flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Test method for vertical fenestration installation procedures updated

Codes and Standards

Test method for vertical fenestration installation procedures updated

FGIA issues first update for document created in 2005.


By Peter Fabris, Contributing Editor | December 10, 2020

Courtesy Pixabay

The Fenestration and Glazing Industry Alliance (FGIA) has updated a test method evaluating the performance and durability of the integration of a fenestration product with a building envelope.

AAMA 504-20, Voluntary Laboratory Test Method to Qualify Vertical Fenestration Installation Procedures, was created in 2005. This marks the document’s first update.

Manufacturers should be aware that they are ultimately responsible for providing adequate installation instructions for their products, according to an FGIA news release. However, the document can serve as a guide.

“AAMA 504 provides a standardized test method for all manufacturers to verify their various installation instructions in a consistent manner,” said Joe Hayden vice chair of the Test Method to Qualify Installation Procedures Update Task Group and a Pella Corporation executive.

Related Stories

Codes and Standards | Feb 11, 2016

New York governor makes emergency design-build authorization

The declaration was issued in response to Winter Storm Jonas which dumped over 18 inches of snow in parts of the state.

Green | Jan 29, 2016

USGBC names top 10 states for LEED green building

Illinois leads the list for the third straight year.

Codes and Standards | Jan 25, 2016

Dept. of Energy releases decision guides for plug and process loads

Plug and process loads consume about 30% of the primary energy in U.S. commercial buildings today.

Codes and Standards | Jan 22, 2016

ConsensusDocs releases new multi-party IPD agreement and joining agreement

The documents serve as a comprehensive revision of previous IPD agreement

Codes and Standards | Jan 22, 2016

State Savings Calculator analyzes savings associated with energy codes

The calculator breaks down the cost-effectiveness of energy codes on a state-by-state basis.

Codes and Standards | Jan 22, 2016

Metal Roofing Seaming Guide published by Metal Construction Association

The free document is specifically tailored for metal roof installation.

Codes and Standards | Jan 22, 2016

Treasury Dept. will start crackdown on illicit money in luxury real estate

The move is expected to impact high-end condo development.

Resiliency | Jan 13, 2016

LEED credits on resiliency expected to influence future of building design

Post-disaster survivability is a key goal.

Codes and Standards | Jan 12, 2016

Batteries are the next step in raising sustainability standards

Battery technology will reduce electricity costs and promote a more stable, flexible grid.

Codes and Standards | Jan 4, 2016

Denver broadens its use of design reviews as construction booms

Support strong, but some wary of giving more say to review boards.  

boombox1
boombox2
native1

More In Category


Contractors

Conflict resolution is a critical skill for contractors

Contractors interact with other companies seventeen times a day on average, and nearly half of those interactions (eight) involve conflicts, according to a report by Dodge Construction Network and Dusty Robotics. The study suggests that specialty trade contractors, in particular, rarely experience good resolution from conflicts. 



Warehouses

California bill would limit where distribution centers can be built

A bill that passed the California legislature would limit where distribution centers can be located and impose other rules aimed at reducing air pollution and traffic. Assembly Bill 98 would tighten building standards for new warehouses and ban heavy diesel truck traffic next to sensitive sites including homes, schools, parks and nursing homes.

halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021