flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Texas flood prevention initiative would create nation’s most ambitious barrier system

Codes and Standards

Texas flood prevention initiative would create nation’s most ambitious barrier system

Plan including sand dunes and mechanical barriers would cost as much as $32 billion.


By Peter Fabris, Contributing Editor | August 22, 2019

Courtesy Pixabay

A plan being developed by the Texas General Land Office and the U.S. Army Corps of Engineers would spend as much as $32 billion to protect the Houston-Galveston area from storm surges.

The project would construct the nation’s most ambitious and expensive coastal barrier system. It would consist of 12-foot-high sand dune-topped levees to protect beachfront homes and businesses as well as a storm surge barrier system.

The plan has already gone through revisions to make it more effective and more environmentally friendly. The plan has drawn criticism from the Galveston business community which says a proposed ring levee would hinder cargo and passenger loading at the Port of Galveston. Environmentalists are concerned that a gate system between Galveston and Bolivar to block storm surges would diminish exchange of saltwater and freshwater between Galveston Bay and the Gulf of Mexico that is important to marine life.

The Houston-Galveston region, home to millions of people and the nation’s largest petrochemical complex, is vulnerable to massive storm surges and currently has no comprehensive storm protection system.

Related Stories

Codes and Standards | Nov 19, 2021

Construction Startup Competition 2021 awards highlight tech innovations

AI-powered software to identify and explain critical issues in construction contracts takes top prize.

Codes and Standards | Nov 18, 2021

Infrastructure bill contains $5 billion for energy efficiency in buildings

Wide range of programs to reduce energy use, improve materials, train workers.

Codes and Standards | Nov 17, 2021

Skanska will provide embodied carbon assessments on all new projects over 53,000 sf

Will use the Embodied Carbon in Construction Calculator it helped create.

Codes and Standards | Nov 16, 2021

NOAA, Univ. of Maryland, and ASCE partner on climate-smart engineering codes, standards

Efforts will account for climate change in future infrastructure design and construction.

Codes and Standards | Nov 15, 2021

Intl. Code Council and Modular Building Institute release new off-site construction standards

‘Will create consistency for off-site construction; accelerate the industry’.

Codes and Standards | Nov 12, 2021

GSA will likely shrink federal office space post-COVID

Agency also needs to address maintenance backlog.

Codes and Standards | Nov 10, 2021

Los Angeles launches fast-track office tenant improvements program

Red tape to be cut to make interiors healthier and safer.

Codes and Standards | Nov 9, 2021

Florida state building professionals call for mandatory high-rise building inspections

Group recommendation comes in wake of Surfside condo collapse.

Codes and Standards | Nov 8, 2021

Dept. of Energy to fund 10 pilot smart building projects

Connected communities will accelerate renewable energy adoption and grid resilience.

Codes and Standards | Nov 3, 2021

Fact sheets offer strategies to improve indoor air quality in schools

Center for Green Schools at USGBC document for people without a technical background.

boombox1
boombox2
native1

More In Category

Warehouses

California bill would limit where distribution centers can be built

A bill that passed the California legislature would limit where distribution centers can be located and impose other rules aimed at reducing air pollution and traffic. Assembly Bill 98 would tighten building standards for new warehouses and ban heavy diesel truck traffic next to sensitive sites including homes, schools, parks and nursing homes.




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021