The City of Rowlett, Texas, has sued the developer of a $1 billion mixed-use project for not adhering to approved plans.
According to city officials, the Bayside development is in default of their development agreement with the city. The developer is accused of changing features that city officials felt were critical to the project’s success after the city met its obligations.
Rowlett had agreed to economic development incentives, created a tax increment reinvesting zone, and sought state tax support for a convention center. The city said the developers changed the original vision by eliminating a planned eight-acre Crystal Lagoon, trolley, and one-acre show fountain, and reduced the amount of restaurant, retail and entertainment space by 55%. The revised plan also would increase the space for residential development from 29 acres to 50 acres.
“Bayside is a public-private partnership, and our development partner is obligated to adhere to the vision for Bayside with which both parties are contractually committed; any changes to the vision require city approval,” Mayor Tammy Dana-Bashian said in city news release. “We are disappointed that it has reached this point and that we are forced to take this action.”
Related Stories
| May 31, 2012
Lawsuits push the legal boundaries of green building definition
This article explores some legal issues stemming from lawsuits in which plaintiffs have charged developers with not delivering on a promised level of sustainability.
| May 31, 2012
ANSI approves Green Building Initiative’s design standard
The Green Building Initiative (GBI), a Portland, Ore. nonprofit organization, has had its new consensus-based standard for the design, construction, and operations of environmentally friendly buildings approved by the American National Standards Institute (ANSI).
| May 31, 2012
USGBC testing Minnesota buildings to see if they are living up to LEED standards
The Minnesota chapter of the U.S. Green Building Council (USGBC) has teamed up with EnergyPrint, a St. Paul, Minn. energy consulting firm, to study the energy and water use of more than 150 buildings in the state that have LEED certification.
| May 29, 2012
Reconstruction Awards Entry Information
Download a PDF of the Entry Information at the bottom of this page.
| May 25, 2012
Major retail chains welcome LEED Volume option
Large national chains such as Starbucks, Marriott, Verizon, and Kohl’s are welcoming the LEED Volume Program that enables them to batch certify similar projects.
| May 25, 2012
Alaska’s okay of gravel aggregate with naturally occurring asbestos opens up development
Some long-delayed projects in the Upper Kobuk region of Alaska may now move forward thanks to legislation that allows construction in areas that have naturally occurring asbestos.
| May 25, 2012
Las Vegas building codes may thwart innovative shipping container development
A developer wants to build a commercial development out of steel shipping containers in Las Vegas, but city codes would have to be altered or the project would have to obtain waivers for it to receive the city’s go-ahead.
| May 25, 2012
Collapse of Brooklyn building that killed worker blamed on improperly braced frame
The Occupational Safety and Health Administration cited SP&K Construction with 11 safety violations, for which it could face more than $77,000 in fines.
| May 25, 2012
Study: Safety inspections don’t hurt the bottom line
A new study suggests that random safety inspections by regulators help reduce injury claims without hurting profits.