While Texas’s cancer rate per 100,000 residents is among the lowest in the nation, more than 133,730 Texans will be diagnosed with cancer in 2021, including nearly 21,000 new breast cancer patients, according to The American Cancer Society’s estimates.
To expand access to comprehensive cancer care, Texas Oncology—with 500-plus physicians and 210 locations across the state—recently broke ground on a 22,300-sf cancer care center in Fort Worth’s Alliance Town Center. When it opens next year, the cancer center will provide medical oncology, hematology, radiation oncology and infusion treatments.
“The development of this new cancer care facility confirms our commitment to providing innovative comprehensive, and individualized care for patients across Texas,” says R. Steven Paulson, M.D., president and chairman of Texas Oncology.
AGGRESSIVE GROWTH
The recently opened cancer care center in Denison, Texas, consolidates two older facilities.
The building will replace an existing Texas Oncology site in Keller, Texas. The building team executing this project includes the developers Hillwood and Meridien, architects Corgan and E4H, and the general contractor DPR Construction.
Last month, Texas Oncology consolidated its locations in Sherman and Denison, Texas, into a new 26,000-sf cancer care center in Denison, with an integrated team of six physicians and more than 85 support staff. And in April, Texas Oncology and Christus Health broke ground on an 85,000-sf Northeast Texas Cancer and Research Institute in Tyler, Texas, with an anticipated 2022 opening. The Tyler facility will include 30,000 sf of clinic space and nearly 3,000 sf for research. Christus Health will house a 7,500-sf advanced imaging center. Another 10,000 sf will support the surgical oncology programs of the Louise Herrington Cancer Center.
Related Stories
Coronavirus | May 22, 2020
COVID-19: Healthcare designers look to the future of medical facilities in light of coronavirus pandemic
The American College of Healthcare Architects (ACHA) has released the key findings of a survey of its members revealing their insights on the future of healthcare architecture and the role of design in the context of the COVID-19 healthcare crisis.
Healthcare Facilities | May 5, 2020
Holt Construction, U.S. Army Corps of Engineers complete temporary hospital in two weeks
The project is located in Paramus, N.J.
Coronavirus | Apr 26, 2020
PCL Construction rolls out portable coronavirus testing centers
The prefabricated boxes offer walk-up and drive-thru options.
Coronavirus | Apr 21, 2020
COVID-19 update: CallisonRTKL, Patriot, PODS, and USACE collaborate on repurposed containers for ACFs
CallisonRTKL and PODS collaborate on repurposed containers for ACFs
Coronavirus | Apr 14, 2020
COVID-19 alert: Missouri’s first Alternate Care Facility ready for coronavirus patients
Missouri’s first Alternate Care Facility ready for coronavirus patients
Coronavirus | Apr 10, 2020
COVID-19: Converting existing hospitals, hotels, convention centers, and other alternate care sites for coronavirus patients
COVID-19: Converting existing unused or underused hospitals, hotels, convention centers, and other alternate care sites for coronavirus patients
Coronavirus | Apr 9, 2020
COVID-19 alert: Robins & Morton to convert Miami Beach Convention Center into a 450-bed field hospital
COVID-19 alert: Robins & Morton to convert Miami Beach Convention Center into a 450-bed field hospital
Coronavirus | Apr 4, 2020
COVID-19: Construction completed on first phase of Chicago's McCormick Place into Alternate Care Facility
Walsh Construction, one of the largest contractors in the city of Chicago and in the United States, is leading the temporary conversion of a portion of the McCormick Place Convention Center into an Alternate Care Facility (ACF) for novel coronavirus patients. Construction on the first 500 beds was completed on April 3.
Coronavirus | Apr 1, 2020
TLC’s Michael Sheerin offers guidance on ventilation in COVID-19 healthcare settings
Ventilation engineering guidance for COVID-19 patient rooms
Healthcare Facilities | Mar 29, 2020
A ‘roadmap’ for building hospitals in rural and underfunded markets
Hoar Construction’s formula emphasizes preconstruction planning and input from healthcare workers.