Phase 3 of the High Line, New York City’s ambitious landscape redevelopment project, opened on Saturday, September 20. Since 2006, the High Line has been converting abandoned elevated railroad tressles along 1.45 miles of Manhattan’s Lower West Side into a free public park that parallels the Hudson River.
The first two sections of the park already draw more than five million visitors a year, according Crain’s New York.
The $35 million Phase 3, known as High Line at the Rail Yards, broke ground September 20, 2012, and officially opened to the public on September 21, according to Friends of the High Line, the nonprofit organization that has raised most of the money for the project. This half-mile stretch runs from West 30th Street at 10th Avenue (previously the railway’s northern terminus) to West 34th Street at 12th Avenue, across from the Jacob K. Javits Convention Center.
James Corner Field Operations is the High Line’s designer, working with Diller Scofidio + Renfro and Piet Oudolf.
The newest section—which curves around the 26-acre Hudson Yards real estate development—incorporates some of the old tracks and switches (made safe for pedestrian passage and play), as well as wild plant life.
The opening ceremonies included New York Senator Charles Schumer, New York City Comptroller Scott Stringer, High Line founder and president Joshua Davis, and actor Edward Norton, who is on Friends of the High Line’s board.
The finishing touch will be put in place next year with the installation of a short stub along 10th Avenue and 30th Street, according to the real estate website Curbed.
Related Stories
| Oct 19, 2011
System for installing grease duct enclosures achieves UL listing
Updated installation results in 33% space savings.
| Oct 18, 2011
Michel Bruneau wins 2012 AISC T.R. Higgins Award
The AISC T.R. Higgins Lectureship Award is presented annually by the American Institute of Steel Construction (AISC) and recognizes an outstanding lecturer and author whose technical paper(s) are considered an outstanding contribution to the engineering literature on fabricated structural steel.
| Oct 18, 2011
Dow Building Solutions invests in two research facilities to deliver data to building and construction industry
State-of-the-art monitoring system allows researchers to collect, analyze and process the performance of wall systems.
| Oct 18, 2011
Architectural leaders join Gehry to form strategic alliance
Alliance dedicated to transforming the building industry through technology.
| Oct 18, 2011
St. Martin’s Episcopal School expands facilities
Evergreen commences construction on environmentally sustainable campus expansion.
| Oct 17, 2011
THOUGHT LEADER: Allan Bilka, Senior Staff Architect and Secretariat to the IGCC
Allan Bilka, RA, is a Senior Staff Architect and Secretariat to the International Green Construction Code (IgCC) with the International Code Council, based in the ICC’s Chicago district office. He also serves as staff liaison to the ICC-700 National Green Building Standard. He has written several ICC white papers on green building and numerous green-related articles for the ICC. A registered architect, Bilka has over 30 years of combined residential design/build and commercial consulting engineering experience.
| Oct 17, 2011
Austin's newest urban apartment complex under construction
Complex sits on a four-acre waterfront site along Lady Bird Lake with spectacular city and lake views, and is slated to open spring 2013.
| Oct 17, 2011
Aerialogics announces technology partnership with CertainTeed Corp.
CertainTeed to provide Aerialogics’ Aerial Measurement Services to its credentialed contractor base and utilize the technology in its Roofing Products Division.
| Oct 17, 2011
Big D Floor covering supplies to offer Johnsonite Products??
Strategic partnership expands offering to south and west coast customers.