicago office of the international engineering firm.

Poulos, who leads the firm’s aviation market sector, has been with Thornton Tomasetti since 1997. He has more than 20 years of experience leading complex projects for all types of structures, including design-build.

Peck, the leader of Thornton Tomasetti’s Midwest U.S. Building Skin practice, has been with the firm since 2008. He has more than 15 years of experience in architecture, building skin technologies, and building systems. Throughout his career, he has specialized in projects involving sustainable and innovative building skins, most notably ETFE (ethylene tetrafluoroethylene). He has provided building skin services for a wide range of building types including hospitals, performing arts venues, office buildings, and sports and entertainment facilities.

Stadler joined Thornton Tomasetti in 1998 and has broad exposure to projects of all sizes, from tenant build-outs to high-rise buildings and long-span structures. His work spans several market sectors, including residential, commercial, healthcare, aviation, cultural, educational, and sports facilities. He specializes in economical structural solutions using all types of building materials and has experience in building design in high seismic regions

Dr. Yala joined Thornton Tomasetti in 1999. He has provided structural design and analysis services from schematic design through construction administration for many major projects, including office, residential, hospitality, aviation, and sports facilities as well as special structures. He is also well-versed in building renovations and restorations, façade repairs, investigations, evaluations, condition assessment and litigation support. +

Related Stories

| Jun 13, 2013

AIA partners with industry groups to launch $30,000 'Designing Recovery' design competition

The program will award a total of $30,000 to three winning designs, divided equally between three locations: Joplin, Mo., New Orleans, and New York. 

| Jun 12, 2013

More than 90% of New York City schools have code violations

More than 90% of New York City schools have at least one outstanding building code violation. Loose wires, stuck doors and inadequate ventilation are just some of the problems.

| Jun 12, 2013

5 building projects that put the 'team' in teamwork

The winners of the 2013 Building Team Awards show that great buildings cannot be built without the successful collaboration of the Building Team. 

| Jun 12, 2013

Sacred synergy achieves goals for religious education [2013 Building Team Award winner]

A renovation/addition project at Columbia Theological Seminary unites a historic residence hall with a modern classroom facility.

| Jun 12, 2013

‘Talking’ Braille maps help the visual impaired

Talking pen technology, combined with tactile maps, allows blind people to more easily make their way around BART stations in the Bay Area.

| Jun 11, 2013

Music/dance building supports sweet harmony [2013 Building Team Award winner]

A LEED Gold project enhances a busy Chicago neighborhood, meeting ambitious criteria for acoustical design and adaptability.

| Jun 11, 2013

Vertical urban campus fills a tall order [2013 Building Team Award winner]

Roosevelt University builds a 32-story tower to satisfy students’ needs for housing, instruction, and recreation.

| Jun 11, 2013

Building a better box: High-bay lab aims for net-zero [2013 Building Team Award winner]

Building Team cooperation and expertise help Georgia Tech create a LEED Platinum building for energy science.

| Jun 11, 2013

Finnish elevator technology could facilitate supertall building design

KONE Corporation has announced a new elevator technology that could make it possible for supertall buildings to reach new heights by eliminating several problems of existing elevator technology. The firm's new UltraRope hoisting system uses a rope with a carbon-fiber core and high-friction coating, rather than conventional steel rope.

| Jun 10, 2013

Lake Washington STEM school combines modular and site-built construction to meet ambitious schedule

When the Lake Washington School District outside Seattle needed a new high school built on an ambitious permitting and construction schedule of seven months, modular construction proved to be an ideal solution.

boombox1
boombox2
native1

More In Category




Great Solutions

41 Great Solutions for architects, engineers, and contractors

AI ChatBots, ambient computing, floating MRIs, low-carbon cement, sunshine on demand, next-generation top-down construction. These and 35 other innovations make up our 2024 Great Solutions Report, which highlights fresh ideas and innovations from leading architecture, engineering, and construction firms.

halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021