flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Thornton Tomasetti acquires green consulting firm Fore Solutions

Thornton Tomasetti acquires green consulting firm Fore Solutions

International engineering firm launches new building sustainability practice.


By By BD+C Staff | January 9, 2012
Thornton Tomasetti acquires green consulting firm Fore Solutions
Uniting Fore Solutions and Thornton Tomasetti enables Thornton Tomasetti to address the sustainability requirements for any clie
This article first appeared in the February 2012 issue of BD+C.

Thornton Tomasetti, the international engineering firm, announces the acquisition of Fore Solutions, a green building consulting firm that will allow Thornton Tomasetti to significantly expand its sustainability consulting services and integrate green objectives across all its practices.

The new Building Sustainability practice will be headed by Gunnar Hubbard, Fore Solution’s principal and founder, who becomes a principal at Thornton Tomasetti. Wolfgang Werner, formerly director of sustainability, becomes a vice president and head of the practice’s East U.S. region.

Key points:

  • The phenomenal growth of the green building movement in recent years means that sustainability is here to stay. By 2015, approximately half of new construction in the United States is estimated to incorporate some measure of sustainability.
  • The addition of Fore Solutions gives Thornton Tomasetti expanded experience and an established brand in the green building world.
  • With the creation of its Green Building Strategy Team in 2007 and a sustainability department in 2010, Thornton Tomasetti started offering sustainability services and performing sustainability project work. The addition of Fore Solutions will greatly advance Thornton Tomasetti’s sustainability services effort to address clients’ needs for high-performance, energy-efficient buildings.

The Fore Solutions team will remain based in Portland, Maine, which is now a Thornton Tomasetti office within the East U.S. region. BD+C

Related Stories

| Feb 7, 2012

Thornton Tomasetti opens new office in Denver

The firm, which now has 25 offices internationally, opened the new office to better serve current and potential clients in the western Central region and Mountain States.

| Feb 6, 2012

Slight increase in nonres construction spending expected in 2012, growth projected for 2013

Commercial sector expected to lead real estate recovery.

| Feb 6, 2012

FMI releases 2012 Construction Productivity Report

Downsizing has resulted in retaining the most experienced and best-trained personnel who are the most capable of working more efficiently and harder.

| Feb 6, 2012

Kirchhoff-Consigli begins Phase 2 renovations at FDR Presidential Library and Museum

EYP Architecture & Engineering is architect for the $35 million National Archives Administration project.

| Feb 6, 2012

Batson-Cook announces the appointment of Hall as president

Hall will manage and direct all aspects of the firm’s day-to-day operations. He will be based in Batson-Cook’s Atlanta office.

| Feb 6, 2012

Siemens gifts Worcester Polytechnic Institute $100,000 for fire protection lab renovation

Siemens support is earmarked for the school’s Fire Protection Engineering Lab, a facility that has been forwarding engineering and other advanced degrees, graduating fire protection engineers since 1979.

| Feb 2, 2012

Call for Entries: 2012 Building Team Awards. Deadline March 2, 2012

Winning projects will be featured in the May issue of BD+C. 

| Feb 2, 2012

VLK Architects selected for new Cypress, Texas elementary school

The Bridgeland Elementary School will be a new prototype school for the District. Designed to meet the requirements of The Collaborative for High Performance Schools.

| Feb 2, 2012

Mortenson Construction to build 2.4 MW solar project in North Carolina

Located on a 12 acre site in the Sandhills region, the 2.4 megawatt (MW) system is expected to generate approximately 3.5 million kilowatt hours (kWhs) of clean electricity on an annual basis.

boombox1
boombox2
native1

More In Category




Resiliency

U.S. is reducing floodplain development in most areas

The perception that the U.S. has not been able to curb development in flood-prone areas is mostly inaccurate, according to new research from climate adaptation experts. A national survey of floodplain development between 2001 and 2019 found that fewer structures were built in floodplains than might be expected if cities were building at random.

halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021

Â